HBL-20-002, Title 10 CFR 50.59 Report of Changes1 Tests, and Experiments for the Reporting Interval of January 1, 2018, Through December 31, 2019

From kanterella
Jump to navigation Jump to search
Title 10 CFR 50.59 Report of Changes1 Tests, and Experiments for the Reporting Interval of January 1, 2018, Through December 31, 2019
ML20027B231
Person / Time
Site: Humboldt Bay
Issue date: 01/27/2020
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
HBL-20-002
Download: ML20027B231 (1)


Text

Pacific Gas and Electric Company*

James M. Welsch Diablo Canyon Power Plant Senior Vice President P.O. Box 56 Generation and Avila Beach, GA 93424 Chief Nuclear Officer 805.545.3242 E-Mail: James.Welsch@pge.com January 27, 2020 PG&E Letter HBL-20-002 ATTN: Document Control Desk 10 CFR 50.59 U.S Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 50-133, License No. DPR-7 Humboldt Bay Power Plant, Unit 3 Title 10 CFR 50.59 Report of Changes Tests, and Experiments for the Reporting 1

Interval of January 1, 2018, through December 31, 2019

Dear Commissioners and Staff:

Pursuant to 10 CFR 50.59(d)(2), Pacific Gas and Electric Company (PG&E) is providing this letter to inform the NRC that for the reporting interval of January 1, 2018 through December 31, 2019, there were no 10 CFR 50.59 evaluations performed for changes made to the Humboldt Bay Power Plant, Unit 3.

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this submittal, please contact Mr. Philippe Soenen at (805) 459-3701.

Sincerely, cc: John 8. Hickman, NRC Project Manager Scott A. Morris, NRC Region IV Administrator HBPP Humboldt Distribution