MONTHYEARML20217G6441999-10-13013 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2.Non-proprietary & Proprietary TS & Info Encl.Proprietary Encl Withheld ML20217B1121999-10-0404 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,to Revise TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 ML20212F3521999-09-22022 September 1999 Supplemental Application for Amend to Licenses NPF-68 & NPF-81,proposing Change to SR 3.8.1.13 to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5441999-08-30030 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,proposing to Raise Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7211999-08-26026 August 1999 Rev to 990413 Application for Amend to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 to Be IAW Versions of LCO 3.0.4 & SR 3.0.4 as They Appear in Rev 1 to NUREG-1431 ML20211E9031999-08-24024 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3111999-05-18018 May 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SRs 3.8.1.3 & 3.8.1.13 to Reduce Loading Requirements for DGs ML20206D6831999-04-28028 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,changing Licensing Basis from Present Requirement to Establish Containment Hydrogen Monitoring within 30 Minutes of Initiation of Safety Injection to within 90 Minutes of LOCA ML20205S3731999-04-19019 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS ML20205Q7781999-04-13013 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 That Appear in Existing TS to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as in Rev 1 to NUREG-1431 ML20154M9911998-10-15015 October 1998 Application for Amends to Licenses NPF-68 & NPF-81,deleting or Modifying Existing License Conditions Which Have Been Completed or Are No Longer in Effect ML20151U1931998-09-0303 September 1998 Application for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Short Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys.Ts Pages Encl ML20236R4631998-07-13013 July 1998 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protection Channels ML20236F1541998-06-26026 June 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20247K4891998-05-15015 May 1998 Suppl Application for Amend to Licenses NPF-78 & NPF-81 Ts. Amend Will Revise New Program 5.5.18 to Extent That Items B,C & D Ref to LCO Action Statement & Revises Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9371998-05-0808 May 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 5.5.7, RCP Flywheel Insp Program, by Specifying Alternate Flywheel Insp Once Every Ten Years ML20199A4041998-01-22022 January 1998 Application for Amends to Licenses NPF-68 & NPF-81,adding Conditions for DGs for Extended DG Completion Time of Fourteen Days ML20199G3721997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes That Would Facilitate Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20199J6591997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Change Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20217H8981997-08-0808 August 1997 Revised Application for Amends to Licenses NPF-68 & NPF-81, Revising TS Re Credit for Boron & Enrichment Increase for Fuel Storage ML20141A8121997-06-13013 June 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.4.10, Pressurizer Safety Valves, to Reduce Nominal Set Pressure by 1% to 2460 Psig & Increase Tolerance to +2% ML20128G9881996-10-0404 October 1996 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20117N6401996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81,changing TS Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20117N6311996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81, Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20101D4081996-03-0505 March 1996 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing TS to Improve for Westinghouse Plants as Represented by NUREG-1431 ML20094N3821995-11-20020 November 1995 Rev to 950501 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Convert Existing TS to Format & Content of NUREG-1431,Westinghouse Improved STS ML20093K2021995-10-16016 October 1995 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J ML20098A4801995-09-22022 September 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 ML20083M0551995-05-12012 May 1995 Application for Amend to License NPF-68,changing TS SR 4.6.1.2 to Support one-time Exemption from Section III.D.1(a) of 10CFR50,App J,Extending Interval for Type a Test from Scheduled 36 Months to Approx 54 Months ML20082T5591995-05-0101 May 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting