ML043280258

From kanterella
Jump to navigation Jump to search
Final - SRO Written (Folder 3)
ML043280258
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/03/2004
From: Maciuska F
Constellation Energy Group
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
Download: ML043280258 (75)


Text

Attachment 1 Page 1 of 2 EXAM QUESTION HISTORY I Question # RO SRO 1 TIER 1 Group 1 B000.1057 KA OO0017G2.1.32 Importance 3.8 X New Modified (Attach original and Modified Questions)

II Original Bank Originating Bank

  1. I 10CFR55 Content 55.41 55.435 Learning Objective RES02C 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriate EXPECTED ACTIONS or RESPONSE NOT OBTAINED instructions to implement.(ES-0.2)

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference Figure 3.0. ES-0.2 Level of Difficulty (from,attachment3)

References required on Exam (Attach copy to this attachment)

Fig-3.0. Natural Circulation C/D with Shroud Fans.

AnswerAnalysis: D is correct since the AT between the Hot lees and the P n r exceeds its 200°F limit. No restrictions are imDosed on Aux. SDrav because the AT is < 320°F.

Distractor Analysis: A is incorrect since the RCS pressure needs to be reduced to < 1400 per e

Figure 3.0 and no restrictions are placed on Aux. Spray (used THto calculate RCS pressure).

B is incorrect since no restrictions are placed on Aux. Spray in these conditions.

C is incorrect due to the wong RCS pressure.

Question 1 B000.1057 (1 point(s))

The plant trip due to loss of offsite power. The RCS is currently being cooled down per ES-0.2, Natural Circulation Cooldown. The following conditions exist:

RCS Pressure - 1850 psig RCS Hot Leg Temps - A - 410°F B - 405°F RCS Cold Leg Temps - A - 390°F B - 385°F Pnr Water Temp - 625°F Przr Steam Temp - 626°F Letdown In Service Charging from the Regen Hx Temp 385°F SI Blocked Both Control Rod Shroud Fans are running Which of the following states the required actions:

a. Depressurize the RCS to less than 1540 psig using only the PORVs due to high AT between the Charging L i e and Przr Steam space.
b. Depressurize the RCS to less than 1400 psig using only the PORVs due to high AT between the Charging Line and P m Steam space.
c. Depressurize the RCS to less than 1540 p i g using auxiliary spray to cooldown the pressurizer.
d. Depressurize the RCS to less than 1400 psig using auxiliary spray to cooldown the pressurizer.

Answer 1

d. Depressurize the RCS to less than 1400 psig using auxiliary spray to cooldown the pressurizer.

1

EXAM QUESTION HISTORY Question # RO SRO 2 TIER 1 Group 1 B000.1058 KA 000022AA2.04 Importance 3.8 Source of Question (Note: Attach question and any subsequent modifications to this attachment)

X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

Learning Objective: RAP3 1C 1.03 State the reasonhasis for the CAUTIONS, NOTES and/or Major Action Categories in AP-CVCS .3, Loss of All Charging Flow.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference AP-CVCS.3 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: B is correct since the guidance of AP-CVCS.3 reauires this action.

Distractor Analysis: A and C are incorrect since these actions will result in a loss of Przr

.-.- . Level and Pressure Control. D is incorect since this would not be effective in maintaining RCS Dressure control.

Question 2 B000.1058 (1 point(s))

While at 100% power a charging line leak resulted in loss of all charging flow. It will be approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before the line can be repaired and charging restored. Which of the following describes the required operator actions under these conditions. The operators have already isolated Letdown.

a. Shutdown the Rx per the Normal Operating Procedures (1O%/hour), once shutdown, depressurize the RCS to -1400 psig and establish SI flow to control inventory. RCS inventory will remain in the pressurizer due to the low outflow rate.
b. Perform a Rapid Rx Shutdown using Abnormal Procedures (5%/min), once shutdown, depressurizethe RCS to 1400 psig and establish SI flow to control inventory. RCS inventory will be maintained due to the short time taken to shutdown.
c. No action is required since the pressurizer outflow rate (seal leako@ is so low that more than the required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for the charging line repair are available prior to PRZR Level decreasing to < 13%.
d. Monitor P U R Level, when P E R Level decreases to less than 5%, Trip the Reactor and go to E-0. SI will automatically start as pressure decreases and SI flow will maintain RCS Inventory.

Answer 2

b. Perform a Rapid Rx Shutdown using Abnormal Procedures (5%/min) once shutdown depressurize the RCS to 1400 psig and establish SI flow to control inventory. RCS inventory will be maintained due to the short time taken to shutdown.

2

EXAM QUESTION HISTORY

- Question # RO SRO 3 TIER 1 Group 1 BO08.OO05 KA 000026AA2.04 Importance 2.9 Source of Question (Note: Attach question and any subsequent modifications to this New Modified (Attach original and Modified Questions)

Original Bank #

X Bank Originating Bank Ginna # B008.0005 10CFR55 Content 55.41 55.43 5 Learning Objective: RAP02C 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriate EXPECTED ACTIONS or RESPONSE NOT OBTAINED instructions to implement. (AP-CCW.2)

~

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference Ap-CCW.2 Level of Difficulty (fromattachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: D is correct Der AP-CCW .2 exceeding 200°F bearing: oil temperature requires trbpinn of the reactor then the affected RCP and then going: to E-O.

