ML043280280
| ML043280280 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 11/03/2004 |
| From: | Maciuska F Constellation Energy Group |
| To: | Conte R NRC/RGN-I/DRS/OSB |
| Conte R | |
| References | |
| Download: ML043280280 (36) | |
Text
Page:
Job Performance Measure Exam 27-Sep-2004 JPM NO JC076.007 Perform ATTACHMENT NO SW PUMPS Revision #:
0 Review Date:
Location:
Simulator Estimated Time (minutes):
Candidate:
10.00 Evaluator:
Actual Time:
Trainee Performance:
Satisfactory Unsatisfactory Trainee:
Instructor:
Submitted By Date Reviewed By Date
. I Page:
Job Performance Measure Exam 27-Sep-2004 NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING Ini tia 1 Conditions:
Option 1 : The plant was at 100% power when all S W pumps tripped and could not be restarted.
The crew tripped the Reactor. The E-0 immediate actions have been performed. The crew has just entered ES-0.1, "REACTOR TRIP RESPONSE."
Option 2: The plant was at 100% power when Alarm L-12, "Condenser Pit or Screenhouse High Level 6" was received followed by L-1 5 and L-23, "Bus 17/18 Undervoltage" and L-5, "Safeguard Bus Main Breaker Overcurrent Trip". The E-0 immediate actions have been performed. The crew has just entered ES-0.1, "REACTOR TRIP RESPONSE."
'W Initiating Cues :
The CRF directs you to perform Att-2.4 "ATTACHMENT NO SW PUMPS" while the rest of the crew continues with ES-0.1 "REACTOR TRTP RESPONSE".
I I
31 Page:
I 27-sep-2004 Job Performance Measure Exam
==
Description:==
Respond to a Total Loss of SW JPM Tasks Task ID: 076-004-05-01 Task Standards In accordance with the procedure Tools :
Installed indication Procedures Installed switches/pushbuttons Terminating: Cues Task Completion References :
ID v
P U T T ATT-2.4 DescriDtion ATTACHMENT NO SW PUMPS Safety Considerations :
Consequences of Inadequate Performance:
Equipment Damage Thermal design limit challenge Procedure Violation General Comments :
Review Date Ref Flap Simulator setup with Reactor tripped from 100% power, Option 1 - All service water pumps tripped, Option 2 - bus 17 & 18 de-energized and both D/Gs running unloaded. (Malf CRC03A, 200,000; Malf EDS 04C, 04D) u
r -
I 4 1 Page:
Job Performance Measure Exam I 27-sep-2004 Performance Checklist Element :
Conditions :
Standards :
Cue CUE: Give examinee a copy of PUMPS.
ATT-2.4 ATTACHMENT NO SW Comments :
Satisfactory Unsatisfactory 0 Element :
Conditions :
Standards :
Note - Steps 1 through 5 should be performed promptly to avoid equipment damage.
prompt manner.
Comments :
Ensure examinee reads note and performs steps in a Satisfactory 0
Unsatisfactory 0 Element :
CRITICAL Conditions :
Standards :
Trip both RCPs.
Comments :
Locates control switches for RCPs and trips both RCPs Satisfactory 0 Unsatisfactory
[7 Element :
CRITICAL Conditions :
Standards :
Determine if any D/G running Option 1) No D/G running (Go to Same as Element.
without alternate cooling.
e o
t h
D/G running (Go to Comments :
Satisfactory Unsatisfactory 0
~
~~~
Element :
CRITICAL Conditions :
Standards :
Pull stop the affected D/G.
D/Gs can be shutdown in any order.
Locates control switch for A D/G and takes switch to pull stop.
Comments :
Satisfactory Unsatisfactory 0
Page:
5 Job Performance Measure Exam 2 7-Sep-2004 L,
- 6 Element:
CRITICAL Conditions :
Immediately depress voltage shutdown pushbutton for A D/G Standards :
Locates voltage shutdown pushbutton for A D/G and immediately depresses pushbutton.
Comments :
Satisfactory 0
Unsatisfactory c]
- 7 Element:
CRITICAL Conditions :
Pull stop the affected D/G.
Standards :
Locates control switch for B D/G and takes switch to pull stop.
Comments :
Satisfactory 0 Unsatisfactory 0
- 8 Element:
CRITICAL Conditions :
Immediately depress voltage shutdown pushbutton for B D/G i/
Comments :
Satisfactory Standards :
Locates voltage shutdown pushbutton for B D/G and immediately depresses pus hbutton.
