Forwards Physical Protection IE Insp Rept 50-155/75-07 on 750507-09 & Notice of Violation.Rept & Notice of Violation Withheld (Ref 10CFR2.790)
ML20031C113
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/23/1975
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Haueter R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8110060554
Download: ML20031C113 (2)


Text

{{#Wiki_filter:-. fo /

, .

' C? -% / & t f h W bl.{-{ &

, , ' k. 52 UNITE] STATES ~

NUCLEAR REGULATORY COMMISSION REGloNlli ~~

  • '

g 799 ROOSEVELT RO Ac CLEN ELLYN. ILLINOIS 60137 MAY Z 5 1975 fgn Docket No. 50-155 Consumers Power Company ATIN: Mr. Robert L. Haueter , Electrical Production Superintendent - Nuclear 212 Vcst Michigan Avenuo Jackson, liichigen 49201 Gentlemen: This referc to the physical protection inspection conducted at the Big Rock Point facility by Mr. J. F. Donahuc of this office on May 7-9, 1975, of cetivities authorized by URC License No. DPR-6, and to the discussion of our findings with Mecors. Hartman and Dafoe of your steff at the conclusion of the inspection.- The area exanined during this inspoetion was your pregam for protecting against industrial sabotage and cafeguarding special nuclear raterial purt,uaut to appliccbic provisions of 10 C Part 50, "Licea.cing of Production cnd Utilizatica Facilitics," Part 73, " Physical Protection of Plants and !!sterials;" cud specific requirements of 1:RC Licenso

' No. DPR-6.

Within this crea the inspection included selective e:mmination , of procedurcs and representative records, interviews with personnel and ' observations by the inspector.

The inspector also examined actions you have taken with respect to the catters identified in your letterc dated December 5, Decenber 26, 1974 l and January 24, 1975 which we previously brought to your attention. We l have no further questions concerning these r:atters.

f During this inspection, it was found thct certain of your activities The item and appear to be in nonec=pliance with IIRC requirements.

reference to pertinent requirements are licted in Enclosure A to this = tnclosure D licts an item of renco=pliance which uns identified - l Ictter, and corrected by ststion management and for which no additional inforcation is required at this time.

. I +jtuTrog ("4.

v % C E k,fa S 1;

eR 4)

  1. 2/6 19N 8110060554 750523

- $ O7 M< / f/

PDR ADOCK 05000155 G PDR - _. __... _. _ _ _ _ _ -. _ _ _ _. _ _____.

_.

- _.

__,__._.__ -

. a W , ... = % f=> g ' ~==

. 5 MAY Z3 1975

" . Consumers Power Company-2-This notice is sent to you pursuant to the provision of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Ccie of Federal Regulations.

Section 2.201 requires that you submit to this office within twenty days of your receipt of this notice a written statement or explanation in reply, inciv..ing: (1) corrective steps which have been taken by you, and the results achieved; (2) corrective steps which will be taken to cvoid further items of noncomplicnce and (3) the date - when full compliance will be achieved. Such a statement or explanation Er should be provided for the item listed in T.nclosure A and should be " submitted as a separate enclosure to your transmittal letter.

Arcas examined during this inspection concern a subject matter which is exe:pt from disclosure according to Section 2.790 of the IGC's " Rules of Practice," Part 2, Title 10, Code of Federal Reguictions.

Consequently, our report of this inspection (Report 1:o. 050-155D5-07), the enclosures to this letter and your response to this letter will not be placed in the Public Document Room.

Should you have any qurstions concerning this inspection, we will be glad to discuss them vith you.

2.

Sincerely yours, y2 - ? Gaston Fiore111, Chief - Reactor Operations Branch Enclosures: