Comments on Statements Made at 811221 Commission Meeting Re Info Flow During Facility Accident.Inconsistencies HighlightedML20151T363 |
Person / Time |
---|
Site: |
Three Mile Island |
---|
Issue date: |
01/11/1982 |
---|
From: |
Myers H NRC |
---|
To: |
Dircks B, Haller N NRC |
---|
Shared Package |
---|
ML20151T279 |
List: |
---|
References |
---|
FOIA-87-728, FOIA-87-853 NUDOCS 8804280664 |
Download: ML20151T363 (5) |
|
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20128G1661996-10-0303 October 1996 Summarizes 960924 Meeting W/Gpu Nuclear Corp in Rockville,Md Re Preliminary Responses to Staff RAI Concerning Request to Change EALs for TMI-1.List of Participants & Copy of Preliminary Response to RAI Encl 1999-09-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20248H7001998-05-20020 May 1998 Staff Requirements Memo Re SECY-98-071,exemption to 10CFR72.102(f)(1) Seismic Design Requirement for TMI-2 ISFSI ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months 1999-09-29
[Table view] |
Text
._ . _ - _ ._
O .
?e i ,
January 11, 1982 I
To Bill Dircks, Norman Haller From Henry Myers -
The following comments refer to statements made at the k December 21, 1981 Commission meeting concerning information
- flow during the TMI accident. '
- i. Mr. Stallo saidt '
' "I indicated in the memorandum that I sent to you - '
that I believed the conclusions of the House repart i
and are in the I&E conclusions substantive agreementare in factthem."
with consistent and we (Tr., p. 5. , underline added. ) ' I "And I did not agree to the conclusions until they
' were changed in such a way that I felt that they represented what I thought was a correct '
i
- characterization of what happened to the flow of i i
e informa tion. " .
I .i (Tr. , p. 6.) I '
4 "I do not believe that, based on everything that I i
i
' have seen that I can come to the judgement that t
'information was intentionally withheld' by the TMI managers. That conclusion does not now appear in the i i
final (House Interior Committee Staff) Report, and I !
recognize others who might read that might read the ,
i I
intent in it. I do not, because I was a party to the words as they are now written and therefore I read
,I ;
them the way I intended to when I discussed this with
- D r. Mye r s . " . -
4
- (Tr., p. 7 - 8.) f i The word "intent" was dropped from the draf t of the House ,
! Interior Committee Staf f Report in part because we were seeking to use words in our conclusion that would be subject 3
to as little dispute ac possible. .We belioved then and now i that the House Interior Committee Staff Report conclusions as they appear in the final report are an accurate statement ,
of what happened on March 28, 1979. We beliaved in !
January 1981 and we believe now that it was not necessary to !
! use the word "intent" which might be construed in various i ways. The conclusion as it stands says what we meant when we
! used the word "intent" in describing the raporting situation i
! at TMI on March 28, 1979: 1.e. , we believed then and now [
} that information was intentionally withheld. Note,
! [
i 8804280664 880422
, PDR FOIA j CONNORB7-728 PDR ,
i i ;
A --- - - - - . - - . . - _ - , . . . - _ - . . , _ . _ _ , _ - _ _ _ - , _ , , _ _ . _ _ _ . __ .. - - - . . , .
l l
Stat ments n'ade by others .concerning this matter are ;
summarized in the attached letter from Chairman Udall to Dr. t Moeller. These statements are worth reading. When Mr. Stallo {
soyo that he knows of no other investigations that have come -
to the conclusion in writino that information was :
i intentionally withheld, does he mean that he knows of invoctigators who believe in their minds (although they did ,
not so indicate in writing) that information was .. :
intcntionally withheld?
Kr. Stello appeared to indicate that information was cknowingly" withheld if the word "knowingly" did not imply [
aintent." Did Mr. Stello in fact mean to .say that to 2 - 7
- knowingly withhold information does not imply intent?
- If a person has an obligation to report fully on what is
- going on and that person does not report information which 8
that person understands to be relevant to what is going on, i hsw do you explain the withholding of information other than having been a conscious, intentional decision to withhold?
i on December 21, Mr. Stallo engaged in the following dialogue
, with Commissioner Gilinsky with regard to whether Mr. Stallo :
believed Met-Ed employees had not been forthright with State i j officials. j Commissioner Gilinsky: I take it if you accept the ;
i Rouse Committee report that you're concluding the t company did not level with the State? --"- l Mr. Stallo: I don't know why I need to use the House [
Committee report when your own report of your staff ,
- l. reached the same conclusion, that they were not fully l forthcoming, that at times during the day they should ;
i have picked up the phone and let certainly the State i
! of Pennsylvania know that thers was considerable j uncertainty concerning the adequacy of core cooling -
and the seriousness of the accident. . . .
i (Tr., p. 12.) ;
Tha foregoing is an. admission that the TMI managers did not fulfill the Emergency Plan reporting requirements to
' ... provide maximum assistance and information possible to
- tho various (State and Federal) of f-site groups. . . . " and to provide information on the status of "consequence mitigation footures," the "possible need for protective action," and -
tho. status of the plant. " "Maximum information" was clearly ;
cot. provided to State and Federal of ficials. Incomplete [
information was provided with regard to "consequence ;
citigating features and the possible need for protective '
cetion." And the status of the plant was not clearly conveyed; i.e. that the plant was not in any of the cotogories specified,in Section 3 (Subsection 2.5) of the i Three Mile Island Emergency Plan, and the actual status of '
tho: plant was not fully and accurately described to the F State or the NRC in the course of discussion between plant I mantgers and State and Federal of ficials. ,
r
'. ..In discussion on pages 13 and 14 Mr. Stello appears to be saying that information was held back but not intentionally so. If information was not intentionally held back, was it l unintentionally held back?
on page 14, Mr. Stallo states: i "I think they were aware they weren't transmitting that the accident was more serious, yes," j What does the forergoing mean other than intentional
- withholding of information? '
l On page 15, the following exchange is recorded: !
