ENS 57705

From kanterella
Jump to navigation Jump to search
ENS 57705 +/-
Where
Browns Ferry Tennessee Valley Authority icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000260/LER-2025-001
Reactor Scram Due to Low Electro-Hydraulic Control Pressure
05000260/LER-2025-001-01
Reactor Scram Due to Low Electro-Hydraulic Control Pressure
Time - Person (Reporting Time:+-0.37 h-0.0154 days <br />-0.0022 weeks <br />-5.06826e-4 months <br />)
Opened: Mark R. Moebes
18:31 May 12, 2025
NRC Officer: Josue Ramirez
Last Updated: May 12, 2025
57705 - NRC Website
Loading map...