ENS 57537
ENS Event | |
|---|---|
04:48 Feb 9, 2025 | |
| Title | Notification of Unusual Event Due to Smoke in Unit 3 Turbine Building |
| Event Description | The following information was provided by the licensee via phone and email:
On 2/8/2025, at 2248 CST, Browns Ferry Unit 3 experienced a main generator fault causing Unit 3 to experience an automatic reactor scram. Smoke was observed in multiple areas that required greater than 15 minutes to verify that no fire occurred. Browns Ferry declared a Notification of Unusual Event (NOUE), Emergency Action Level HU4, [at 2310] and completed the applicable notifications. The fault causing the main generator trip is still under investigation. A loss of power to the 3EA and 3EB 4KV shutdown boards resulted in a valid actuation of the 3A and 3B emergency diesel generators (EDGs) which successfully re-energized the boards as designed. During the scram response, there was a valid actuation of the primary containment isolation system (PCIS) groups 2, 3, 6, and 8. Upon receipt of these signals, all components actuated as required. Local offsite fire assistance was requested based on the initial indications but was not required. Operators responded and stabilized the plant. Units 1 and 2 were not affected. This event requires a 4-hour non-emergency report per 10 CFR 50.72(b)(2)(iv)(B), any event or condition that results in actuation of the reactor protection system (RPS) when the reactor is critical except when the actuation results from and is part of a pre-planned sequence during testing or reactor operation. This event requires a 4-hour non-emergency report per 10 CFR 50.72(b)(2)(xi), any event or situation, related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made. This event requires an 8-hour non-emergency report per 10 CFR 50.72(b)(3)(iv)(A), any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B): 1) reactor protection system (RPS) including: reactor scram or reactor trip, 2) general containment isolation signals affecting containment isolation valves in more than one system or multiple main steam isolation valves (MSIVs), 8) emergency AC electrical power systems, including: EDGs. All safety systems operated as expected. At no time was public health and safety at risk. The NRC Resident Inspector has been notified Notified DHS SWO, FEMA Operations Center, CISA Central, FEMA NWC, CWMD Watch Desk (email), DHS NRCC THD Desk (email), and DHS Nuclear SSA (email). The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: Browns Ferry Unit 3 intentions are to proceed to mode 4. Offsite power has been restored, and both the 3A and 3B EDGs have been secured. The NOUE was terminated on 2/9/2025, at 0110 CST.
Browns Ferry Nuclear Plant (BFN) is updating EN 57537 to retract the Notification of Unusual Event (NOUE), emergency action level (EAL) HU4, at 0028 EST on February 9, 2025, based on the following additional information. In accordance with the emergency preparedness implementing procedures, BFN reported a condition that was determined to meet EAL HU4, initiating criteria number 1. These criteria, in part, applies if a fire is not extinguished within 15 minutes of a report from the field and the fire was within any table H2 plant area. The field report of heavy smoke was received at 2256 CST, and the NOUE was declared 14 minutes later at 2310 CST in anticipation of exceeding the 15-minute time requirement of HU4. Upon entry by the site fire brigade, it was determined that no fire existed and was reported to the shift manager at 2311 CST which was 15 minutes after the first report of smoke was received. The basis for retraction of the initial emergency notification is that this event did not meet the definition of a fire, and the lack thereof was confirmed within 15 minutes. The NOUE had been conservatively declared based on the amount of smoke observed at the time from an unknown source; however, a fire was not identified through any fire alarm or observation of flame or heat. Additionally, the report that no fire existed was received within 15 minutes of the smoke report but after the NOUE was declared. The remaining events that were reported in EN 57537 as a 4-hour non-emergency report in accordance with 10 CFR 50.72(b)(2)(iv)(B) as an actuation of the reactor protection system (RPS) when the reactor is critical, a 4-hour nonemergency report per 10 CFR 50.72(b)(2)(xi), any event or situation, related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has been or will be made, an 8-hour non-emergency report per 10 CFR 50.72(b)(3)(iv)(A), any event or condition that results in valid actuation of any of the systems listed in paragraph (b)(3)(iv)(B): 1) reactor protection system (RPS) including: reactor scram or reactor trip, 2) general containment isolation signals affecting containment isolation valves in more than one system or multiple main steam isolation valves (MSIVs), 8) emergency AC electrical power systems, including: EDGs, are still applicable and require no additional update at this time. Notified R2DO (Penmetsa) |
