GNRO-2017/00018, Spent Fuel Storage Radioactive Effluent Release Report for 2016
ML17089A316 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 03/30/2017 |
From: | Nadeau J Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
GNRO-2017/00018 | |
Download: ML17089A316 (2) | |
Similar Documents at Grand Gulf | |
---|---|
Category:Environmental Monitoring Report
MONTHYEARML24113A0952024-04-22022 April 2024
[Table view]Annual Radioactive Effluent Release Report for 2023 ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23047A4332023-02-16016 February 2023 Spent Fuel Storage Radioactive Effluent Release Report 2022 ML22118A0862022-04-28028 April 2022 Annual Radioactive Effluent Release Report (ARERR) ML22111A0682022-04-21021 April 2022 Annual Radiological Environmental Operating Report (AREOR) ML22053A1192022-02-22022 February 2022 Spent Fuel Storage Radioactive Effluent Release Report for 2021 ML21119A1242021-04-28028 April 2021 Annual Radiological Environmental Operating Report GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report ML20108F5752020-04-17017 April 2020 Annual Radiological Environmental Operating Report (AREOR) GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 ML19283A2592019-10-10010 October 2019 Transmittal of National Pollutant Discharge Elimination System NPDES Permit Approved on July 2, 2019 GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2018/00022, Annual Radiological Environmental Report (AREOR)2018-04-28028 April 2018 Annual Radiological Environmental Report (AREOR) GNRO-2018/00021, Annual Radioactive Effluent Release Report (ARERR)2018-04-25025 April 2018 Annual Radioactive Effluent Release Report (ARERR) GNRO-2018/00006, Spent Fuel Storage Radioactive Effluent Release Report for 20172018-02-27027 February 2018 Spent Fuel Storage Radioactive Effluent Release Report for 2017 GNRO-2017/00055, Revised Grand Gulf Nuclear Station (GGNS) Annual Radioactive Effluent Release Report (ARERR) for 20162017-09-0707 September 2017 Revised Grand Gulf Nuclear Station (GGNS) Annual Radioactive Effluent Release Report (ARERR) for 2016 GNRO-2017/00043, Amended Annual Radioactive Effluent Release Report (ARERR) for 20152017-07-0505 July 2017 Amended Annual Radioactive Effluent Release Report (ARERR) for 2015 GNRO-2017/00028, Annual Radioactive Effluent Release Report (Arerr)For 20162017-04-27027 April 2017 Annual Radioactive Effluent Release Report (Arerr)For 2016 GNRO-2017/00029, Annual Radiological Environmental Operating Report2017-04-27027 April 2017 Annual Radiological Environmental Operating Report GNRO-2017/00018, Spent Fuel Storage Radioactive Effluent Release Report for 20162017-03-30030 March 2017 Spent Fuel Storage Radioactive Effluent Release Report for 2016 ML16202A2352016-07-20020 July 2016 Transmittal of 2015 Annual Radioactive Effluent Release Report (ARERR) GNRO-2016/00019, Transmittal of 2015 Annual Radiological Environmental Operating Report (AREOR)2016-04-19019 April 2016 Transmittal of 2015 Annual Radiological Environmental Operating Report (AREOR) GNRO-2016/00020, Transmittal of 2015 Annual Radioactive Effluent Release Report2016-04-19019 April 2016 Transmittal of 2015 Annual Radioactive Effluent Release Report GNRO-2016/00011, Spent Fuel Storage Radioactive Effluent Release Report for 20152016-02-16016 February 2016 Spent Fuel Storage Radioactive Effluent Release Report for 2015 GNRO-2015/00028, Submittal of 2014 Annual Radioactive Effluent Release Report2015-04-27027 April 2015 Submittal of 2014 Annual Radioactive Effluent Release Report GNRO-2015/00027, Submittal of 2014 Annual Radiological Environmental Operating Report (AREOR)2015-04-23023 April 2015 Submittal of 2014 Annual Radiological Environmental Operating Report (AREOR) GNRO-2014/00037, 2013 Annual Radioactive Effluent Release Report2014-04-30030 April 2014 2013 Annual Radioactive Effluent Release Report GNRO-2013/00101, Annual Radioactive Effluent Release2014-01-0808 January 2014 Annual Radioactive Effluent Release GNRO-2013/00040, Submittal of 2012 Annual Radioactive Effluent Release Report, Revision 1 Per 10 CFR 50.36a(a)(2)2013-06-10010 June 2013 Submittal of 2012 Annual Radioactive Effluent Release Report, Revision 1 Per 10 CFR 50.36a(a)(2) GNRO-2013/00037, Annual Radiological Environmental Operating Report (AREOR)2013-05-0101 May 2013 Annual Radiological Environmental Operating Report (AREOR) ML13121A2442013-04-30030 April 2013 2012 Annual Radioactive Effluent Release Report ML12157A4132012-05-23023 May 2012 Attachment 34 to GNRO-2012/00039 - Er Reference - MDEQ 2011a (NPDES Permit Rationale) Rationale for Reissuance ML12157A4952012-05-23023 May 2012 Attachment 43 to GNRO-2012/00039 - Er Reference-GGNS 2007g (2006 Depredation Report) ML12157A4422012-05-23023 May 2012 Attachment 44 to GNRO-2012/00039 - Er Reference-GGNS 2008e (2007 Depredation Report) ML12157A4432012-05-23023 May 2012 Attachment 45 to GNRO-2012/00039 - Er Reference-GGNS 2009g (2008 Depredation Report) ML12157A4452012-05-23023 May 2012 Attachment 46 to GNRO-2012/00039 - Er Reference-GGNS 201 of (2009 Depredation Report) ML12157A4462012-05-23023 May 2012 Attachment 47 to GNRO-2012/00039 - Er Reference-GGNS 2011 H (2010 Depredation Report ML12157A1842012-05-23023 May 2012 Attachment 11 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment Q Labeled Thermal Monitoring Reports for Winter and Summer 2007. ML12157A2472012-05-23023 May 2012 Attachment 23 to GNRO-2012/00039, Er Reference - Entergy 2011 a (EN-CY-111) Radiological Ground Water Monitoring Program ML12157A2642012-05-23023 May 2012 Attachment 19 to GNRO-2012/00039, Er Reference - Entergy. 