Distractor Analysis: A is incorrect since high bearing temDerature requires an immediate RCP trip. B is incorrect since only the affected RCP is triooed. C is incorrect since the Rx must be trimed prior to the affected RCP and there are no actions for isolating the RCS in AP-ccw.2.

Question 3 BOOS.0005 (1 point(s))

During an ordered 1% per min power reduction, the following annunciators and conditions exist:

- AA-18RCP Vibration Alert

- A-32 RCP B oil level

  • 1.25

- PPCS display "GD-RCP's" indicates "B"RCP upper bearing at 233 degrees F Which of the following actions are required?

a. Check CCW pump, CCW surge tank and surge tank vent.
b. Trip the Rx,trip both RCP's and go to E-0.
c. Trip both RCP's, veri9 RCS isolated and go to E-0.
d. Trip the Rx,trip "B" RCP and go to E-0.

Answer 3

d. Trip the Rx,trip " B RCP and go to E-0.

3

EXAM QUESTION HISTORY Question # RO SRO 4 TIER 1 Group 1 C000.0266 KA 00002762.1.32 Importance 3.8 New Modified (Attach original and Modified Questions)

Original Bank #

X Bank Originating Bank Ginna # C000.0266 10CFR55 Content 55.41 55.43 2 Learning Objective: RES02C 1.02 Given the notes, cautions, and major action categories in ES-0.2, Natural Circulation Cooldown, explain the basis for the same.

Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference ES-O .2. ITS 3.4.9 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: B is correct Der TS 3.4.9 Basis for PRZR Heaters.

Distractor Analysis: A is incorrect since the Przr will remain saturated. C - Minimum heaters are established to urevent a steam bubble from forming. not to collame one that exists.

D - Heaters are restored to maintain RCS uressure above the saturation pressure. SI is normally blocked during a Natural Circ. Cooldown.

Question 4 C000.0266 (1 point(s))

d ER-PUR. 1, Restoration of P U R HTRS during blackout, provides for establishing a minimum amount of P E R heaters.

Which one of the following statements describes the basis or reason for establishing heaters following a blackout?

a. Allows for keeping the P E R saturated for more uniform pressure control.
b. Allows subcooled natural circulation to be maintained.
c. Allows for collapse of steam bubble in the vessel head.

I

d. Allows for maintaining RCS pressure above SI setpoint.

Answer 4

b. Allows subcooled natural circulation to be maintained.

TC #96-107 4

EXAM QUESTION HISTORY d Question ## RO SRO 5 TIER 1 Group 1 BOOO. 1059 KA 000055EA2.06 Importance 4.1 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

Learning Objective: RERl8C 4.0 Given a set of plant conditions (and a procedure figure, if needed) evaluate the appropriate parameters and determine the correct course of action.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference RGEO7 480V Distribution Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: A is correct since the correct Drocedure for restoration is ER-ELEC. 1 and SI must be reset to close the normal feed breaker with the buses deenerrrized.

Distractor Analysis: B is incorrect since ECA-0.0 is the incorrect restoration procedure

.d (doesnt give the steD). C is incorrect since SI must be reset. D is incorrect since the wrong procedure is referenced and SI must be reset.

Question 5 B000.1059 (1 point(s))

-1 Following a loss of all AC power the operators are performing ECA-0.0, Loss of all AC, when Energy Operations notifies the Control Room that Circuit 75 1 has been restored. The following conditions exist:

0 SI Actuated and not reset 0 No Faults on any 4160V or 480V Bus 0 All Buses are deenergized Which of the following states the required actions the operators will take to restore power to the 480V Safeguards Buses.

a. Restore power to the 4160V Buses 12N12B per ER-ELEC. 1, Restoration of Offsite Power, then Reset SI to allow closing of the 480V Safeguard Bus Normal Feed Breakers.
b. Restore power to the 4160V Buses 12N12B per ECA-0.0, Loss of All AC Power, then Reset SI to allow closing of the 480V Safeguard Bus Normal Feed Breakers.
c. Restore power to 4160V Buses 12N12B per ER-ELEC.1, Restoration of Offsite Power. The Safeguard Bus Normal Feed Breakers can be closed without resetting SI.
d. Restore power to 4160V Buses 12N12B per ECA-0.0, Loss of all AC Power. The Safeguard Bus Normal Feed Breakers can be closed without resetting SI.

Answer 5

a. Restore power to the 4160V Buses 12N12B per ER-ELEC.1, Restoration of Offsite Power, then Reset SI to allow closing of the 480V Safeguard Bus Normal Feed Breakers.

5

EXAM QUESTION HISTORY

\d Question # RO SRO 6 TIER 1 Group 1 B000.1060 KA 00005762.4.30 Importance 3.6 Source of Question (Note: Attach question and any subsequent modifications to this attachment)

L New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

10CFR55 Content 55.41 55.43 2 Learning Objective: R0901C 5.02 Given a set of plant conditions and a copy of Tech Specs and Tech Spec referenced material

@e. COLR) be able to apply the Tech Specs. To include: LCO, applicability, applying action items, surveillances and the use of basis to aid in application.

RAD04C 1.05 State the time limits for notifying the NRC, State, and County.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference TS 3.8.9/0-9.3 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

TS 3.8.9. 0-9.3 AnswerAnalysis: C Der TS 3.8.9B two hours to restore then initiate shutdown to Mode 3/5 per 0-9.3 initiation of plant shutdown is 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> reuortable IOCFR50.721bM21(i).

