GO2-05-058, Init Exam - 06/2005 - Transmittal Letter - Draft of Initial License Examination

From kanterella
Jump to navigation Jump to search
Init Exam - 06/2005 - Transmittal Letter - Draft of Initial License Examination
ML052380176
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/24/2005
From: Atkinson D
Energy Northwest
To: Mark Haire
NRC Region 4
References
50-397/05-301, GO2-05-058 50-397/05-301
Download: ML052380176 (2)


Text

ENERGY

'NORTHWEST r#e*Vision .Solutions EO. Box 968 Richland. WA 99352-0968 March 24,2005 GO2-05-058 Mark S. Haire U .S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005

Subject:

COLUMBFA GENERATING STATION, DOCKET NO. 50-397 DRAFT OF INITIAL LICENSE EXAMINATION

Dear Mr.Haire:

Attached are the proposed examination materials and checklists for the SRO and RO license examinations scheduled the weeks of May 23, 2005 and June 13, 2005 at Columbia Generating Station. Specifically the following materials are enclosed:

1. SRO Written Examination
2. RO Written Examination
3. Written Examination Answer Key (including references & exam matrix)
4. Simulator Dynamic Scenarios (3 total including references)
5. Operating Test Quality Assurance Checklist - ES-301-3
6. Simulator Scenario Quality Assurance Checklist - ES-301-4
7. Transient and Event Checklist - ES-301-5
8. Competencies Checklist - ES-301-6
9. Written Examination Quality Checklist - Es-401-6 THE ENCLOSED EXAMINATION MATERIALS SHALL 3 E WITHHELD FROM PUBLIC DISCLOSURE UNTIL AFTER THE EXAMINATIONS ARE COMPLETE.

Mr. Haire Page 2 DRAm INITIAL LICENSE EXAMINATION If you have any questions, please contact Mr. RE Guthrie, Manager, Operations Training, at (509) 3 ~ ~ 6 9 .

Respectfully, DK Atkinson Vice President, Nuclear Generation Mail Drop PEO8 cc: w/o attachment NRC Sr. Resident Inspector - 988C RN Sherman BPA11399 Document Control Desk - NRC BJ Benney - NRC - NRR W A Horin - Winston & Strawn