Unsatisfactory c]
9 Element :
Conditions :
Directs an A 0 to align alternate cooling to both D/Gs using ER-D/G. 2.
Comments :
Satisfactory
~
Standards :
Contacts A 0 and directs A 0 to align alternate cooling to DIGS per ER-D/G.2.
Unsatisfactory 0 10 Element :
Conditions :
Determine if Bus 17 has been potentially damaged.
Standards :
Based on initial conditions determines that Bus 17 has been possibly damaged, Directs A 0 to locally open breaker 1B3, B D/G Is01 Bkr to Bus 17 in B D/G room.
I I
Page:
Job Performance Measure Exam 2 7-Sep-2004 Comments :
Satisfactory Unsatisfactory 0 11 Element:
Close Letdown isolation, AOV-427 Conditions :
Comments :
Satisfactory Standards :
Locates control switch for AOV-427 and places control switch in close.
Unsatisfactory 0 12 Element:
Conditions :
Close excess letdown, HCV-123
- Comments:
Satisfactory 0 Standards :
Locates manual controller for HCV-123 and adjusts ( or verifies) controller has "0" demand and no pressure indicated on PI-12 1.
Unsatisfactory 0
- 13 Element:
CRITICAL Close both MSIVs.
Conditions :
Standards :
Locates control switch for AOV-35 16) and closes both MSIVs.
MSIVS (AOV-35 17 &
CUE: The other operator will control temperature using ARV's.
Comments :
Satisfactory 0 Unsatisfactory
- 14 Element:
CRITICAL Conditions :
Pull stop control switches for both MDAFW pumps.
Comments :
L, Satisfactory Standards :
Locates control swithes for A and B AFW pumps and places both switches in pull stop.
Unsatisfactory 0
Page:
7 Job Performance Measure Exam 2 7-Sep-2004
- 15 Element:
CRITICAL Conditions :
Pull stop control switches for all four CNMT Recirc Fans.
Standards :
Locates control switches for all four CNMT Recirc Fans and places switches in pull stop.
Comments :
Satisfactory Unsatisfactory 0 16 Element:
Conditions :
Pull stop control switches for both MF W pumps.
Standards :
Locates control switches for both MFW pumps and places switches in pull stop.
Comments :
Satisfactory 0 Unsatisfactory 0 17 Element:
Conditions :
Pull stop control switches for Condensate Pumps.
i/
Comments :
Satisfactory 0
Standards :
Locates control switches for Condensate pumps and places all three switches in pull stop.
Unsatisfactory 0 18 Element:
Conditions :
Standards :
Monitor CCW temperature.
Option 1) Cue: No further actions Monitors CCW temperature and determines temperature less than 125F. No action needs to be taken to stop ccw.
Comments :
Satisfactory Unsatisfactory 19 Element:
Conditions :
CUE: Report to examinee as A 0 that alternate cooling has been aligned to "A" D/G.
i-Standards :
Examinee will acknowledge that alternate cooling has been aligned to "A" D/G and returns to step 2.e of Att-2.4.
Page:
8 Job Performance Measure Exam 27-Sep-2004 Comments :
Satisfactory Unsatisfactory 20 Element:
Conditions :
Place "A" D/G control switch to Auto Standards :
Locates and places control switch for "A" D/G to AUTO.
Comments :
Satisfactory Unsatisfactory 0 21 Element:
Conditions :
Depress "A" D/G RESET and DIG FEILD RESET pushbuttons.
Standards :
Locates and depresses the "D/G RESET" and D/G FEILD RESET" for "A" D/G.
Comments :
u Satisfactory 0 Unsatisfactory 0 22 Element:
Conditions :
Observe restart of "A" D/G Standards :
Observeherifj auto restart of "A" D/G by observing frequency and voltage on "A" D/G.
Comments :
Satisfactory Unsatisfactory 0 23 Element:
Conditions :
CUE: No further action.
