_
_
_
e l
+
.>
',
UNITED STATES NUCLEAR REGULATORY CottMISSION
' ' '
.
0FFICE OF -INSPECTION AND ENFORCDIENT
., _.
-
REGION *III-
,
+
-Report of Construction Inspection
.
IE Inspection Report'No. 050-155/75-13 Licensec:
Consumers Power Company 212 West. Michigan Avenue Jackson, Michigan:
49201 Big Rock Point Nuclear Plant License No. DPR-6-Charlevoix,' Michigan Category:
C
. Type of Licensec:
BWR 240 MWt Type of -Inspection:
Routine, Announced L
d
.
Pate of Inspection:
October 24, 1975
'
N
//~~/ 3 ~
Principal Inspector:
. dutton
.
(Date)
i
Accompanying Inspectors: None
,
h Other Accompanying Personnel: Nonc bk $.:.~,r
//! =!7I j
' Reviewed By:
D. W. Ilayes
,,
Senior Inspector
/ (Da t'e)
Construction Projects Section
'O Reactor Construction and
..
Engineering Support Branch
,
t-i
,,
.
8/0/23o741
.
r-
.
t
. -.
~
_
.
_
_
. -..
. ~.
.
.
,.
.
.
.
"4 b
=-
,
.
.
SUMMARY OF FINDINGS
.
,
< -
.
Inspection Summary'
Inspection on October-24,-(75-13):. Review of availabic doc-umentation pertaining to previous identified unresolved items:
'
- (1) Inservice inspection program and (2) Valve body wall
..
thickness measurement program (Inspection' Reports No._050-155/74-04 and No. 050-155/75-03).
Review of records for emergency condenser-piping repairs, main steam line defect repair and inservice-inspection performed during January to June, ~1975.
Enforcement Items
- None identified.
,
.
Licensee Action on Previously Identified Enforcement Items-Not applicable.
Other Significant Findings
'
.
A.
System-and. Components
-
.
1.
Unresolved Item - Big Rock Point (BRp) 1974 Inservice Inspection (ISI) Test Block Identification Identification of the ISI Test Blocks used in the 1974 ISI and the Final ISI report could not be determined.
(Paragraph 1, Report Details)
-
2.
Unresolved Item - Emergency Condenser Piping Repairs
,
The emergency condenser repair package was reviewed
-
for ce;,pietion. Documentation inc! ating a welder's
qualification to weld to procedure SM-1-1 was not-available for review. The documentation reviewed,
,
with the'cxception of one item, as noted, was found to be in order. The licensee indicated that this missing record would be in the corporate of fice files
.
and would be retrieved.
(Paragraph 2, Report Details)
'
1-2-
'
. :
-
,7
.
.
-
w a
-
-
~
r s
,, -
w-m--
-
---
-
- - - -
,.
e,--,
..,
.
.
-
-
..
-
,.
_
t
..
.
'
.
.
3.. Main Steam Line Def ect' Repairs
.
The records generated during the repair of the main steem ?ine defect were reviewed and found to be in order.
' Paragraph 3, ' Report Details)
4.:
1975 Inservice Inspection Records
The results of Consumers _ Power-Company (CP) Special
,
-Report No. 22. issue for the 1975 inservice inspection was reviewed and foundLto be in order.
(Paragraph 4, Report' De.*. ails)
' B.
Facility ltemr. (Plans _and Procedures)
Not applicabic.
C.
Managerial items
.
Not applicable.
D.
Noncompliance Identified and Corrected by Licensee None.
.
E.
Deviation
.
None.
F.
Status of Previously Reported Unresolved Items 1.
Inservice Inspection Program (R0 Inspection Peport No. 050-155/74-04)
I The calibration records for the acoustical search'
-
a.
units used during the 1974 Big Rock Point (BRP)
Inservice inspection were examined and found to be in order. The material cert'ification records-for ISI test blocks including the records for the chemical analysis of the 15 ISI test blocks located onsite and in (BRP's) possession, were examined and
,
.
were'found to be,in order.- The'above items are considered resolved.
..
b.
'The-authorized inspector sign off of the 1974 in-service inspection was not available for the in -
spectors review. This item remains open..(Para-
'
graphs 1 and 5, Report Details)
f-3-
!
$-
P-*
.
..
-
- _. _
-
.
..
.
..
-.. _.
_.
.
-
.
.
.
'
..
.
' 2.-
Valve Body Wall-Thteknens' Measurement Program (R0
,
'
Report No. 050-155/74-04)
-
Final evaluation and acceptance of the. valves that were measured.during the 1974 inservice inspection-has been documented. This item is. considered resolved.
Management Interview-
,
A.
The'following persons attended the management inte rview at the close of the inspection.
Consumers Power Company (CP)
G. C. Tyson, Maintenance Superintendent G. B. Szczotka, Quality Assurance Superintendent
.
B.
Matters. discussed and comments, on the part of management personnel, were as follows:
1.
The inspector-stated that the purpose of the inspection was to review the outstanding unresolved items that have-been reported as a result of IE's site inspection of
- July 15-18, 1974.
(R0 Inspection Report No. 050-155/74-04)
The inspector added that'not all the items could be resolved
.
due to the absence of adequate documentary evidence, to show that they had been reviewed and corrected by BRP personnel. The licensee stated that steps would be taken to resolve these matters.
s 2.
The inspector stated that during his review of the Final Report of the 1974 ISI, issued by Southwest Research
,
Institute (SWRI) that it was noted that the report still had not been signed off by the Authorized Inspector (AI)
and in addition he could not correlate the ISI test blocks in BRP's possession, with the report drawings of '
the test blocks used during the inspection.