| Where | |
|---|---|
| Browns Ferry Alabama (NRC Region 2) | |
| Reporting | |
| Emergency class: | Unusual Event |
| 10 CFR 50.72(a) (1) (i), Emergency Class Declaration 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
| Time - Person (Reporting Time:+-4.33 h-0.18 days <br />-0.0258 weeks <br />-0.00593 months <br />) | |
| Opened: | Eric Steel 00:28 Feb 9, 2025 |
| NRC Officer: | Ernest West |
| Last Updated: | Feb 13, 2025 |
| 57537 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 57537\u003C/a\u003E - \u003Ca href=\"/Browns_Ferry\" title=\"Browns Ferry\"\u003EBrowns Ferry\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ENotification of Unusual Event Due to Smoke in Unit 3 Turbine Building\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 57537 - Browns Ferry\n","link":"","lat":34.70418333333333,"lon":-87.11844722222222,"icon":"/w/images/c/ce/Tennessee_Valley_Authority_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
Unit 2 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (89 %) |
| After | Power Operation (89 %) |
Unit 3 | |
|---|---|
| Reactor critical | Critical |
| Scram | A/R |
| Before | Power Operation (67 %) |
| After | Hot Shutdown (0 %) |
Browns Ferry | |
WEEKMONTHYEARENS 578472025-08-02T04:50:0002 August 2025 04:50:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram ENS 577372025-05-31T03:47:00031 May 2025 03:47:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip ENS 577052025-05-12T18:53:00012 May 2025 18:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 575372025-02-09T04:48:0009 February 2025 04:48:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Notification of Unusual Event Due to Smoke in Unit 3 Turbine Building ENS 572982024-08-30T15:51:00030 August 2024 15:51:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation - Automatic Start of Diesel Generators ENS 570902024-04-25T03:15:00025 April 2024 03:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram with Eccs Actuation ENS 569902024-02-24T08:19:00024 February 2024 08:19:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Start of Emergency Diesel Generator ENS 569412024-02-01T18:17:0001 February 2024 18:17:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification - Workplace Injury ENS 565312023-05-20T08:15:00020 May 2023 08:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram ENS 563852023-03-02T19:12:0002 March 2023 19:12:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification ENS 558182022-04-02T18:45:0002 April 2022 18:45:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to a Fire at the 3B Reactor Feedwater Pump ENS 547952020-07-21T09:35:00021 July 2020 09:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Biofouling of Intake Structure Leads to Manual Reactor Scram of Unit 1 ENS 547942020-07-20T18:25:00020 July 2020 18:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Biofouling of Intake Structure Leads to Manual Reactor Scram of Unit 2 and Downpower of Units 1 & 3 ENS 545592020-03-03T10:16:0003 March 2020 10:16:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator Actuation ENS 543022019-10-01T08:07:0001 October 2019 08:07:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram During Reactor Startup ENS 539222019-03-10T05:12:00010 March 2019 05:12:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notice of Unusual Event Due to Loss of Offsite Power ENS 539232019-03-10T04:59:00010 March 2019 04:59:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Scram Resulting in Rps and Eccs Actuation ENS 539182019-03-08T17:13:0008 March 2019 17:13:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification for Oil Spill Into U.S. Waters ENS 535582018-08-22T05:00:00022 August 2018 05:00:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event Declared Due to Fire ENS 534622018-06-20T05:00:00020 June 2018 05:00:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event Declared Due to Toxic Gas Release ENS 532692018-03-18T16:58:00018 March 2018 16:58:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Turbine Control Valve Closure ENS 532472018-03-07T17:05:0007 March 2018 17:05:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event Declared ENS 531622018-01-10T15:28:00010 January 2018 15:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Turbine Control Valve Fast Closure Scram Signal ENS 526482017-03-29T23:44:00029 March 2017 23:44:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Scram Initiated During Startup ENS 525872017-03-02T18:30:0002 March 2017 18:30:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event Declared ENS 520252016-06-17T17:22:00017 June 2016 17:22:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Elevated Tritium Detected Onsite ENS 518782016-04-22T18:59:00022 April 2016 