Standards :
Comments :
Satisfactory 0 Unsatisfactory 0
I I
9 1 Page:
I 27-sep-2004 Job Performance Measure Exam I
I W
JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag
Page:
I Job Performance Measure Exam 28-Oct-2004 JPM NO JR062.026 Restore Power to One Train from D/G per AP-ELEC.3 Revision #:
2 Review Date:
9/16/2004 Location:
Simulator Estimated Time (minutes):
14.00 Candidate:
Evaluator:
Actual Time:
Trainee Performance:
Satisfactory Unsatisfactory Trainee:
Instructor:
Submitted By Date Reviewed By Date
l/
Page:
Job Performance Measure Exam 28-Oct-2004 NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING Init ia 1 Conditions :
The plant is in a refueling outage. RCS Loop Level is currently 84 inches with RCS temperature less than 100 degrees. The plant has just experienced a loss of offsite power. D/G "A" started and loaded onto Bus 18, but did not load onto Bus 14. D/G "B" did not start, attempts to start from the MCB did not work. Procedure AP-ELEC.3, LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW 350 DEGREES) has been entered.
Initiating Cues :
You have been directed to attempt to restore power to Bus 14 from D/G "A" per ER-D/G. 1.
28-Oct-2004 Job Performance Measure Exam Page:
31
==
Description:==
Restore Power to One Train of AC Emergency Buses with Emergency D/G (CT ER JPM Tasks Task ID: 062-033-05-01A Task Standards Bus 14 energized by "A" Diesel Generator Tools :
Terminating Cues References :
ID -
PRAP AP-ELEC.3 PRER ER-D/G. I DescriDtion Review Date Ref Flag LOSS OF 12A AND/OR 12B TRANSFORMER (BELOW 350 F)
RESTORING DIGS Safety Considerations Consequences of Inadequate Performance:
General Comments :
0 Start sim in IC-2,84 inches, RHR inservice. Insert MALF GEN04B (TRIP ALL COND) for D/G "B".
Insert MALF GEN09A to fail Bus 14 breaker Auto Close. Insert MALF EDS06 (FAST) for Loss of Offsite Power. Reset Control Room lights on inside MCB, ensure Service Water Pump has auto started, then freeze simulator to give Initial Conditions and Cue.
Page:
4 Job Performance Measure Exam 28-Oct-2004 Performance Checklist 1
Element :
Conditions :
Review procedure ER-D/G. 1.
Comments :
Satisfactory 0 Standards :
Determine Section 4.4 provides needed direction.
Unsatisfactory 0 2
Element :
Conditions :
Verify D/G "A" output voltage approximately 480 volts.
Comments :
Satisfactory Standards :
Check MCB indications for proper voltage.
Unsatisfactory 0 3
Element :
Conditions :
Check for bus fault indications.
CUE: If examinee requests Electrician or A 0 to locally check bus; cue that no relays are tripped and no indications of damage are seen.
Comments :
Satisfactory 0 Unsatisfactory
~
Standards :
Check MCB alarm panels for fault indications, determine no faults other than loss of offsite power are indicated.
(Annunciators L-5 and L-13 are main indications that no fault occurred.)
0 4
Element :
Conditions :
Ensure all bus tie breakers are open.
Comments :
Satisfactory Standards :
Check MCB for open indications :
- Bus 13-Bus 14 tie
- Bus 16-Bus 14 tie
- Bus 17-Bus 18 tie Unsatisfactory 0 5
Element :
Conditions :
Place Bus 14 normal supply breaker to after trip on MCB.
~~
Standards :
Same as element.
Page:
5 Job Performance Measure Exam 28-Oct-2004 Comments :
Satisfactory Unsatisfactory 0 6
Element :
Conditions :
Press Overcurrent Reset for Bus
- 14.
Comments :
Satisfactory 0 Standards :
Locate pushbutton (inside MCB).
Depress pushbutton.
Unsatisfactory 0 7
Element :
Conditions :
Check auto voltage control properly set.
Comments :
Satisfactory 0 Standards :
Verify Auto control selected on MCB selector switch, Verify 480 volts output.
Unsatisfactory 0
- 8 Element:
CRITICAL Conditions :
Place D/G "A" synchroscope I
switch to Bus 14 position.
Comments :
Standards :
Same as element.
Satisfactory Unsatisfactory 0
- 9 Element:
CRITICAL Conditions :
Standards :
Manually close D/G "A" feed to Bus 14.
Places DIG A feed to Bus 14 to close. Verifies breaker CUE: No further action.
closes.
