ML20002D987

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-155/75-13 on 751024.No Noncompliance Noted
ML20002D987
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/14/1975
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20002D988 List:
References
751114, NUDOCS 8101230742
Download: ML20002D987 (2)


See also: IR 05000155/1975013

Text

REACTOR FACILITIES BRANCH

,i.

FILE COPY

uanED STA1!

,

NUCLEAft HEGULATORA COMMISSION

HEGloN lli

)

799 #400% EVE LT RO AD

CLEN ELLYN, ILLINO45 60137

'

i

,,

,

y r, .J 1!! 't9l6

Consumers Power Company

Dochet No. 50-155

ATfNt Mr. R. B. DcUltt

rianager of Nuclear Plant

Operations

212 West Hichigan Avenue

,

Jackson,!nchigan

49201

'

Gentlemen:

This refers to the inspection conducted by tir. Sutton of

this office on October 24, 1975, of activitics at Big Rock

,

Point Nucicar Plant authorized by NRC Reactor Operating

License No. DPR-6 and to the discussion of our findings

p_ .-

with Mr. Tyso- and others of your staff at the conclusion

,

of the inspection.

A copy of our report of this incpection is enclosed and identi-

~

fica the areas examined during the inspection. Within thcce

,

areas, the inspection consisted of a selective e,tamination of

procedures and representativ records, interviews with plant

personnel, and observations by the inspector.

.

No items of noncompliance with NRC requirements were identi-

,

ficd within the scope of this inspection.

. ,

_

In accordance with Section 2.790 of the NRC's " Rules of

b'

Practice," Part 2, Titic 10, Code of Federal Regulations, a

'

c

f this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room.

If this rep.rt

contains any informaticn that you or your contractors believe

to be proprietary, it is necessary that you make a written

application to this of"ce, within twenty days of your

reccipt of this letter. to withhold such information from

public disclosure. Any such application must include a full

statement of the reason.; for which it is cinimod that the

,

information is proprietary, and should ba prepared so the

proprietary informatirn identified in the application is

e

L.. .

b'M..

ir

, b

f

.

&

$/0l$ bOWA

-

ee

_z

_-

--. .. -

-

- - - -

- -

3,

, - - n v .,J %

,

-

.

.

I

Consuners Power

!!0V 1 4 2975

2-

Company

-

, , ,.

.

.

. ,

- contained in a separato part of the document. Unless wa

receive an application to withhold infomstion or are other-

vice contacted within the specified tina period, the written

catcrial identified in this paragraph vill be placed in the

Public Document Roon.

Should you have any qttections concemin;, this inepection, we

- ~ -

vill be glad to discuno the: with you.

,

Sincerely yours,

E. L. Jor.*nn, Actin 3 Chief

Reactor Operations and

!!uclear Support Branch

Enclecura:

IE Inspection Report

_

No. 050-155/75-13

.

cc v/ encl:

fir. C. J. Usrtmn, Plant

Superintendent-

bec w/cncl:

,

s

PDR

__

Local PDR

-

.

SNIC

TIC

Ronald Callen,Ilichigan Public

Service Commission

Anthony Roisman, Esq., Attorney

1

l

..

.c ..

.

  • . *

.

  • * " * *

-p*

e

Sw

4e

=

w-ma,,w,

.,

,_

g

,,

e


m

-

- _ _ _

,,