18:59:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Partial Loss of Power Experienced During Electrical Bus Transfer ENS 518502016-04-06T20:45:0006 April 2016 20:45:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Main Steamline High High Radiation Condition ENS 515712015-11-29T22:00:00029 November 2015 22:00:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Small Oil Spill ENS 513332015-08-20T15:32:00020 August 2015 15:32:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Start of an Emergency Diesel Generator on Low Bus Voltage ENS 507252015-01-08T22:26:0008 January 2015 22:26:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Low Level Tritium Spill ENS 507192015-01-06T18:27:0006 January 2015 18:27:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Oil Leak ENS 505822014-10-30T16:00:00030 October 2014 16:00:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification and Press Release Regarding Boone Dam Stability Issues ENS 504042014-08-26T22:30:00026 August 2014 22:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Turbine Generator Neutral Overvoltage Causes a Reactor Scram ENS 502772014-07-13T22:40:00013 July 2014 22:40:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification of a One Gallon Diesel Fuel Oil Spill ENS 502222014-06-23T20:40:00023 June 2014 20:40:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Reportable Small Oil Spill Into U.S. Waters ENS 500902014-05-06T13:30:0006 May 2014 13:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Low Reactor Water Level During Instrument Testing ENS 499282014-03-19T03:52:00019 March 2014 03:52:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Due to Failure to Control Main Turbine Moisture Separator Level ENS 488292013-03-19T09:02:00019 March 2013 09:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Lowering Condenser Vacuum ENS 487822013-02-25T19:13:00025 February 2013 19:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Automatic Scram Due to a Turbine Trip from a Loss of Condenser Vacuum ENS 489042013-02-11T11:13:00011 February 2013 11:13:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Initiation of Reactor Core Isolation Cooling System ENS 486232012-12-22T17:52:00022 December 2012 17:52:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Loss of Power to the Reactor Protection System ENS 479722012-05-29T08:31:00029 May 2012 08:31:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Main Generator Load Reject Signal ENS 479552012-05-24T11:39:00024 May 2012 11:39:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram During Startup ENS 479422012-05-22T07:49:00022 May 2012 07:49:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Scram Due to Reactor Protection System Being De-Energized ENS 472992011-09-28T09:14:00028 September 2011 09:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to a Turbine Trip ENS 471302011-08-06T11:17:0006 August 2011 11:17:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Initiation of Technical Specification Required Shutdown ENS 468722011-05-22T22:37:00022 May 2011 22:37:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Reactor Protection System (Rps) Actuation Signal - Scram Discharge Volume (Sdv) High Water Level ENS 468052011-05-02T11:26:0002 May 2011 11:26:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation Due to a Emergency Diesel Generator Output Breaker Trip ENS 468012011-04-29T04:38:00029 April 2011 04:38:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Primary Containment Isolation System Actuation Due to Loss of Power from a Diesel Generator ENS 467932011-04-27T22:01:00027 April 2011 22:01:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Notification of Unusual Event Due to Loss of Offsite Power ENS 465112010-12-26T22:20:00026 December 2010 22:20:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to High Vibration on Main Generator Exciter ENS 461792010-08-16T18:40:00016 August 2010 18:40:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Npdes Limit Was Exceeded for River Temperature Discharge Requirements ENS 459902010-06-09T08:31:0009 June 2010 08:31:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Due to Closure of Main Steam Isolation Valves ENS 459502010-05-24T20:20:00024 May 2010 20:20:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification - Oil Sheen at Intake Forebay ENS 458882010-04-30T21:48:00030 April 2010 21:48:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Light Socket Short Causes Isolation Systems to Actuate ENS 458202010-04-07T21:10:0007 April 2010 21:10:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Spill of Water Containing Tritium ENS 453912009-09-30T04:23:00030 September 2009 04:23:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Unit 2 Manually Scrammed After Trip of an Operating Condensate Pump and Rapidly Lowering Rvwl ENS 452902009-08-24T23:50:00024 August 2009 23:50:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Condensate