Comments :
Satisfactory Unsatisfactory
Page:
6 Job Performance Measure Exam 2s-Oct-2004 JPM Questions Question Answer References Reference Type Reference ID Description Ref Flag
Page:
1 Job Performance Measure Exam 16-Sep-2004 JPM NO JR026.001 Secure Containment Spray Revision#:
6 Review Date:
9/15/2004 Location:
Simulator Estimated Time (minutes):
Candidate:
5.00
- Evaluator:
Actual Time:
Trainee Performance:
Satisfactory Unsatisfactory Trainee:
Instructor:
Submitted By Date Reviewed By Date
I 16-Sep-2004 Job Performance Measure Exam Page:
l l NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUlREMENTS PRIOR TO THE BEGINNING Initial Conditions:
The plant was operating at 100% power and experienced a large break LOCA followed by a reactor trip and SI. All necessary equipment functioned properly.
InitiatinP Cues :
The plant experienced a large break LOCA. All steps of E-0 and E-1 have been completed up to step 13. The Shift Supervisor directs you to secure Containment Spray per Step 13 of E-1.
I I
31 Page:
I 16-sep-2004 Job Performance Measure Exam
==
Description:==
Secure Containment Spray (JR026.00 1)
JPM Tasks Task ID: 026-008-05-01A Task Standards Secure Containment Spray Pumps and System.
Tools :
Terminating: Cues References :
ID -
u PRE E-1 Descrbtion Review Date Ref Flag LOSS OF REACTOR OR SECONDARY COOLANT 0
Safetv Considerations Consequences of Inadequate Performance:
General Comments :
Any full power IC. MALF RCS02A, B, C or D (10 000). Complete E-0 and E-1 up to Step 13. Ensure spray energized and Cnmt pressure SIS37 and set NAOH Tank level to 50%. (IC-52) 4 psig and NAOH Tank level 55%. Use Indicator Override
4 1 Page:
Job Performance Measure Exam 16-Sep-2004 Performance Checklist 1
Element :
Conditions :
Obtain a controlled copy of E-1.
Standards :
Same as element.
Comments :
Satisfactory 0 Unsatisfactory 0 2
Element :
Conditions :
Verify Containment Spray Pumps running.
Comments :
Satisfactory n Standards :
Same as element.
Unsatisfactory 3
Element :
Conditions :
Veri@ Containment pressure less than 4 psig and NAOH Tank level less than 55%.
u Comments :
Satisfactory 0 Standards :
MCB meters Unsatisfactory 0
- 4 Element:
CRITICAL Conditions :
Reset Containment Spray.
Standards :
Depress Containment Spray Reset pushbutton.
Comments :
Satisfactory Unsatisfactory 5
Element :
Conditions :
Verify NaOH flow - no flow.
Comments :
Satisfactory n Standards :
Check FI-930 no flow.
Unsatisfactory 0 L.
Element:
CRITICAL Conditions :
Stop CS Pumps. Place switches in auto.
Standards :
Same as element.
16-Sep-2004 Job Perfurmance Measure Exam Page:
5 Comments :
Satisfactory Unsatisfactory 0
- 7 Element:
CRITICAL Close spray isolation valves; MOV-860A, MOV-860B, MOV-860C, MOV-860D.
Comments :
Conditions :
CUE: No further action.
Standards :
MCB switches to close.
Satisfactory 0 Unsatisfactory 0
Page:
1 Job Performance Measure Exam 22-Sep-2004 JPM NO JC006.010 Perform SFP-RWST Attachment Revision#:
4 Review Date:
9/16/2004 Location:
Aux Blde Estimated Time (minutes):
15.00 Candidate:
Evaluator:
Actual Time:
Trainee Performance:
Satisfactory Unsatisfactory Trainee:
Instructor:
Submitted By Date Reviewed By Date
1 I
1 22-Sep-2004 Job Performance Measure Exam Page:
2 I NOTE THE EVALUATOR WILL EXPLAIN THE JF'M INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES, ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING Initial Conditions:
The plant experienced a LOCA outside of Containment. The LOCA cannot be isolated. Control Room transitioned from ECA-1.2, LOCA OUTSIDE CONTAINMENT, to ECA-1.l, LOSS OF EMERGENCY COOLANT RECIRCULATION.
