|
---|
Category:Environmental Monitoring Report
MONTHYEARML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23047A4332023-02-16016 February 2023 Spent Fuel Storage Radioactive Effluent Release Report 2022 ML22118A0862022-04-28028 April 2022 Annual Radioactive Effluent Release Report (ARERR) ML22111A0682022-04-21021 April 2022 Annual Radiological Environmental Operating Report (AREOR) ML22053A1192022-02-22022 February 2022 Spent Fuel Storage Radioactive Effluent Release Report for 2021 ML21119A1242021-04-28028 April 2021 Annual Radiological Environmental Operating Report GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report ML20108F5752020-04-17017 April 2020 Annual Radiological Environmental Operating Report (AREOR) GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 ML19283A2592019-10-10010 October 2019 Transmittal of National Pollutant Discharge Elimination System NPDES Permit Approved on July 2, 2019 GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2018/00022, Annual Radiological Environmental Report (AREOR)2018-04-28028 April 2018 Annual Radiological Environmental Report (AREOR) GNRO-2018/00021, Annual Radioactive Effluent Release Report (ARERR)2018-04-25025 April 2018 Annual Radioactive Effluent Release Report (ARERR) GNRO-2018/00006, Spent Fuel Storage Radioactive Effluent Release Report for 20172018-02-27027 February 2018 Spent Fuel Storage Radioactive Effluent Release Report for 2017 GNRO-2017/00055, Revised Grand Gulf Nuclear Station (GGNS) Annual Radioactive Effluent Release Report (ARERR) for 20162017-09-0707 September 2017 Revised Grand Gulf Nuclear Station (GGNS) Annual Radioactive Effluent Release Report (ARERR) for 2016 GNRO-2017/00043, Amended Annual Radioactive Effluent Release Report (ARERR) for 20152017-07-0505 July 2017 Amended Annual Radioactive Effluent Release Report (ARERR) for 2015 GNRO-2017/00028, Annual Radioactive Effluent Release Report (Arerr)For 20162017-04-27027 April 2017 Annual Radioactive Effluent Release Report (Arerr)For 2016 GNRO-2017/00029, Annual Radiological Environmental Operating Report2017-04-27027 April 2017 Annual Radiological Environmental Operating Report GNRO-2017/00018, Spent Fuel Storage Radioactive Effluent Release Report for 20162017-03-30030 March 2017 Spent Fuel Storage Radioactive Effluent Release Report for 2016 ML16202A2352016-07-20020 July 2016 Transmittal of 2015 Annual Radioactive Effluent Release Report (ARERR) GNRO-2016/00019, Transmittal of 2015 Annual Radiological Environmental Operating Report (AREOR)2016-04-19019 April 2016 Transmittal of 2015 Annual Radiological Environmental Operating Report (AREOR) GNRO-2016/00020, Transmittal of 2015 Annual Radioactive Effluent Release Report2016-04-19019 April 2016 Transmittal of 2015 Annual Radioactive Effluent Release Report GNRO-2016/00011, Spent Fuel Storage Radioactive Effluent Release Report for 20152016-02-16016 February 2016 Spent Fuel Storage Radioactive Effluent Release Report for 2015 GNRO-2015/00028, Submittal of 2014 Annual Radioactive Effluent Release Report2015-04-27027 April 2015 Submittal of 2014 Annual Radioactive Effluent Release Report GNRO-2015/00027, Submittal of 2014 Annual Radiological Environmental Operating Report (AREOR)2015-04-23023 April 2015 Submittal of 2014 Annual Radiological Environmental Operating Report (AREOR) GNRO-2014/00037, 2013 Annual Radioactive Effluent Release Report2014-04-30030 April 2014 2013 Annual Radioactive Effluent Release Report GNRO-2013/00101, Annual Radioactive Effluent Release2014-01-0808 January 2014 Annual Radioactive Effluent Release GNRO-2013/00040, Submittal of 2012 Annual Radioactive Effluent Release Report, Revision 1 Per 10 CFR 50.36a(a)(2)2013-06-10010 June 2013 Submittal of 2012 Annual Radioactive Effluent Release Report, Revision 1 Per 10 CFR 50.36a(a)(2) GNRO-2013/00037, Annual Radiological Environmental Operating Report (AREOR)2013-05-0101 May 2013 Annual Radiological Environmental Operating Report (AREOR) ML13121A2442013-04-30030 April 2013 2012 Annual Radioactive Effluent Release Report ML12157A4132012-05-23023 May 2012 Attachment 34 to GNRO-2012/00039 - Er Reference - MDEQ 2011a (NPDES Permit Rationale) Rationale for Reissuance ML12157A4952012-05-23023 May 2012 Attachment 43 to GNRO-2012/00039 - Er Reference-GGNS 2007g (2006 Depredation Report) ML12157A4422012-05-23023 May 2012 Attachment 44 to GNRO-2012/00039 - Er Reference-GGNS 2008e (2007 Depredation Report) ML12157A4432012-05-23023 May 2012 Attachment 45 to GNRO-2012/00039 - Er Reference-GGNS 2009g (2008 Depredation Report) ML12157A4452012-05-23023 May 2012 Attachment 46 to GNRO-2012/00039 - Er Reference-GGNS 201 of (2009 Depredation Report) ML12157A4462012-05-23023 May 2012 Attachment 47 to GNRO-2012/00039 - Er Reference-GGNS 2011 H (2010 Depredation Report ML12157A1842012-05-23023 May 2012 Attachment 11 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment Q Labeled Thermal Monitoring Reports for Winter and Summer 2007. ML12157A2472012-05-23023 May 2012 Attachment 23 to GNRO-2012/00039, Er Reference - Entergy 2011 a (EN-CY-111) Radiological Ground Water Monitoring Program ML12157A2642012-05-23023 May 2012 Attachment 19 to GNRO-2012/00039, Er Reference - Entergy. 2008a. Entergy Nuclear Fleet Procedure EN-CY-109, Sampling and Analysis of Groundwater Monitoring Wells, Revision 2. April 1, 2008 ML12157A4252012-05-23023 May 2012 Attachment 37 to GNRO-2012/00039 - Ensr (Ensr Corporation), 2005 Appendix B, Review of Lower Mississippi Fishes. March 2005 ML12157A4272012-05-23023 May 2012 Attachment 39 to GNRO-2012/00039 - Mp&L (Mississippi Power & Light Company). 1981. Mississippi Power & Light Company, Middle South Energy, Inc., Grand Gulf Nuclear Station Units 1 and 2, Final Environmental Report, Docket Nos. 50-416 and 50 ML12157A4472012-05-23023 May 2012 Attachment 48 to GNRO-2012/00039 - Er Reference-USDA 1976 (Franklin Line Permit) ML12157A4502012-05-23023 May 2012 Attachment 50 to GNRO-2012/00039 Enercon. 2011 B. Evaluation of Potential Air Emissions from Coal and Natural Gas Fired ML12157A4512012-05-23023 May 2012 Attachment 51 to GNRO-2012/00039 Ggns. 2004. Air Pollution Control Permit to Operate Air Emissions Equipment at a Synthetic Minor Source, Permit No. 0420-00023. June 1, 2004 ML12157A5502012-05-23023 May 2012 Attachment 42 to GNRO-2012/00039 - Decision Notice and Finding of No Significant Impact Utility Corridor Maintenance for Wildlife Habitat Enhancement and Associated Environmental Assessment (Provided in Attachment C on the Terrestrial Ecolo ML12157A4482012-05-23023 May 2012 Attachment 49 to GNRO-2012/00039 - Ggns. 2008g. Grand Gulf Nuclear Station (Ggns), Facility No. 0420-00023, Renewal of Existing Synthetic Minor Operating Permit No. 0420-00023, Correspondence GEXO-200810008. November 25, 2008 2024-04-22
[Table view] |
Text
Attachment 11 to GNRO-2012/00039 Attachment 11 to GNRO-2012/00039 Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit-Hydrology Patton -Attachment Q labeled"Thermal Monitoring Reports for Winter and Summer 2007" Attachment Q Thermal Monitoring Reports for Winter and Summer 2007 r7,/A\1 rlA\l r I 10 IN Q, ýOJIQý ORAC F\\ Q A 77A C MH RqA R H 7 1ýo-")IJ HonBgut l1w] Mppwh Vootr Wludý,sir n d R, P AT F 1.-wf I THERMAL MONITORING PROGRAM Part III, D, Item 3, Page 32 of 33, of the GGNS NPDES Permit requires measurements of Mississippi River receiving water temperatures, during periods of power generation when specified conditions occur. In addition, the permit standard conditions require monitoring during the winter of 2006/2007 and during the summer of 2007 with the results included with the application for permit re-issuance.Because implementing conditions did not otherwise occur, the measurements were performed once during the winter of 2006/2007 and once during the summer of 2007, as prescribed by the GGNS NPDES Permit. The Thermal Monitoring Data Sheets documenting these exercises are attached.