Booster Pump Trip Resulting in a Manual Reactor Scram ENS 448602009-02-18T09:51:00018 February 2009 09:51:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Turbine Trip Due to Power Load Unbalance Signal on Main Generator Resulting in Reactor Scram ENS 448542009-02-16T11:13:00016 February 2009 11:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Loss of Stator Cooling Water ENS 445402008-10-05T03:08:0005 October 2008 03:08:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Following Reverse Power Signal on Main Generator ENS 443672008-07-27T08:40:00027 July 2008 08:40:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Cable Tray Fire Near Cooling Tower "C" Switchgear ENS 442442008-05-28T21:30:00028 May 2008 21:30:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Transportation Accident Involving a Radioactive Material Shipment ENS 441872008-05-05T08:32:0005 May 2008 08:32:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Loss of Power to Esf Buses During Transfer of Offsite Power Source ENS 438932008-01-10T22:00:00010 January 2008 22:00:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Inadvertent Actuation of Offsite Emergency Siren ENS 438912008-01-10T18:21:00010 January 2008 18:21:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification - Spill of Water Containing Tritium ENS 438782008-01-01T03:40:0001 January 2008 03:40:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 3 Automatic Scram Due to Main Generator Load Reject Signal ENS 437182007-10-12T13:02:00012 October 2007 13:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Turbine Trip ENS 436642007-09-26T11:50:00026 September 2007 11:50:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Oil Sheen in Forebay Area That Is Not from Bfn ENS 436132007-09-03T07:14:0003 September 2007 07:14:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Electro-Hydraulic Control (Ehc) System Leak ENS 435682007-08-15T13:38:00015 August 2007 13:38:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Notification to State Due to Contaminated Material Discovered in Free Release Scrap Material ENS 435602007-08-11T22:51:00011 August 2007 22:51:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Scram Due to Neutron Monitoring Trip Signal ENS 435382007-07-31T14:30:00031 July 2007 14:30:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Due to Small Hydraulic Fluid Spill in Intake Bay ENS 434142007-06-09T16:00:0009 June 2007 16:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due Turbine Trip as a Result of High Moisture Separator Reheater Tank Level ENS 433812007-05-24T07:11:00024 May 2007 07:11:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Electro-Hydraulic Control (Ehc) System Leak ENS 431592007-02-09T18:08:0009 February 2007 18:08:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Reactor Scram Due to Low Reactor Water Level ENS 430922007-01-11T14:16:00011 January 2007 14:16:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram When Turbine Output Breakers Opened ENS 429892006-11-07T21:26:0007 November 2006 21:26:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Actuation of an Offsite Emergency Siren ENS 428132006-08-30T03:25:00030 August 2006 03:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Due to Electro-Hydraulic Oil Leak ENS 427872006-08-19T16:05:00019 August 2006 16:05:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram of Unit 3 Due to the Loss of Both Reactor Recirculation Pumps ENS 421022005-10-31T19:18:00031 October 2005 19:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Trip of Main Turbine ENS 420322005-10-01T15:59:0001 October 2005 15:59:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification Concerning an Industrial Accident ENS 419972005-09-17T16:29:00017 September 2005 16:29:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Due to Maintenance ENS 418962005-08-05T22:08:0005 August 2005 22:08:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Rps Actuation Due to Low Reactor Water Level Caused by Loss of Reactor Feed Pumps ENS 415952005-04-13T15:53:00013 April 2005 15:53:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Rps Actuation Due to an Invalid Atws Logic Actuation ENS 414042005-02-11T22:29:00011 February 2005 22:29:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to a Load Rejection ENS 412192004-11-23T16:02:00023 November 2004 16:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to Turbine Trip ENS 408622004-07-11T03:35:00011 July 2004 03:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Scram Due to an Upscale Trip on Intermediate Range Monitors ENS 408582004-07-09T03:32:0009 July 2004 03:32:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Scram Due to a Turbine Generator Load Rejection Signal ENS 408282004-06-18T17:04:00018 June 2004 17:04:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release Offsite Notification - Employee Fatality 2025-08-02T04:50:00 | |