TSs to Improved TSs for Westinghouse Plants as Represented in NUREG-1431 ML20081J4901995-03-17017 March 1995 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3.9.4 Re Containment Bldg Penetrations,To Allow Personnel Airlock to Be Open During Core Alterations or Movement of Irradiated Fuel within Containment ML20080F7781995-01-20020 January 1995 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 6.4.2 Re Plant Review Board Composition ML20079B1961994-12-29029 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Requesting to Add Automatic Load Sequencer to Plant ML20079A9411994-12-27027 December 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Ts,By Revising Leak Test Frequency for Valves W/Resilient Seals ML20077F2131994-12-0606 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Containment Spray Additive Sys ML20073K3761994-10-0303 October 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS Reactor Pressure Limits as Results of New Analyses That Account for Nonconservatisms Identified in NRC Info Notice 93-058 & Results of RPV Surveillance Capsule Exams ML20073B7181994-09-13013 September 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing Elimination of Containment Spray Additive Sys ML20072F1981994-08-16016 August 1994 Application for Amend to License NPF-68,eliminating Article 2.C.(6) & Associated Attachment 1 of License Re Diesel Maint & Surveillance ML20072F2151994-08-16016 August 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3/4.7.1.1 & Bases Re Setpoint Tolerance for Main Steam Safety Valves ML20070A9841994-06-24024 June 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Values of Z & for Pressurizer Pressure Reactor Trip Instrumentation Trip Setpoints to Allow Use of Alternate Types of Pressure Transmitters ML20069C7271994-05-20020 May 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Heat Flux Channel Factor,Fq(Z),Penalty of 2 Percent in Spec 4.2.2.2.f to cycle-specific COLR to Allow for burnup-dependent Values of Penalty in Excess of 2% ML20070M6711994-04-28028 April 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 3/3.8.1.1, AC Sources Operating, Based on GL 93-05,RG 1.9 & NUMARC 87-00,Rev 1 ML20065F8631994-03-31031 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Revising TS 3/4.7.1.1 & Bases Re Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML20064L7341994-03-18018 March 1994 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes to Ts,Incorporating Technical Substance of Corresponding Spec (LCO 3.3.3) from NUREG-1431,Rev 0 ML20064C7181994-03-0101 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Reinstating Exception 3.0.4 for TS 3.2.4, Quadrant Power Tilt Ratio, ML20063E0591994-02-0303 February 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.7.10,area Temp Monitoring to Section 16.3 of FSAR ML20059D2381993-12-30030 December 1993 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Allow One Time Extension of AOT for RHR Pumps from 3 to 7 Days.One Time Extension Necessary to Allow Mods to RHR Sys While Plant in Mode 1 ML20058A9291993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,proposing Revs to TS Re Dc Sources,Including Rev of SRs of Paragraphs 4.8.2.1.e & F & Table 4.8-2, Battery Srs ML20058A9451993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Table 3.3-2,stating That ESFAS Not Required in Mode 2 When AFW Operating to Supply Sfs.Footnote Will Be Applied to Applicable Modes for Functional Unit 6.e ML20058H9971993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.3.4, Turbine Overspeed Protection to Section 16.3 of Fsar.Ge Proprietary Rept GET-8039 Encl.Proprietary Rept Withheld,Per 10CFR2.790 1999-09-22
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217G6441999-10-13013 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Permit Relaxation of Allowed Bypass Test Times & Completion Times for LCOs 3.3.1 & 3.3.2.Non-proprietary & Proprietary TS & Info Encl.Proprietary Encl Withheld ML20217B1121999-10-0404 October 1999 Application for Amends to Licenses NPF-68 & NPF-81,to Revise TS 5.5.6 Incorporating Exceptions to Reg Guide 1.35,rev 2,as Described in FSAR Section 3.8.1.7.2 ML20212F3521999-09-22022 September 1999 Supplemental Application for Amend to Licenses NPF-68 & NPF-81,proposing Change to SR 3.8.1.13 to Include Upper Limit for DG Loading for 2 H Portion of SR ML20211J5441999-08-30030 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,proposing to Raise Level of Approval Authority for Deviations from Guidelines Provided to