Physical Security Insp Repts 50-220/87-09 & 50-410/87-19 on 870610-11.No Violations Noted.Major Areas Inspected:Security & Safeguards Contingency Plan,Physical Barriers (Protected & Vital Areas) & Training & Qualification Plan
ML17055D135
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 08/10/1987
From: Keimig R, Lancaster W, Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17055D134 List:
References
50-220-87-09, 50-220-87-9, 50-410-87-19, NUDOCS 8708170445
Download: ML17055D135 (6)


Text

U.S.

NUCLEAR REGULATORY COMMISSION

REGION I

50-220/87-09 Report Nos.

50-410/87-19 50-220 Docket Nos.

50-410 DPR-63 License Nos.

CPPR-112 Licensee:

Nia ara Mohawk Power Cor oration 300 Erie Boulevard West

~S racuse New York 13202 Facility Name:

Nine Mile Point Units 1 and

Inspection At:

Scriba New York Inspection Conducted:

June 10-11 1987 Type of Inspection:

Routine Announced Ph sical Securit Ins ection Inspectors:

M.

G.

M in, P

sical S

u y Inspector date K. Lancaste I

Approved by:

Physical S c ity Inspector P~/d -8 date z i-/z~

R.

R.

eimig, Chief, Saf ards Section, DRSS date Ins ection Summar

Routine Announced Ph sical Securit Ins ection on June 10-11 1987 50-220/87-09 and 50-410/87-19 Areas Ins ected; Security and Safeguards Contingency Plan; Physical Barriers (Protected and Vital Areas)

and Training and Qualification Plan.

Results:

The licensee was in compliance with NRC requirements in the areas examined.

8708i70445 8708ii PDR ADOCK 05000220 Q

PDR

0'

DETAILS Persons Contacted J.

P. Beratta, Supervisor, Nuclear Security D.

K. MacVittie, Nuclear Security Specialist D. O'ara, Assistant Nuclear Security Specialist C.

A'. Boniti, Supervisor of Training, Nuclear Security E.

E. Croucher, Firearms Instructor J.

A. Dilk, Training Instructor, Nuclear Security W. A. Mittag, Training Instructor, Nuclear Security J.

A. Dilk, Training Instructor, Nuclear Security F.

L. Laifer, Training Instructor, Nuclear Security D.

M. Pierce, Training Instructor, Nuclear Security The inspectors also interviewed other licensee personnel including members of the proprietary security force.

Securit Plan and Im lementin Procedures The inspectors reviewed the NRC-approved security plan and implementing procedures including changes contained in Plan Revision 2.

Plan Revision 2 was submitted by the licensee under

CFR 50.54(p)

on April 24, 1987 and subsequently accepted by Region I on June 17, 1987.

The procedures were adequate and appropriate to implement the NRC-approved security plan.

Ph sical Barriers Protected Area The inspectors observed that the licensee maintained the barrier surrounding the protected area in accordance with the NRC-approved security plan.

The licensee recently installed a second fence along the lake front protected area perimeter of Unit I, thus completing a double fence barrier along the lake front for both units.

Access Control Personnel The inspectors observed that the licensee's access control and badging system was in accordance with the NRC-approved security plan and that all personnel entering the Protected Area were properly searched for unauthorized material.

The search equipment was functioning properly and is adequate and appropriate for its intended purpose.

Securit Contin enc Plan Im lementation Review The inspectors reviewed the licensee's NRC-approved Security Contingency Plan, including Revision 2.

The licensee's program, as outlined in the

'RC-approved plan, was adequate.

There remains, however, a lack of participation by the operations organization in the contingency drills conducted by the security organization.

It was also noted that the

security organization has only minor involvement during full-scale site emergency exercises, including the exercise planned for June, 1987.

The inspectors addressed and,expressed concern over these matters in discus-sions with security management who assured that actions would be taken to increase participation of each organization, in each case.

6.

Trainin and ualifications Plan The licensee is planning numerous changes to the training and qualifica-tions plan to delete redundant requirements, incorporate new law enforce-ment -techniques, delete unnecessary or non-security related tasks, and combine security related tasks to reduce the total number of tasks.

These changes will be reviewed when the licensee submits a revision to the Plan to the NRC under

CFR 50.54(p),

in the near future..

7.

Exit Interview The inspectors met with the licensee personnel listed in Paragraph 1 at the conclusion of the inspection on June 11, 1987.

At that time the purpose, scope, and findings of the inspection were presented to the licensee by the inspectors.

Written material was not provided to the licensee by the inspector at any time during the inspectio N~

'