Please note in both instances there was no significant thermal influence on receiving waters.For your convenience a summary of the results is shown in the table below.UPSTREAM UPSTREAM DOWNSTREAM DOWNSTREAM SURFACE [CO] SUBMERGED[C-]
SURFACE[CO]
SUBMERGED[Cj is f5 [5 feet)Winter[November
-April] 13.0 13.0 13.0 13.0 Summer[May -October] 26.8 26.7 26.6 26.8 axAND GULF NUJCLEAR STATION ENVIRONMENTAL IN8TRUcrroN 08-8-09-4 Revision:
11 Attaciment III Page 6 of 6 TXMIU UMUTORM UURT VEZUL AMI311Q LT 5133 I. Date Performed I1. Upriver Temperature (Point 1)III. Discharge Outlet Temperature (Note I)IV. Barge Slip Outlet Temperature(Note 2)Surface 5 ft Surface 5 ft Surface 5 ft iiH 8/c 4, 13.60 C 13,0 9c 1'7.',V cc 11 c/Y. ý 6C V. Downriver Temperature (Point 7) Surface IC.O C (Receiving Water)5 tt (3,0 *c V1. Ambient Air Temperature le 4C VII. River Level at Vicksburg 2k &7 ft VIII. Outfall 001 Recorder Temperature ,C S MOTH: A. Any temperature measurement in RECEIVING WATER which is equal to or greater than UPRIVER TE]PERATUBRE
+2.80C must be reported to the Chemistry Superintendent.
B. Any temperature measurement in RECEIVING HATER which exceeds 32.2 0 C must be reported to the Chamistry Superintendent.
Prepared by ________________
&L___' 01gnature-tats Reviewed bySignature/Date (Note 1) If the S ft. sample is impractical, note location of measurement and N/A the 5 ft blank. (See Page 1, III. b)(Note 2) If subsurface measurement depth is leas than 5 ft. note the approximate depth on the data sheet (See Page 1, II. c)J: \ADMSRVS\TBCI PUN\RRVISION\8\13094 .DOC GamnD GULF NUCLZAR STATION MWJERONVUNTAL INSTRUCTION 08-8-03-4
.Revisioni 11 Attachment III Page 6 of 6-MUM G -DAM 8RAT I. Date Performed 1I. Upriver Temperature (Point 1)II. Discharge Outlet Temperature(Note 1)IV. Barge 81lp Outlet Temperature (Note 2)V. Downriver Temperature (Point 7)(Receiving Water)Surface 5 ft Surface 5 ft Surface 5 ft Surface 5 ft*C n.:t 9c 1q, -Ito ft Vt. Ambient Air Temperature VIZ. River Level at Vicksburg VZ11. Outfall 00C Recorder Temperature 3Um Ime OWTE h ýW.w 4&L6coAE -9iI NOT~r A. Any temperature measurement in RECEIVINM WATER which is equal to or greater than UFRIVMR TEMPERATURJ
+2.3 C muest be reported to the Chemistry Superintendent.
B. Any temperature measurement in RMMXVING WATER Which 32.2eC must be reported to the Chemistry Superintendent.
Prepared by #gaueot 4/J0 V Signature/Date (Note 1) If the 3 ft. sample is impractical, note location of measurement and N/A the 5 ft blank. (See Page 1, III. b)(Note 2) If subsurface measurement depth is less than 5 ft. note the approximate depth on the data sheet (See Page 1, IIl. c)J: \ADt4_SRVS\TUCH PUU\RNVISION\B\85094 .DOC