Initiating Cues :
The CRF directs you to transfer water from SFP to the RWST using Attachment ATT-18.0, m k - a n s f e e r at the Maximum rate (Bypass SFP DIs)
Option 4: Transfer at Normal Rate (Through the SFP DI)
22-Sep-2004 Job Performance Measure Exam Page:
3
==
Description:==
Perform SFP-RWST Attachment (JC006.010)
JPM Tasks Task ID: 005-017-05-04A Task Standards Tools :
Key Safety Glasses Hard Hat Hearing Protection Terminating Cues Trainee Says Task is Completed Task Completion References :
ID PRATT A n - 1 8.0 Descrbtion ATTACHMENT SFP - RWST Review Date Ref Flag Safety Considerations Radiological Hazard Consequences of Inadequate Performance:
Insufficient water for injection during a Loss of Emergency Coolant Recirculation.
General Comments :
Estimated Time is 15 minutes for Options 1 and 4. Option 2 adds 5 minutes. Option 3 adds 10 minutes.
1 2
3 Page:
4 Job Performance Measure Exam 22-Sep-2004 Performance Checklist Element :
Note Conditions :
Standards :
NOTE: Supply student copy of the attachment.
CUE: Simulate you have a locked valve key.
Comments :
Satisfactory 0
Unsatisfactory 0 Element :
Review attachment.
Conditions :
Standards :
Same as element.
Comments :
Satisfactory 0 Unsatisfactory
~
Element :
Conditions :
Standards :
veri^ SPF Cooling Lineup.
CUE: A SFP Running Check SFP Pumps Option 1 : Lower suction in service Check SFP Suction Valves suction in service Comments :
Satisfactory Unsatisfactory 0 4
Element :
Conditions :
Standards :
Obtain copy of S-9A.
Review procedure.
Comments :
CUE: Given Examinee Copy Same as Element Satisfactory Unsatisfactory 5
Element :
Check SFP Level Comments :
Conditions :
Standards :
Visual Inspection of Level Same as Element Satisfactory 0 Unsatisfactory 0
6 7
8 9
- 10
- 11 Page:
5 Job Performance Measure Exam 22-Sep-2004 Element :
Conditions :
Standards :
Contact Control about TR 3.7.7 and 3.9.4 Comments :
CUE: Requirements are satisfied sign off Initial Condition Same as Element Satisfactory Unsatisfactory 0 Element :
Conditions :
Standards :
Determine Section 5.6 to be performed.
Comments :
Same as Element Satisfactory Unsatisfactory Element :
Conditions :
Standards :
Verify Pool Temperature Check Pool Temperature < 1 15 deg F or call MCR to verify.
CUE: Pool Temp 90 deg F Same as Element Comments :
Satisfactory 0 Unsatisfactory 0
~
~~
~~~
~~~~
Element :
Conditions :
Standards :
Check level above weir gate bracket Comments :
CUE: Level above brackets Checks level Satisfactory n Unsatisfactory 0 Element :
CRITICAL Conditions :
Standards :
Open V-782 Locate valve Same as Element Simulator opening CUE: Valve no longer turns in that direction Comments :
Satisfactory 0 Unsatisfactory 0
~~
~
~~
Element :
CRITICAL Conditions :
Standards :
Close V-781 Locates valve Same as Element Simulates closing CUE: Valve no longer turns in that direction
6 1 Page:
Job Performance Measure Exam 22-Sep-2004 Comments :
Satisfactory 0 Unsatisfactory 12 Element:
Conditions :
Standards :
Observe note.
CUE:
Same as element.
OPTION #3 - Proceed to next step.
OPTION #4 - proceed to step 20.
OPTION #3 = Transfer at maximum rate.
OPTION #4 = Transfer through SFP DI.
Comments :
Satisfactory 0 Unsatisfactory 0
- 13 Element:
CRITICAL Conditions :
Standards :
Unlock and close V-804.
CUE: Valve is unlocked. Valve no longer turns in that direction.
CUE:(If student requests eSOMS location) eSOMS gives valve location at: AB INTER, SFP HEAT EXCH AREA, ELEV 4 Locate valve.
Simulate unlocking and closing.
Comments :
Satisfactory Unsatisfactory 0
- 14 Element:
CRITICAL Conditions :
Standards :
Open V-789.
CUE: Valve no longer turns in that direction.
Simulate opening valve.
Locate valve.
CUE:(If student requests eSOMS location) eSOMS gives valve location at: AB INTER, SFP FILTER ROOM AREA, ELEV 1 Comments :
Satisfactory 0 Unsatisfactory
1
- 15
- 16
- 17
- 18 Page:
Job Performance Measure Exam 22-Sep-2004 Element :
CRITICAL Conditions :
Standards :
Close V-790.