Distractor Analysis: A is incorrect since it does not cause a UE or any other one hour reportable. B is incorrect since two hours are available for restoration. D is incorrect since onlv six hours are available.

Question 6 B000.1060 (1 point(s))

-- During 100% power operation, the 1B AC Instrument Bus develops a fault and is deenergized.

Assuming that the Bus is not repaired, which of the following states the latest time the NRC can be notified and still meet the notification requirements.

a. One hour after the event.
b. Four hours after the event.
c. Six hours after the event.
d. Twenty-four hours after the event.

Answer 6

c. Six hours after the event.

6

EXAM QUESTION HISTORY Question# RO SRO 7 TIER 1 Group 1 B035.0004 KA WE/05EA2.1 Importance 4.4 Source of Question (Note: Attach question and any subsequent modifications to this attachment)

New Modified (Attach original and Modified Questions)

I X II Original Bank Bank Originating Bank Ginna

  1. B035.0004 10CFR55 Content 55.41 55.43 5 Learning Objective: RFRHlC 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriate EXPECTED ACTIONS or RESPONSE NOT OBTAINED instructions to implement.(FR-H. 1.)

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference CSFST F-0.3 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: C per the CSFST F-0.3 a Red Path exists on Heat Sink and the next procedure which should be Performed after E-O is FR-H. 1.

Distractor Analysis: A is incorrect since ES procedures do not have prioritv over Red Path FRs. B is incorrect since FR-H. 1 has Drioritv. D is incorrect since FR-H. 1 is a hieher prioritv than FR-1.2.

Question 7 B035.0004 (1 point(s))

.d' Immediately following the completion of the immediate actions of E-0, Reactor Trip or Safety Injection, the following conditions exist:

- SI Not Actuated

- RCS pressure - 2180 psig

- Core Exit TCs - 542 degrees F

- S/G pressures - (A,B) - 1000psig, 900 psig

- S/G N.R. levels (A,B) - 0%, 3%

- Containment pressure - 0.3 psig

- Pressurizer level - 3%

- Total feed flow to S/G A - 50 gpm

- Total feed flow to S/G B - 100 gpm Assuming these conditions exist and cannot be changed as you progress through E-0, Reactor Trip or Safety Injection, which procedure provides the required subsequent action?

a. ES-0.1, Reactor Trip Response
b. E-2, Faulted Steam Generator Isolation

~

c. FR-H. 1, Response to Loss of Secondary Heat Sink
d. FR-1.2, Response to Low Pressurizer level Answer 7
c. FR-H. 1, Response to Loss of Secondary Heat Sink 7

EXAM QUESTION HISTORY

-1 Question # RO SRO 8 TIER 1 Group 2 BOOO. 1061 KA 000069AA2.02 Importance 4.4 Source of Question (Note: Attach question and an! subsequent modifications to this attachment)

New X Modified (Attach original and Modified Questions)

OriginalBank INPO # IP #2 3/10/2003 Bank Originating Bank #

AnswerAnalysis: A is correct at least one door in each air lock must be closed.

Distractor Analysis: B - This system is not reauired to be operable for CNMT InteFritv.

d C - Containment Purge is allowed in service at CSD. D - One door needs to be closed for CNMT inteszrity .

Question 8 B000.106 1 (1 point(s))

.- The Reactor Coolant System is in a reduced inventory condition and preparations are being made to detention the RV Head for eventual removal. Additional plant status information is as follows:

0 RCS boron concentration is 2320 ppm.

0 The Penetration Pressurization System was removed from service 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ago 0 Both doors of the Equipment Hatch Airlock are open to facilitate repairs of the airlock seals 0 One door of the Personnel Airlock is closed 0 Containment leakage was previously verified to be less than 0.2% of the containment free volume per day 0 Containment purge is in service Given the above plant conditions, which ONE (1) of the following describes a requirement that must be met prior to proceeding with the RV Head detentioning?

a. Repair and close at least ONE door in the Equipment Hatch.
b. Restore the Containment Penetration Pressurization System to operable status.
c. Verify the automatic containment purge is removed from service.
d. Close the other door of the Personnel Airlock.

Answer 8

a. Repair and close at least ONE door in the Equipment Hatch.

8

EXAM QUESTION HISTORY

,-.. Question ## RO SRO 9 TTER 1 Group 2 B000.1062 KA 0000076A2.02 Importance 2.7 Source of Question (Note: Attach question and any subsequent modifications to this attachment)

New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank INPO # Bvron 6/29/2000 10CFFt55 Content 55.41 55.43 4 Learning Objective: W 1 7 C 1.03 State the reasonhasis for the CAUTIONS, NOTES and/or Major Action Categories in AP-RCS .3, High Reactor Coolant Activity.

Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference AP-RCS.3 High Activitv Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: B is correct since the Drocedure states to swaD DI Bed if the DF is < 10.

Distractor Analysis: C and D are wrong: since they are both Entrv Conditions to AP-RCS.3.

A is wrong since chloride levels are not addressed and Der TRM 3.4.2 this level reauires a plant shutdown.

Question 9 B000.1062 (1 point(s))

During a High Reactor Coolant Activity event, which of the following is the criteria used to determine if the standby mixed bed demineralizer is required to be placed in service?

a. Chloride levels greater than 0.15.
b. Decontamination factor less than 10.
c. Dose equivalent 1-131 greater than 1 microcUrie/gram.
d. Gross radioactivity greater than 1OO/E BAR.

