GO2-21-040, Level of Financial Protection - Annual Reporting Requirement

From kanterella
Jump to navigation Jump to search
Level of Financial Protection - Annual Reporting Requirement
ML21077A309
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/18/2021
From: Wolfgramm D
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-21-040
Download: ML21077A309 (1)


Text

ENERGY Desirée Wolfgramm Columbia Generating Station NORTHWEST P.O. Box 968, PE20 Richland, WA 99352-0968 Ph. 509-377-4792 dmwolfgramm@energy-northwest.com March 18, 2021 GO2-21-040 10 CFR 50.54(w)(3)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LEVEL OF FINANCIAL PROTECTION - ANNUAL REPORTING REQUIREMENT

Dear Sir or Madam:

In accordance with the requirements of 10 CFR 50.54(w)(3) to report the sources and amount of financial protection (i.e., nuclear property insurance) carried by operating facilities, the following information is submitted for insurance coverage obtained through Nuclear Electric Insurance Limited (NEIL) for the Columbia Generating Station:

Policy Insurer/Insurance Policy Title Limits Number NEIL - Primary Property and Decontamination Liability P20-121 $1.50 Billion NEIL - Decontamination Liability, Decommissioning X20-121 $1.25 Billion Liability and Excess Property NEIL - Accidental Outage E20-121 $0.49 Billion Total Nuclear Property Insurance $3.24 Billion There are no commitments being made to the U.S. Nuclear Regulatory Commission by this letter. Should you have any questions or require additional information pertaining to this report, please contact me at (509) 377-4792.

18 March Executed on the _____ day of ________________, 2021.

Respectfully, DocuSigned by:

i:>~.kJ~

DM4AWolfgramm 1EB 13DF63A4A2 ...

Manager, Regulatory Affairs cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector - 988C CD Sonoda - BPA/1399