Minimize Unit Staff Overtime Specified in TS 5.2.2 ML20211J7211999-08-26026 August 1999 Rev to 990413 Application for Amend to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 to Be IAW Versions of LCO 3.0.4 & SR 3.0.4 as They Appear in Rev 1 to NUREG-1431 ML20211E9031999-08-24024 August 1999 Application for Amends to Licenses NPF-68 & NPF-81,relaxing Slave Relay Test Frequency from Quarterly to Refueling Frequency ML20196L3111999-05-18018 May 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SRs 3.8.1.3 & 3.8.1.13 to Reduce Loading Requirements for DGs ML20206D6831999-04-28028 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,changing Licensing Basis from Present Requirement to Establish Containment Hydrogen Monitoring within 30 Minutes of Initiation of Safety Injection to within 90 Minutes of LOCA ML20205S3731999-04-19019 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,revising SR 3.3.5.2 & Associated Bases to Allow Loss of Voltage & Degraded Voltage Trip Setpoints to Be Treated as Nominal Values in Same Manner as Trip Setpoints for RTS & ESFAS ML20205Q7781999-04-13013 April 1999 Application for Amends to Licenses NPF-68 & NPF-81,updating Versions of LCO 3.0.4 & SR 3.0.4 That Appear in Existing TS to Be Consistent with Versions of LCO 3.0.4 & SR 3.0.4 as in Rev 1 to NUREG-1431 ML20154M9911998-10-15015 October 1998 Application for Amends to Licenses NPF-68 & NPF-81,deleting or Modifying Existing License Conditions Which Have Been Completed or Are No Longer in Effect ML20151U1931998-09-0303 September 1998 Application for Amends to Licenses NPF-68 & NPF-81,changing TS to Support Replacement of Nuclear Instrumentation Sys Short Range & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys.Ts Pages Encl ML20236R4631998-07-13013 July 1998 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Selected Protection Channels ML20236F1541998-06-26026 June 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.3.6 Re CVI Instrumentation & LCO 3.9.4 Re Containment Penetrations to Facilitate Outage Planning ML20247K4891998-05-15015 May 1998 Suppl Application for Amend to Licenses NPF-78 & NPF-81 Ts. Amend Will Revise New Program 5.5.18 to Extent That Items B,C & D Ref to LCO Action Statement & Revises Bases Insert for New Required Actions B.5.1 & B.5.2 ML20247G9371998-05-0808 May 1998 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 5.5.7, RCP Flywheel Insp Program, by Specifying Alternate Flywheel Insp Once Every Ten Years ML20199A4041998-01-22022 January 1998 Application for Amends to Licenses NPF-68 & NPF-81,adding Conditions for DGs for Extended DG Completion Time of Fourteen Days ML20199J6591997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Change Capacity of Unit 1 Spent Fuel Storage Pool from 288 to 1476 Assemblies & Design Features Description to Reflect Criticality Analyses & Storage Cell Spacing ML20199G3721997-11-20020 November 1997 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes That Would Facilitate Treatment of Trip Setpoints as Nominal Values & Correct Certain Typos ML20217H8981997-08-0808 August 1997 Revised Application for Amends to Licenses NPF-68 & NPF-81, Revising TS Re Credit for Boron & Enrichment Increase for Fuel Storage ML20141A8121997-06-13013 June 1997 Application for Amends to Licenses NPF-68 & NPF-81,revising TS LCO 3.4.10, Pressurizer Safety Valves, to Reduce Nominal Set Pressure by 1% to 2460 Psig & Increase Tolerance to +2% ML20128G9881996-10-0404 October 1996 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20117N6401996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81,changing TS Section 5.3.1,allowing Use of Fuel Assemblies Containing Fuel Rods Clad W/Zirlo ML20117N6311996-06-17017 June 1996 Application for Amends to Licenses NPF-68 & NPF-81, Clarifying Requirements of TS SR 4.8.1.1.2.j (2) That Prescribes Pressure Test of Portions of Diesel fuel-oil Sys Designed to Section Iii,Subsection Nd of ASME Code ML20101D4081996-03-0505 March 1996 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing TS to Improve for Westinghouse Plants as Represented by NUREG-1431 ML20094N3821995-11-20020 November 1995 Rev to 950501 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Convert Existing TS to Format & Content of NUREG-1431,Westinghouse Improved STS ML20093K2021995-10-16016 October 1995 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Spec 4.6.1.2.d Stating That Type B & C Tests Scheduled for Refueling Outage 1R6 Will Be Conducted Per Option B of 10CFR50 App J ML20098A4801995-09-22022 