Commissioner Gilinsky: They conveyed the impression i the accident was substantially less severe and the !
situation more under control than the managers themselves believed.
Mr. Stello: That's exactly the conclusion we came to l in our report.
Again, what does the foregoing mean other than that Mr.
Stallo believes that information was intentionally or '
willfully withheld?
On page 17, Mr. Stello is reported as having said that "not :
fully forthcoming" meant "misleading" to him. Websters New Collegiate Dictionary says that " to mi s le ad " is , "to lead in ;
a wrong direction or into a mistaken action or belief of ten :
by deliberate deceit." The single synonym given for "mislead" is "deceive."
on page 19, the following exchange is recorded:
commissioner Gilinsky: And I took you to be saying ,
that they had not shared this information with the -
state and were aware they had not. Am I wrong? t l
Mr. Stallo: That's conclusion four of our report, what does Mr. Stello mean in the foregoia'g exchange if not i that information was intentionally or willfully withheld? :
on page 20, Mr. Stello states they (the TMI managers) should have told the state that the accident was serious. What is ,
the explanation for their not having done so?
On page 20, Mr. Stallo says that they (the TMI managers) reported as to actions taken in the plant. This statement obscures the fact that the plant managers did not report fully on what they 1 were doing the managers' reports omitted important information
(
such as temperataure data, that a LOCA had been in progress for some 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and twenty minutes during which time the operators were unaware of it, and that high pressure injection had been l s
throttled during this period. Lacking such information, State and i Federal officials were unable to accurately assessing plant f conditions. i
Mr. Stello also states on pages 21 that he knew the core was
<uhuevered on the basis of the information he had received.
As far as we kn6w, however, he did not know the extent of core uncovering, the fact that a LOCA had been in progress for more than two hours during which time the operators were unawareof it, that high pressure injection had been throttled during this time, and that temperatures in excess of 2000 degrees had been measured above the core. The basis for believing that the severity of the accident was greatly underestimated on March 28 by Mr. Stallo and the NRC is Chairman Hendrie's testimony to the House Interior Committee on March 29 when he said, "perhaps up to 1% of the fuel in the core might have been involved in the cladding cracks. "
on page 22, the following exchange is recorded: .
Commissioner Gilinsky But they knew' they were beyond their training, beyond their experience, beyond the written procedures. They had reports of core temperatures in the thousands of degrees. They then communicated with the state and the state put out a satement, everything is under control, there is and was no danger.
Mr. Stallo: I agree with everything you said, when you
' start the preamble, putting intent aside.
How can one agree with Gilinsky's statement but infer that something other than "intent" is conveyed by that statement?
On pages 23 - 24, Mr. Stello rays that before the plant managers lef t for their meeting with Lt. Governor Scranton at approximately 2: 00 P.M. , they had gotten "a rather cheerful sign" including, among other things, indications that the tamperatures i
were coming down and, furthermore, they thought they had a mode of cooling that was stable. Station manager Gary Miller's assessment of the situation during the period prior to his leaving for the Lt. Governor's office is contained in the attached statement prepared by Mr. Miller and datad May 7, 1979.
Also attached are excerpts from the September 5, 1980 I&E interview with Mr. Miller wherein discussion occurs as to information passed on to the State during the March 28 af ternoon meeting in the Lt. Governor's office. The reader may judge whether the plant managers had in fact concluded they were approaching a stable cooling mode at approximately 2:00 P.M. Any assessment made prior to leaving for the Lt. Governor's office would have been made shortly af ter the hydrogen detonation. This is approximately the time at which Shif t Supervia:.r Chwastyk recalled to investigators that on the basis of the symptoms of the hydrogen detonation he had persuaded Station Manager Gary Miller to approve a change from a depressurization to a repressurization strategy. (See House Interior Committee Staff Report, p.66 - 68.) In view of this record, what is Mr. Stello 's basis for saying that the plant managers thought they had a mode of cooling that was getting to be stable at the very hour (2:00 P.M. - 3:00-P.M.) they were changing from one procedure that was not working to another that they hoped (but could not be certain) would bring the plant to a stable condition?
. .A On'paqq '28, Mr. Stello suggests that the reporting failurs resultac f rom there not having been a system for putting the available information together. How is this suggestion supposed to jibe with the existence of the Command Team described by Mr. Millers e.g. see House Interior Committee Staff Report, p. 4 - 57 Note also statements in House Interior Committee Staff Report indicating that Miller had been told about the stuck open PORV, that he personally was aware of the high temperatures above the core and in the hot legs, that he was aware of uncertainties regarding the adequacy of core cooling, and that he knew they wars in a cordition not encompassad by the emergency prodcedures.
k s
f l
l I
i 1
6-i i
$ i 1
_ _ _ _ _ . . - . , _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _