IR 05000244/1998002

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-244/98-02 on 980631
ML17265A323
Person / Time
Site: Ginna 
Issue date: 06/08/1998
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
References
50-244-98-02, 50-244-98-2, NUDOCS 9806150039
Download: ML17265A323 (6)


Text

CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9806150039 DOC.DATE: 98/06/08 NOTARIZED:'O FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

~

~

AUTH.NAME AUTHOR AFFILIATION CONTE,R.J.

Region 1 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION MECREDY,R.C.

Rochester Gas

& Electric Corp.

SUBJECT: Ack receipt of 980506 ltr informing NRC of steps taken to correct violations noted in insp rept 50-244/98-02 on 980631.

DISTRIBUTION CODE:

ZE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Znsp Rept/Notice of Vio ation Response NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET I 05000244 05000244 G

RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RAB DEDRO NRR/DRCH/HHFB NRR/DRPM/PERB OE DIR RGN1 FILE Ol COPIES RECIPIENT LTTR ENCL ZD CODE/NAME

1 VZSSING,G.

1

'

CE ER

1 NRR/DRPM/PECB

1 NUDOCS-ABSTRACT

1 OGC/HDS3

1 COPIES LTTR ENCL

1

1

1

1

1

1

ERNAL: LZTCO BRYCE,J H NRC PDR

1

1 NOAC NUDOCS FULLTEXT

1

1 D

E NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

SUBJECT:

NRC INSPECTION REPORT 50-244/98-02-REPLY

Dear Dr. Mecredy:

This letter refers to your May 6, 1998 correspondence, in response to our March 31, 1998 letter. This correspondence dealt with an event in which licensed reactor operators failed to notice and respond to an increase in reactor coolant pressure.

We have reviewed this matter in accordance with NRC inspection Manual Procedures 92901.

We concur with your assessment of the cause of the event.

In summary, those causes reflected the combined failure of the pressurizer defect switch and the failure of control room operators to monitor, detect and respond to related indications, parameter and alarms.

We consider the actions you have taken to address the root cause to be acceptable and willfurther review the effectiveness of these actions in a future inspection.

Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely,

/

(

Richard J. Conte, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No. 50-244 9806f50039 980608 PDR ADOCK 05000244

PDR

Robert cc w/encl:

R. Smith, Senior Vice President, Energy Operations Central Records (7 copies)

P. Eddy, Electric Division, Department of Public Service, State of New York C. Donaldson, Esquire, State of New York, Department of Law N. Reynolds, Esquire F. William Valentino, President, New York State Energy Research and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority

Robert Distribution w/encl:

Region I Docket Room (with concurrences)

PUBLIC NRC Resident Inspector Nuclear Safety Information Center (NSIC)

L. Doerflein, DRP R. Junod, DRP R. Conte, DRS J. Williams, DRS B. McCabe, Rl EDO Coordinator S. Bajwa, NRR G. Vissing, NRR M. Campion, ORA Inspection Program Branch, NRR (IPAS)

DOCDESK DRS File DOCUMENT NAME: G ttOLHP'tWILLIAMSiGIN9802.REP To receive a copy of this document, Indicate in the box:

C" = Copy without attachment/enctosure

"E" ~ Copy with attachment/enctosure

"N"= No copy OFFICE NAME TE RI/DRS JWilliams 05/14/98 RI/DRS RConte

/98 05/

/98 OFFICIAL RECORD COPY 05/

/98 05/

/98