CUE: Valve no longer turns in that direction.
Simulate closing valve.
CUE:(If student requests eSOMS location) eSOMS gives valve location at: AB INTER, SFP FILTER ROOM AREA, ELEV 1 Locate valve.
Comments :
Satisfactory unsatisfactory
~~
~
~~
Element :
CRITICAL Conditions :
Standards :
Close V-796.
CUE: Valve no longer turns in that direction.
Simulate closing valve.
Locate valve.
CUE:(If student requests eSOMS location) eSOMS gives valve location at: AB INTER, SFP FILTER ROOM AREA, ELEV 1 Comments :
Satisfactory 0 Unsatisfactory Element :
CRITICAL Conditions :
Standards :
Open V-797.
CUE: Valve no longer turns in that direction.
Simulate opening valve.
CUE:(If student requests eSOMS location) eSOMS gives valve location at: AB INTER, SFP FILTER ROOM AREA, ELEV 5 Locate valve.
Comments :
Satisfactory Unsatisfactory 0 Element :
CRITICAL Conditions :
Standards :
Close V-798A.
CUE: Valve no longer turns in that direction.
Simulate closing valve.
Locate valve.
CUE:(If student requests eSOMS location) eSOMS gives valve location at: AB INTER, SFP FILTER ROOM AREA, ELEV 5
- 19
- 20
- 2 1 8 I Page:
Job Performance Measure Exam 22-Sep-2004 Comments :
Satisfactory Unsatisfactory 0 Element :
CRITICAL Conditions :
Standards :
Close V-802.
CUE: Valve no longer turns in that direction.
Simulate closing valve.
CUE:(If student requests eSOMS location) eSOMS gives valve location at: AB INTER, SFP FILTER ROOM AREA, ELEV 5 Locate valve.
Comments :
Satisfactory 0 Unsatisfactory 0
~
~
~~
Element :
CRITICAL Conditions :
Observe caution.
Standards :
Same as element.
Comments :
Satisfactory 0 Unsatisfactory Element :
CRITICAL Conditions :
Slowly open V-803 and close V-804.
reads 60 gpm.
CUE OPTION #4: Flow meter CUE OPTION #3: Valves no longer turn in that direction.
CUE BOTH OPTIONS: Secure transferring water to RWST.
CUE:(If student requests eSOMS location) eSOMS gives valve location at: AB INTER, SFP HEAT EXCH AREA ELEV 4 for both valves Comments :
Satisfactory Unsatisfactory Standards :
Locates valves.
Simulate unlocking and operating valves.
IF performing OPTION #4, indicate that meter is monitored (for 60 gpm flow)=
0
9 1 Page:
Job Performance Measure Exam 22-Sep-2004
- 22 Element:
CRITICAL Close V-803.
Conditions :
Standards :
CUE: Valve no longer turns in that direction.
Simulate closing valve and CUE:(If student requests eSOMS location) eSOMS gives valve location at: AB INTER, SFP HEAT EXCH AREA, ELEV 4 Locate valve.
locking.
Cue: No further actions Comments :
Satisfactory Unsatisfactory 0
I 1
l I Page:
Job Performance Measure Exam 15-Oct-2004 I
JPM NO JR015.006 Install Spare Source Range Drawer (ER-FIRE. 1)
Revision#:
5 Review Date:
10/12/200~
Location:
In Plant Estimated Time (minutes):
45.00 Candidate:
Evaluator:
Actual Time:
Trainee Performance:
Satisfactory Unsatisfactory Trainee:
Instructor:
Submitted By Date I
Reviewed By Date
I 1
2 1 Page:
Job Performance Measure Exam 15-Ocf-2004 NOTE THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.
Initial Conditions:
The plant was operating at 100% power for several months. A fire in the main Control Room forced its evacuation. Approximately 30 minutes later, the Shift Supervisor directs you to install the spare Source Range drawer.