Answer 9

b. Decontamination factor less than 10.

9

EXAM QUESTION HISTORY d Question #I RO SRO 10 TIER 1 Group 2 B000.1063 KA W/E06 2.4.4 Importance 4.3 X New Modified (Attach original and Modified Questions)

Original Bank #

I Bank Originating Bank #

10CFR55 Content 55.41.10 55.43.5 Learning Objective: RFROOC 2.01 Given a set of plant conditions and a copy of the CSFST's, apply the CSFST.

Cognitive Level Memory or Fundamental Knowledge

- Comprehension or Analysis X Technical Reference FR-0.2 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Answer Analysis: A is incorrect even though a faulted S/G is indicated - FR-C.l has a higher priori@.

Distractor Analysis: B is incorrect even though a Loss of Heat Sink is indicated. FR-C.l has i a higher priority. C is incorrect - no criteria for entrv into FR-S.1 onlv FR-S.2which is an Orange Path. again FR-C.1 has priority. D is correct - indications of Inadeauate Core Coolinq Red Path - the hiehest Drioriq Drocedure.

Question 10 B000.1063 (1 point(s))

4 The Reactor has tripped due to a loss of offsite power. SI has actuated. The crew is performing actions in E-0, "Reactor Trip or Safety Injection". Given the following conditions:

RCS pressure 1700 psig and trending up SG pressure "A"= 1015 psig stable "B" = 700 psig and trending down CET's 700°F and trending up SG Narrow Range level off scale Low AFW flow approximately75 gpm to each SG PRZR level 15% and trending down CNMT pressure 5 psig and trending up Power is 2% in the PR and IR S U R is slightly negative RVLIS level 45%

Which ONE of the following describes the procedure transition upon exit fiom E-O?

a. E-2, Faulted Steam Generator Isolation
b. FR-H. 1, Response to Loss of Secondary Heat Sink
c. FR-S. 1, Response to Reactor Restart/ATWS
d. FR-C. 1, Response to Inadequate Core Cooling Answer 10
d. FR-C. 1,Response to Inadequate Core Cooiing IO

EXAM QUESTION HISTORY Question # 11 RO SRO 11 TIER I Group 2 COO0 .OM3 KA WiE08 2.1.32 Importance 3.8 Source of Question (Note: Attach question and any subsequent modifications to this ttachment)

New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank Ginna # C000.0043 10CFR55 Content $5.41.10 55.43.1 Learning Objective: RFRPlC 1.02 Given the notes and/or cautions in FR-P.1, Response to Imminent Pressurized Thermal Shock Condition, explain the notes and/or cautions in FR-P.1.

Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference FR-P.1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

None AnswerAnalysis: A is incorrect - PRZR increase due to SI accumulator in-iection basis not correct.

Distractor Analysis: B is incorrect - N, iniection durinrJ depressurizationbasis not correct.

-2 C is correct. D is incorrect - rate of accumulator iniection during demessurizationmore a concern for added thermal stress. not thermal shrink.

Question 11 C000.0043 (1 P O W ) )

- FR-P. 1,Response to Pressurized Thermal Shock, Step 17, has a caution which states, "The RCS should not be depressurized to less than SI accumulator pressure until the SI accumulator is isolated." Which one of the following is the correct basis for this caution?

a. It may cause water solid PRZR which will result in a loss of PRZR pressure control.
b. It will allow nitrogen into the RCS which may cause gas binding in the SG U-tubes.
c. It will delay depressurization since accumulator inflow to RCS will tend to stabilize RCS pressure.
d. It will cause cold water addition to RCS which will result in rapid RCS depressurization and loss of subcooling fiom thermal shrink.

Answer 11 c, It will delay depressurization since accumulator inflow to RCS will tend to stabilize RCS pressure.

TC 96-139 TC 96-140 TC 95-139 11

EXAM QUESTION HISTORY

-' Question # 12 RO SRO 12 TIER 1 Group 2 B000.1064 KA WlE09EA2.2 Importance 3.8 New X Modified (Attach original and Modified Questions)

Original Bank INPO # Diablo Canyon 1/1/2000 Bank Originating Bank #

10CFR55 Content 55.41 55.43.5 Learning Objective: RES03C 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriate EXPECTED ACTIONS or RESPONSE NOT OBTAINED instructions to implement.(ES-0.3)

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference ES-0.3 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: A is incorrect - although these are stem taken during the demessurization, thev do not apdv to rising PRZR level.

Distractor Analysis: B is correct - raising RCS Dressure bv 100 Dsig will heh collame the

--- bubble in the Reactor vessel. C is incorrect - continuing- the deDressurization will odY cause bubble in Reactor vessel head to mow larger. D is incorrect - RVLIS level indication limit is 93% and guidance only suepests raising Dressure with no firm midance on amount.

Question 12 B000.1064 (1 point(s))

__ Due to a reactor trip and subsequent loss of offsite power, procedure ES-0.3, "Natural Circulation Cooldown with Steam Void in Vessel" is in progress at step 8 Controlling PRZR Level. During depressurization, the P E R level rapidly increases to 93%.

What action(s) is required?

a. Stop RCS depressurization, then isolate SI accumulators if RCS pressure is less than 1500 psig.
b. Stop RCS depressurization, then energize pressurizer heaters to increase RCS pressure by 100 p i g .
c. Continue RCS depressurization until RCS pressure is within 50 psig of average S/G pressure.
d. Continue RCS depressurization until RVLIS level is less than 90%, then stop depressurization while continuing with cooldown.