2008a. Entergy Nuclear Fleet Procedure EN-CY-109, Sampling and Analysis of Groundwater Monitoring Wells, Revision 2. April 1, 2008 ML12157A4252012-05-23023 May 2012 Attachment 37 to GNRO-2012/00039 - Ensr (Ensr Corporation), 2005 Appendix B, Review of Lower Mississippi Fishes. March 2005 ML12157A4272012-05-23023 May 2012 Attachment 39 to GNRO-2012/00039 - Mp&L (Mississippi Power & Light Company). 1981. Mississippi Power & Light Company, Middle South Energy, Inc., Grand Gulf Nuclear Station Units 1 and 2, Final Environmental Report, Docket Nos. 50-416 and 50 ML12157A4472012-05-23023 May 2012 Attachment 48 to GNRO-2012/00039 - Er Reference-USDA 1976 (Franklin Line Permit) ML12157A4502012-05-23023 May 2012 Attachment 50 to GNRO-2012/00039 Enercon. 2011 B. Evaluation of Potential Air Emissions from Coal and Natural Gas Fired ML12157A4512012-05-23023 May 2012 Attachment 51 to GNRO-2012/00039 Ggns. 2004. Air Pollution Control Permit to Operate Air Emissions Equipment at a Synthetic Minor Source, Permit No. 0420-00023. June 1, 2004 ML12157A5502012-05-23023 May 2012 Attachment 42 to GNRO-2012/00039 - Decision Notice and Finding of No Significant Impact Utility Corridor Maintenance for Wildlife Habitat Enhancement and Associated Environmental Assessment (Provided in Attachment C on the Terrestrial Ecolo ML12157A4482012-05-23023 May 2012 Attachment 49 to GNRO-2012/00039 - Ggns. 2008g. Grand Gulf Nuclear Station (Ggns), Facility No. 0420-00023, Renewal of Existing Synthetic Minor Operating Permit No. 0420-00023, Correspondence GEXO-200810008. November 25, 2008 2024-04-22 Category:Letter type:GNRO MONTHYEARGNRO-2013/00079, 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013)2023-10-11011 October 2023
[Table view]2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013) GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes 2023-06-06 |
Text
~Entergy Entergy Operations, Inc.
P.o. Box 756 Port Gibson, MS 39150 James Nadeau Manager, Regulatory Assurance Grand Gulf Nuclear Station Tel. (601) 437-2103 GNRO-2017/00018 March 30, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Spent Fuel Storage Radioactive Effluent Release Report for 2016 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29
Dear Sir or Madam:
Grand Gulf Nuclear Station (GGNS) Certificate of Compliance for Spent Fuel Storage Casks Section 5.4 requires the submittal of an Annual Radioactive Effluent Release Report.
Additionally, Title 10 Code of Federal Regulations 72.44(d)(3) requires the annual submittal of a summary of effluents from the independent spent fuel storage facility. The purpose of this letter is to document effluent radioactive release for the past calendar year from the spent fuel storage casks.
The HI-STORM 100 Cask System does not create any radioactive materials or have any radioactive waste treatment system. Therefore, specific operating procedures for the control of radioactive are not required. The HI-STORM 100 Cask System is also designed and fabricated with a totally seal-welded pressure vessel such that leakage from the confinement boundary is not considered to be a credible occurrence. Therefore, there are no radionuclides released to the environment in liquid or gaseous effluents from the independent spent fuel storage facility at GGNS during the reporting period of January 1, 2016 to December 31, 2016.
This letter contains no new Regulatory Commitments. Should you have any questions or require additional information, please contact Richard Sumrall 601-437-2115.
Sincerely, JJN/sas cc: (see next page)
GNRO-2017/00018 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission ATTN: Mr. Siva Lingam, NRR/DORL (w/2)
Mail Stop OWFN 8 B1 11555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: Mr. Kriss M. Kennedy (w/2)
Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Mr. B. J. Smith (w/2)
Director, Division of Radiological Health Mississippi State Department of Health Division of Radiological Health 3150 Lawson Street Jackson, MS 39213 Dr. Mary Currier, M.D., M.P.H.
State Health Officer Mississippi Department of Health P.O. Box 1700 Jackson, MS 39215-1700 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150