Initiating Cues :
A fire in the Control Room forced its evacuation about 1/2 hour ago. The Shift Supervisor directs you to install the spare Source Range drawer per ER-FIRE. 1, Attachment 1 1. Do not manipulate, connect or disconnect any switches or wires.
r I
3 1 Page:
Job Performance Measure Exam 15-Oct-2004
==
Description:==
Install Spare Source Range Drawer (ER-FIRE. 1) (JRO 15.006)
JPM Tasks Task ID: 015-017-05-01A Task Standards :
In accordance with the procedure Tools :
Procedure Hard Hat Hearing Protection Flash Jacket Appendix R Tool Pouch Safety Glasses Rubber Gloves TerminatinP Cues Trainee Says Task is Completed Task Completion References :
ID -
P E R ER-FIRE. I Safety Considerations Electrical Shock Hazard Description Review Date Ref Flag ALTERNATE SHUTDOWN FOR CONTROL COMPLEX FIRE Consequences of Inadequate Performance:
Inability to determine reactor core shutdown
I I
4 1 Page:
I 15-0ct-2004 Job Performance Measure Exam General Comments :
Inform ss.
Appendix "R" Locker Key.
Procedure ER-FIRE. 1.
DISCUSS WITH I&C AHEAD OF TIME FOR EQIPMENT CHECK AFTER PERFORMANCE.
I 3
5 1 Page:
Job Performance Measure Exam 15-Oct-2004 Performance Checklist 1
Element :
Handout Conditions :
Standards :
NOTE: Give students an Appendix "R" package. This will include the procedures and Appendix "R" key.
CUE: Tell student to simulate the radio.
Comments :
Satisfactory Unsatisfactory 2
Element :
Conditions :
Locate appropriate section of procedure.
Comments :
Satisfactory 0 Standards : 1.
Unsatisfactory 3
Element :
Conditions :
Locate appropriate locker.
Standards :
Same as element.
Comments :
Satisfactory 0
Unsatisfactory
- 4 Element:
CRITICAL Conditions :
Obtain appropriate equipment from locker for SR storage.
NOTE: For Requal exam it is not necessary to remove cables, but examinee must explain what he would do. A prompt of this order would be appropriate at this point.
NOTE: Cable tie-offs not critical.
Comments :
Satisfactory Unsatisfactory Standards :
-Rubber gloves
-Multi-headed extension
-Appendix "R" Source range cables
-Electrical safety jacket
-Cable tie-offs 0
~
- 5 Element:
CRITICAL Conditions :
Standards :
Run cables per instructions in 1.
NOTE: Requal examinees should not run the cables, but they must explain how it is done.
Simulate unless for Appendix "R" test or Initial License Class.
Page:
6 Job Performance Measure Exam 15-0ct-200#
Comments :
Satisfactory Unsatisfactory 6
Element :
Conditions :
Place Source Range Drawer near IBELIP Panel.
Comments :
Standards :
Within reach of extension cord.
Satisfactory Unsatisfactory
- 7 Element:
CRITICAL Conditions :
Connect unattached ends of the three connectors to Sourcg Range Drawer.
Standards :
Simulate connections:
A toA B to B c to c Comments :
Satisfactory Unsatisfactory 8
Element :
Conditions :
Don rubber gloves and safety jacket.
Comments :
Standards :
Same as element.
Satisfactory 0
Unsatisfactory 9
Element :
Conditions :
In catwalk area disconnect cables and connect the ends of the three Appendix R Source Range cables to Preamp connectors.
Comments :
Standards :
Simulate connections:
AtoA B to B c to c Satisfactory Unsatisfactory 0
- 10 Element:
CRITICAL Conditions :
Perform or verify switch lineup.
Standards :
Done IAW step by step on 1.
Comments :
Satisfactory Unsatisfactory
Page:
7 Job Performance Measure Exam 15-Oct-2004 11 Element:
Conditions :
Standards :
Notify SS that Spare Source Range is ready.
Comments :
CUE: > 30 minutes have elapsed since reactor shutdown.
Same as element.
Satisfactory Unsatisfactory
- I2 Element:
CRITICAL Conditions :
Plug 2 Source Range Drawer power sources into the multihead extension cords.
Standards :
Simulate plugging into IBELIP.
Comments :
Satisfactory Unsatisfactory
- 13 Element:
CRITICAL Conditions :
Turn power switches on.
Standards :
Simulate turning on power.
Comments :
Satisfactory Unsatisfactory
~
~~
- 14 Element:
CRITICAL Conditions :
Set the High Voltage to 1500V on 556 HVPS.
Standards :
Simulate adjusting voltage as directed by procedure.
Comments :
Satisfactory Unsatisfactory 0 15 Element :
Conditions :
Notify Shift Supervisor.
CUE: No further action.
Comments :
Standards :
Simulate using radio to notify SS of task completion.
Satisfactory Unsatisfactory 0