Answer 12

b. Stop RCS depressurization, then energize pressurizer heaters to increase RCS pressure by 100 psig.

12

EXAM QUESTION HISTORY

.- Question # RO SRO 13 TIER 2 Group 1 B000.1065 KA 004G2.1.33 Importance 4.0 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank OriginatingBank #

10CFR55 Content 55.41 55.43 2 Learning Objective: R1601C 5.02 Given a set of plant conditions and a copy of TRM and TRM referenced material, be able to apply the TRM. To include: LCO,applicabiiity, applying action items and surveillances.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference TRM 3.1.1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

TRM 3.1.1 AnswerAnalysis: B is correct since TRM 3.1.1 rewires two chareinn Dumps to be oDerable to meet the snec. Actions A and B as stated are aDDliCable.

Distractor Analysis: A is incorrect since TRM 3.1.1 reauires action. C is incorrect since v these are the actions for Mode 3 and 4. and the r>lantis in Mode 1. D is incorrect since this is the action for both reauired flow Daths out of service.

Question 13 B000.1065 (1 point(s))

v During normal at power operation with the "B"Charging Pump OOS, the "A"Charging Pump trips and cannot be restarted. Which of the following states the required action, if any?

a. No actions required.
b. Restore a second charging pump to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, if not restored then, be in Mode 3 and verify adequate SDM in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. Restore a second charging pump to operable status within 7 days, if not restored then, be in Mode 5 in 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
d. Restore a second charging pump to operable status immediately, if not restored then, be in Mode 3 and verify adequate SDM in 6 horn.

Answer 13

b. Restore a second charging pump to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, if not restored then, be in Mode 3 and verify adequate SDM in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

13

EXAM QUESTION HISTORY

- Question# RO TIER 2 SRO 14 Group 1 B000.1066 KA 013A2.03 Importance 4.7 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank # d 10CFR55 Content 55.41 55.43 5 Learning Objective: RAP11C 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriate EXPECTED ACTIONS or RESPONSE NOT OBTAINED instructions to implement. (Ap-PRZR.l)

R2701C 3.06 Describe the cause -effect relationship between the ESFAS and the ECCS.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference Level of Difficulty (fromattachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: D is correct since the mrav valve will depressurize the RCS causing a Reactor T r b and SI. The SI pumD will deliver flow to the RCS causing a water solid condition at aDDroximately SI pump shut off head (1575 psi@.

L

Distractor Analysis: A is incorrect since the SI DumD will increase RCS Dresswe to the shut off head once the RCS is water solid. B is incorrect because the "B"RCP is the incorrect RCP to stot, per AP-PRZR.1. C is incorrect for the same reasons as A and B.

Question 14 B000.1066 (1 point(s))

/ During power operations AOV-43 1A Pressurizer Spray Valve opens to control pressure and becomes mechanically stuck at 50% open. Which one of the following describes the plant response with no operator actions and the operator action to mitigate this event.

a. RCS pressure will decrease to approximately 1050 psig. Rx trip and SI will occur.

Pressure will stabilize at approximately 1050 psig. The operators should trip the Rx and "A" RCP per AP-PRZR. 1, Abnormal PRZR Pressure.

b. RCS Pressure will decrease to below SI pump shutoff head. The Rx will Trip and SI will occur. RCS pressure will stabilize at approximately 1500 psig. The operators should Trip the Rx and "B" RCP per AP-PUR. 1, Abnormal PRZR Pressure.
c. RCS Pressure will decrease to approximately 1050 pig. Rx Trip and SI will occur.

Pressure will stabilize at approximately 1050 psig. The operators should Trip the Rx and "8"RCP per AP-PER. 1, Abnormal PRZR Pressure.

d. RCS Pressure will decrease to below SI pump shutoff head. The Rx will Trip and SI will occur. RCS Pressure will stabilize at approximately 1500 psig. The operators should trip the Rx and "A" RCP per AP-PRZR. 1, Abnormal PRZR Pressure.

Answer 14

d. RCS Pressure will decrease to below SI pump shutoff head. The Rx will Trip and SI will occur. RCS Pressure will stabilize at approximately 1500 psig. The operators should trip the Rx and "A" RCP per AP-PRZR. 1, Abnormal PRZR Pressure.

14

EXAM QuEsTION HISTORY Question # RO SRO 15 TIER 2 Group 1 B022.0004 KA 022A2.01 Importance 2.7 New X Modified (Attach original and Modified Questions)

(OriginalBank Ginna # B022.0004 I 1 Bank Originating Bank #

10CFR55 Content 55.41. 55.43.2 Learning Objective: R2201C 6.02 Given a set of plant conditions and a copy of Tech Specs and Tech Spec referenced material (i.e. COLR) be able to apply the Tech Specs. To include: LCO,applicability, applying action items, surveillances and the use of basis to aid in application.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference ITS 3.6.6 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: A is correct - "A" and "C" CRFC's both inoDerable makes both trains of post accident charcoal trains inoperable thus LCO 3.6.6.C amlies.

Distractor Analysis: B is incorrect - wrong: LCO action statement. C is incorrect - wrong LCO action statement. D is incorrect - containment mrav and CRFCs are not completelv interchangeable.