The liccasce stated that this matter would be discussed with both the AI and SWRI. personnel.
(Paragraphs 1 and 5, Report Details)
~
3.
The inspector stated that with the exception of the welders qualification records for one welding procedure
.
not being availabic for review, the records for the steam line and emergency condenner repairs were found
to be in order. The licensee stated that they would request the welders qualification records from their corporate office for the inspectors review.
(Paragraphs 2 and 3, Report Details)
.
-4-
,
i s,
I par--
-
.
-
-,.
sy.
-,%
-
9n--.-9r
- - -.
_-
--p
-
y--gy 9, n 3
,,
.
-
.
.
.
'
4.
The inspector furtber stated that the documentation
.
reviewed for the valve body wall thickness measurement program and SWRT's reply to CP request for further clarification of SWit1's ISI record review was found
to be in order.
.
e P-5-
,
I
.
.
_ _
_
_
_
-
- _ _
w
_..
,
'
REPOR1 DETAILS.
-c e
. -..
R'esults of Inspection
~
'
1.-
1974 Inservice Inspection ISI Test Block Identification s
.
During the inspectors review of the final Southwest'Research t
Institute (SWRI) report of the>1974 inservice inspection it -
'
,
was-noted and brought to the attention of the licensee'that
.
correlation between the test blocks in the possession of BRP-and the drawings of the test blocks used by SWRI during the
- ISI could not be identified by, serial n' umbers or any other
The blocks presently under BRP-control have been stamped means.
,:
~
with a BRP serial number which does not appear on the drawings that are included in the final ISI report. The licensee is in the process of' reviewing the entire matter.
2.
Emergency Condenser Piping Repairs The inspector reviewed' available documentation pertaining to the repairs 'that were made to the emergency condenser piping.
,
The repairs consisted of removal and rewelding of a 15-inch section of the emergency condenser four-inch line. The r
following records were examined.
j
.
-
a.
Receiving Documentation, b.
Material-Certification.
.c.
Records of meetings between CP and,the AI.
.
d.
CP Report of Metallurgical Examinations of the Pipe in Question.-
,
e.
NDE Records and Examiners Qualifications.
-
f.
BRP Procedure No. MECS-1-A, Addendum B,. Revision 1,
April 21, 1975.
i j'
g.
BRP Procedure No. MECS-5-RW3, April 10,1975.
h.
W iding Procedures and Wolder Qualifications.
'
i.
Ilydrostatic Test of the Pipe.
j.
Ileat Treatment Records.
_
.
-6-
't
P'
,
,
.
.,
.
--
.-.,
m m.
-,,
.,e
--, - --
.,,,.,.. ~. -
,,.,..,,
.
.
_
.
__
,
.
,
.,.
,
+
'
k.
' Repair Inspection Checklist..
-
1.
Evaluation of the Linear Indication Found and Corrective
~
Action Taken.
.
'
.
With -the exception of missing qualification. records for a welder, the records reviewed were found to have been reviewed and signed as required by BRP procedures. 'The licensee is requesting the
,
missing qualification records from CP corporate headquarters for review during a subsequent inspection.
- Main St'am Line Repair 3.
e s
The inspector reviewed the records generated during the repair, of the main' steam line defect (AO-5-75).
The following records.
,
were examined.
.
-
a.
CP and AI meeting r.otes.
b.
Repair Procedure MISI-5, Revision 0, April 16, 1975.
~
Repair Inspection Checklist.
c.
d.,
NDE Records and Examiners Qualifications Welding Procedures and Welders Qualifications e.
,
f.
Heat Treatment Records.
.
g.
Hydro Test Records.
All records reviewed were found to be in order and had been reviewed and signed as required by BRP procedures.
-
4.
1975 Inservice Records The 1975 inservice records as generated during the ISI examination were reviewed for completion.
CP's Special Report No. 22, Titled. "1975 Inservice Inspection, Big Rock Point Plant" was used as the consulting document.
The inspection was conducted during the period of January through June 1975. The inspections were cenducted using the ASME Boiler and Pressure Vessel Code'Section XI, 1971
.
..s, Edition withothe summer 1971 Addenda and Section 9.0 of the BRP Technical Specifications.
t-7-
,-
,
l
-
.. -.
-..
...
-
-
-
,
.-
. -,
.
.-
>
.
.-
- ..
The inspections were cenducted_by CP Laboratory Technical
~
'
. -
Service Testing Services' and SWRI using qualified personnel.
-
The_ inspector-reviewed the following records:
.
.
a.
Special Report No.R22.
'
b.
c.
NDE Personnel Qualification.
-
,
d.
Material. Certification (Test Block and Couplant).
e.
Search Unit Certifications.
f.
Quality Assurance Inservice Records.
The inspector was' informed that a detailed audit and' review-of all records was to' be performed by BRP Quality Assurance Personnel. The results of the audit will be examined during a subsequent _ inspection.
5.-
LAuthorized Inspector Sign Off The licensee informed the inspector that the 1974 ISI
,.
final report had not been submitted to the AI, Hartford Steam Boiler Company for their review and sign off.
The licensee
~
stated that the. report will be sent to the AI after the records for the test blocks have been reviewed by CP QA
,
-personnel.
'
This item remains open.
-
,
I k.
.
ee i
e
.^
=
-8-
-
,
.
-
-
,
.
.
- -.
-.