Question 15 B022.0004 (1 point(s))

\- The plant is operating at 100% power with the following equipment alignment:

B, C, and D Containment RecirculationFan Coolers (CRFCs) are in service. All other equipment is available and aligned for normal operation. The "C" CRFC develops high vibration, is declared "inoperable, and is secured after "A"CRFC is started. Five minutes after starting "A" CWC, it trips on overcurrent. A local reset is attempted. The "A" CRFC will not start.

What are the plant operational restrictions due to these events? (TSAS: Tech Spec Action Statement)

a. The plant is in a 72-hour TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />.
b. The plant is in a 7-day TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
c. The plant is in a 1-hour TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
d. The plant is not in a TSAS for required shutdown since both trainsof containment spray operable.

Answer 15

a. The plant is in a 72-hour TSAS, if not met must be in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />.

15

EXAM QUESTION HISTORY

\

  • Question ## RO SRO 16 TIER 2 Group 1

~3a0.0034 KA 064G2.1.33 Importance 4.0 New Modified (Attach original and Modified Questions)

Original Bank #

X Bank Originating Bank Ginna # B300.0034 10CFR55 Content 55.41 55.43 2 Learning Objective: R0801C 10.02 Given a set of plant conditions and a copy of Tech Specs and Tech Specs referenced material Le. (COLR) be able to apply the Tech Specs. To include: LCO, applicability, applying actions, surveillances and the use of basis to aid in application.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference PT-12.1/TS 3.8.1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

PT-12.1 TS 3.8.1 AnswerAnalysis: B is correct - PT-12.1 reauires the D/Gbe declared inoDerable due to low lube oil pressure < 68 mie. TS 3.8.1 allows 7 daw to repair.

Distractor Analysis: A is wrong: since FT-12.1 reauires

- the D/G be declared inoperable due

-- to low lube oil pressure. C is wrong- since 7 days. not 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. are allowed for restoring the D/G.D is wrong: since PT-12.1 ~ u t thes lube oil Dressure

- in the Action Required range. not the Alert range.

Question 16 B300.0034 (1 point(s))

J At 97% power during PT-12.1 "Emergency Diesel Generator 1A"test, with all equipment operable, the following test conditions were noted:

Load 2005 KW Power Factor .95 Lagging Fuel Oil Press 38 psig Lube Oil Press 67 psig Jacket Water Press 34 psig Air Manifold 22 psig Based on the given information, Which one of the following describes the required actions, if any, assuming the "B" D/G and offsite power have been verified operable?

a. All requirements satisfied, No Actions.
b. Declare the "A" D/G inoperable, and restore to operable status in 7 days.
c. Declare the "A" DIG inoperable, and restore to operable status in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d. One D/G parameter in the Alert Range. Submit an Action Report.

Answer 16

b. Declare the "A"D/G inoperable, and restore to operable status in 7 days.

16

EXAM QUESTION HISTORY d Question # RO SRO 17 TIER 2 Group 2 B000.1067 KA 034A2.01 Importance 4.4 Source of Question (Note: Attach question and any subsequent modifications to this r

attachment)

New Modified (Attach original and Modified Questions)

L 10CFR55 Content Original Bank Bank OrigimtingBank INPO 55.41 55.43 7

  1. Seabrook 5/30/2003 Learning Objective: RRFOlC 4.00 Given a set of plant conditions and a copy of the Refueling Emergency Procedure (RF-65.4),

apply the procedures.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference RF-65.4 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Answer Analysis: C is correct since these are the actions in RF-65.4.

Distractor Analysis: A is wrong since actions are reauired for droDping an assembly.

-J B is incorrect since evacuation is reauired. D is incorrect since position verification is not Dart of RF-65.4.

Question 17 B000.1067 (1 point(s))

. The following conditions exist:

There is a core off-load in progress The fuel handlers were moving irradiated he1 to a location in the spent fuel pool You are notified that the spent fuel bundle was accidently dropped in the spent fuel pool The bundle fell into the correct location R-5, Spent Fuel Pool radiation monitor reads 4 mrern/hr and is steady What actions, if any, are required?

a. No action is required
b. Enter procedure EPIP 1-13, High Radiation Area. Coder with EW about evacuating personnel fiom the area.
c. Enter procedure RF-65.4, Fuel Handling Accident. Evacuate personnel fiom the area and refer to EPIP 1-13, Local Radiation Emergency and EPIP 1-0 Event Classification.
d. Enter procedure RF-65.4, Fuel Handling Accident. Instruct the bridge to verify proper location in fuel pool and instruct RP to measure radiation levels above pool. Worm reactor engineering.

Answer 17

c. Enter procedure RF-65.4, Fuel Handling Accident. Evacuate personnel from the area and refer to EPIP 1-13, Local Radiation Emergency and EPIP 1-0 Event Classification.

17

EXAM QUESTION HISTORY

-. Question # RO SRO 18 TIER 2 Group 2 B000.1068 KA 08662.4.4 Importance 4.3 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank OriginatingBank #

10CFR55 Content 55.41 55.43 5 Learning Objective: RAPO4C 2.01 Given a set of plant and equipment conditions evaluate the conditions to determine the applicable procedure, and from the procedure determine the appropriate EXPECTED ACTIONS or RESPONSE NOT OBTAINED instructions to implement. (AP-CR. 1)

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference AP-CR.1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

AnswerAnalysis: D is correct since small fires which do not affect MCB eauinment are addressed bv AP-CR.1

Distractor Analysis: A and B are incorrect since ER-FIRE.1 only addresses Control Room

- fires where a loss of control room eauiDment occurs. C is incorrect since ER-FIRE.0 onlv gives general guidance for fires outside the Control Room.

Question Report B000.1068 None

-v-During 100% power operations a small fire occurs in the Control Room kitchen. Large quantities of smoke fill the Control Room forcing the operating crew to evacuate. Assuming the fire is controlled in the kitchen area, Which one of the following procedures is the operating crew required to implement?

a. E-0, Reactor Trip or Safety Injection
b. ER-FIRE.1, Alternate Shutdown for Control Complex Fire
c. ER-FIRE.0, Control Room Response to Fire Alarm and Reports
d. AP-CR. 1, Control Room Evacuation
d. AP-CR. 1, Control Room Evacuation 1

EXAM QUESTION HISTORY

-- Question ## RO TIER 3 SRO 19 Group B006.0001 KA G2.1.12 Importance 4.0 New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank Ginna # B006.0001 10CFR55 Content 55.41 55.43 2 Learning Objective: R2501C 9.02 Given a set of plant conditions and a copy of Tech Specs and Tech Spec referenced material (i.e. COLR) be able to apply the Tech Specs. To include: K O , applicability, applying action items, surveillances and the use of basis to aid in application.

Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference Tech S ~ e c3.5.2. 3.5.3. 3.0 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Tech SDecs 3.5.2. 3.5.3.

AnswerAnalysis: B is correct since onlv one ECCS train is reauired in Mode 4 and two trains are reauired in Mode 3. since YOU cannot increase modes with reauired eauipment 00s (TS 3.0.4)

i-Distractor Analysis: A is incorrect since the LCO reauirement for Modes 1-3 are not met.

C is incorrect since the LCO for the current mode is met. D is incorrect since TS 3.0.4 prohibits changing mode from 4 to 3.

Question 19 B006.0001 (1 point(s))

-- A plant heatup was in progress, with the RCS at 300 degrees F and 350 psig, when the B SI pump failed its surveillance and was declared inoperable. Which one of the below limits are placed on the plant heatup?

a. All ECCS LCOs satisfied, may operate in any mode.
b. ECCS LCO for this mode satisfied but may not proceed into mode 3.
c. ECCS LCO not satisfied, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to restore B SI pump, then 24 hrs to mode 5.
d. ECCS LCO satisfied for this mode but enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> clock when proceeding into mode 3.

Answer 19

b. ECCS LCO for this mode satisfied but may not proceed into mode 3.

19

EXAM QUESTION HISTORY

\l Question # RO SRO 20 TIER 3 Group B310.0119 KA 2.1.10 Importance 3.9 Source of Question (Note: Attach question and any subsequent modifications to this attachment)

New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank Ginna # B310.0119 Answer Analysis: D is correct per 10CFR50.540, a licensed SRO must amrove the deviation and per 0-9.3 this is a one-hour reDortable.

Distractor Analysis: A. B. C are incorrect since these individuals are not SRO licensed.

L

Question Report B310.0119 None

\__.

During performance of EOP's, the CRF determines that a deviation in accordance with 10CFR50.54(x) is necessary.

Which one of the following describes the required approvals/notifications?

a. The Director of Operations and the NRC must approve intended deviation prior to implementation.
b. The Director of Operations must approve the deviation. The NRC must be notified within one hour.

C. Plant Manager must approve the deviation. The NRC must be notified within four hours.

d. Licensed SRO must approve the deviation. The NRC must be notified within one hour.
d. Licensed SRO must approve the deviation. The NRC must be notified within one hour.

1

EXAM QUESTION HISTORY X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank #

Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference AR-J-5 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

None Answer Analysis: C is correct since the AR-J-5status that the breaker should not be reset unless the comDonent is reauired.

Distractor Analysis: A is incorrect since the comnonent is not needed for these plant u conditions. B is incorrect for the same reason as A. D is incorrect for the same reason as A.

Question 21 B000.1071 (I point(s))

-* Plant in Mode 1, 100% power, steady state conditions. Operators are filling the A SI Accumulator per S-16.13 with the B SI pump when the B SI pump breaker trips open. Which of the following is the correct operator action?

a. Attempt one B SI pump breaker reset and reclosure.
b. Reset the B SI pump breaker and start the C SI pump.
c. Do not attempt reset and reclosure of the B SI pump breaker. Initiate corrective action per IP-CAP. 1
d. Reset the B SI pump breaker and fill the A SI Accumulator with the SI Accumulator makeup pump Answer 2 1
c. Do not attempt reset and reclosure of the B SI pump breaker. Initiate corrective action per IP-CAP.1 21

EXAM QUESTION HISTORY X Question # RO ~

SRO 22 TIER 3 Group B300.0061 KA 2.2.23 Importance 3.8 Source of Question (Note: Attach question and any subsequent modifications to this attachment)

New Modified (Attach original and Modified Questions)

Original Bank #

I X I Bank Originating Bank Ginna # B300.0061 10CFR55 Content 55.41 55.43 1 Learning Objective: RAD13C 1.04 Given a hypothetical situation, demonstrate the ability to properly complete the attachments of procedure A-52.4.

Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference A-52.4 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

None AnswerAnalysis: D is correct since the tracking is used odv to document eauiument that is not needed for uresent condition

Distractor Analysis: A is incorrect since if the eauiDment

- is inoDerable. it must be tracked L regardless of the status of the redundant eauiDment. B is incorrect since the two documents are not linked. C is incorrect since it is not UD- to an individual to decide whether to meet this reauirement.

Question 22 B300.0061 (1 point(s))

+- Equipment covered in section 3 of ITS has become inoperable and is being documented by an A-52.4 Attachment. Which one of the following explains when the "Tracking Purposes Only" space should be checked?

a. The redundant componentkrain is operable
b. A WR/TR or WO is not required
c. At the discretion of the individual completing the attachment.
d. The equipment is not required to be operable for the present mode.

Answer 22

d. The equipment is not required to be operable for the present mode.

TC 96-020 22

EXAM QUESTION HISTORY Question # RO SRO 23 TIER 3 Group COOO.1061 KA 2.3.6 Importance 3.1 Source of Question (Note: Attach question and any subsequent modifications to this ttachment)

New Modified (Attach original and Modified Questions)

Original Bank #

X Bank OriginatingBank Ginna # C000.1061 10CFR55 Content 55.41 55.43 4 Learning Objective Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference CH-RETS-GDT-REL Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

Answer Analysis: A is correct since the release Drocedure reauires that R-14/R-l4A be checked Drior to a GDT release.

Distractor Analysis: B is incorrect since both Plant Exhaust Fans are not run at the same time. C is incorrect since the tank does not need to be held for 30 days. D - the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reauirement is incorrect.

Question 23 C000.1061 (1 point(s))

--- Which of the following items is the Shift Supervisor required to verify prior to authorizing a Gas Decay Tank Release?

a. Radiation Monitors R-14or R14A operable
b. Both Plant Vent Exhaust Fans are running
c. The Gas Decay Tank has been isolated and held for at least 30 days
d. The release will be initiated within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of tank sample time.

Answer 23

a. Radiation Monitors R-14or R14A operable 23

EXAM QUESTION HISTORY

- Question # RO SRO 24 TIER 3 Group BOOO.1069 KA 2.3.9 Importance 3.4 X New Modified (Attach original and Modified Questions)

Original Bank #

Bank Originating Bank # I 10CFR55 Content 55.41 55.43 4 Learning Objective: R2201C 6.02 Given a set of plant conditions and a copy of Tech Specs and Tech Spec referenced material (i.e. COLR) be able to apply the Tech Specs. To include: LCO, applicability, applying action items, surveillances and the use of basis to aid in application.

~L Cognitive Level Memory or Fundamental Knowledge Comprehension or Analysis X Technical Reference TS 3.3.5. S-232.2 Level of Difficulty (from attachment 3)

Answer Analysis: A is correct since TS 3.3.5 and S-23.2.2 reauire R-12 to be oDerable during irradiated fuel movement inside CNMT .

Distractor Analysis: B. C. and D are incorrect since CNMT Duree

- while irradiated fuel movement is in Dromess is not allowed with R-12 00s.

Question 24 B000.1069 (1 point(s))

-.- Given the following conditions:

Plant is in Mode 5 Irradiated Fuel Movement is in progress inside CNMT CNMT Purge is in service R- 12A is operable and in service R-12 Containment Noble Gas Monitor fails Using the attached references, which of the following statements describes the required action for this failure.

a. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to repair R-12, then remove purge fiom service and close the purge supply and exhaust valves.
b. Stop movement of Irradiated Fuel immediately, CNMT Purge may continue
c. No actions are required since R- 12A is in service and can be used to monitor CNMT Purge.
d. Purge may continue provided an operator is dedicated to monitoring R-12A and securing CNMT purge if R- 12A alarms.

Answer 24

a. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to repair R-12, then remove purge &om service and close the purge supply and exhaust valves.

23

EXAM QUESTION HISTORY Question # RO SRO 25 TIER 3 Group BOO. 1072 KA 2.4.28 Importance 3.3 Source of Question (Note: Attach question and any subsequent modifications to this ttachment) ~~

X New Modified (Attach original and Modified Questions)

Original Bank #

Bank OriginatingBank #

10CFR55 Content 55.41 55.43 5 Learning Objective Cognitive Level Memory or Fundamental Knowledge X Comprehension or Analysis Technical Reference S-30Step 5.3.1 Level of Difficulty (from attachment 3)

References required on Exam (Attach copy to this attachment)

None Answer Analysis: B is correct. S-30 reauires that the entire series be completed if sabotage is detected.

Distractor Analysis: A is incorrect since no shutdown is reauired. C is incorrect since more than checking; the one suspect valve is reauired. D is incorrect since no evacuation is reauired.

Question 25 B000.1072 (1 point(s))

While the plant is at 90%power, increasing to 100%, the Primary A 0 notifies the Control Room that he found SI pump suction valve V-890A with its chain cut and in the closed position. After notifying Security of this event, which of the following actions are the operators required to perform?

a. Begin a Plant Shutdown per 0-2.1, Shutdown to Hot Shutdown Conditions, continuing until SI Train A components are verified in their correct position.
b. Perform the S-30Safeguard Equipment Lineup check procedures to verify correct system valve and breaker positions,
c. Send two qualified operators to perform an independent verification on V-890Ayrelock the valve and then perform PT-2.1Q,Safety Injection System Quarterly Test.
d. Remain at 90%power until V-890A is verified in its correct position.

Answer 25

b. Perform the S-30Safeguard Equipment Lineup check procedures to verify correct system valve and breaker positions.

24