September 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting Existing VEGP TS Requirements to Format & Content of NUREG-1431 ML20083M0551995-05-12012 May 1995 Application for Amend to License NPF-68,changing TS SR 4.6.1.2 to Support one-time Exemption from Section III.D.1(a) of 10CFR50,App J,Extending Interval for Type a Test from Scheduled 36 Months to Approx 54 Months ML20082T5591995-05-0101 May 1995 Application for Amends to Licenses NPF-68 & NPF-81, Converting TSs to Improved TSs for Westinghouse Plants as Represented in NUREG-1431 ML20081J4901995-03-17017 March 1995 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3.9.4 Re Containment Bldg Penetrations,To Allow Personnel Airlock to Be Open During Core Alterations or Movement of Irradiated Fuel within Containment ML20080F7781995-01-20020 January 1995 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 6.4.2 Re Plant Review Board Composition ML20079B1961994-12-29029 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Requesting to Add Automatic Load Sequencer to Plant ML20079A9411994-12-27027 December 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Ts,By Revising Leak Test Frequency for Valves W/Resilient Seals ML20077F2131994-12-0606 December 1994 Application for Amends to Licenses NPF-68 & NPF-81, Eliminating Containment Spray Additive Sys ML20073K3761994-10-0303 October 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS Reactor Pressure Limits as Results of New Analyses That Account for Nonconservatisms Identified in NRC Info Notice 93-058 & Results of RPV Surveillance Capsule Exams ML20073B7181994-09-13013 September 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing Elimination of Containment Spray Additive Sys ML20072F1981994-08-16016 August 1994 Application for Amend to License NPF-68,eliminating Article 2.C.(6) & Associated Attachment 1 of License Re Diesel Maint & Surveillance ML20072F2151994-08-16016 August 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising TS 3/4.7.1.1 & Bases Re Setpoint Tolerance for Main Steam Safety Valves ML20070A9841994-06-24024 June 1994 Application for Amends to Licenses NPF-68 & NPF-81,revising Values of Z & for Pressurizer Pressure Reactor Trip Instrumentation Trip Setpoints to Allow Use of Alternate Types of Pressure Transmitters ML20069C7271994-05-20020 May 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Heat Flux Channel Factor,Fq(Z),Penalty of 2 Percent in Spec 4.2.2.2.f to cycle-specific COLR to Allow for burnup-dependent Values of Penalty in Excess of 2% ML20070M6711994-04-28028 April 1994 Application for Amends to Licenses NPF-68 & NPF-81,changing TS 3/3.8.1.1, AC Sources Operating, Based on GL 93-05,RG 1.9 & NUMARC 87-00,Rev 1 ML20065F8631994-03-31031 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Revising TS 3/4.7.1.1 & Bases Re Max Allowed Reactor Thermal Power Operation W/Inoperable Main Steam Safety Valves ML20064L7341994-03-18018 March 1994 Application for Amends to Licenses NPF-68 & NPF-81,proposing Changes to Ts,Incorporating Technical Substance of Corresponding Spec (LCO 3.3.3) from NUREG-1431,Rev 0 ML20064C7181994-03-0101 March 1994 Application for Amends to Licenses NPF-68 & NPF-81, Reinstating Exception 3.0.4 for TS 3.2.4, Quadrant Power Tilt Ratio, ML20063E0591994-02-0303 February 1994 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.7.10,area Temp Monitoring to Section 16.3 of FSAR ML20059D2381993-12-30030 December 1993 Application for Amends to Licenses NPF-68 & NPF-81,revising TS to Allow One Time Extension of AOT for RHR Pumps from 3 to 7 Days.One Time Extension Necessary to Allow Mods to RHR Sys While Plant in Mode 1 ML20058A9451993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,adding Footnote to Table 3.3-2,stating That ESFAS Not Required in Mode 2 When AFW Operating to Supply Sfs.Footnote Will Be Applied to Applicable Modes for Functional Unit 6.e ML20058A9291993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81,proposing Revs to TS Re Dc Sources,Including Rev of SRs of Paragraphs 4.8.2.1.e & F & Table 4.8-2, Battery Srs ML20058H9971993-11-19019 November 1993 Application for Amends to Licenses NPF-68 & NPF-81, Relocating Requirements of TS 3/4.3.4, Turbine Overspeed Protection to Section 16.3 of Fsar.Ge Proprietary Rept GET-8039 Encl.Proprietary Rept Withheld,Per 10CFR2.790 1999-09-22
[Table view] |
Text
_ _ . _ -_ . _ _
Geos95 Pust Company 333 PMimOni AMLe
-e- ,
e
- . Ay;g Gyug a 3g,33 1 leruno 404 f;M OE unn s ,
40 D + Ot$$ CU3tOf b b*.3/
~
l Pcd 04 ;e b 129S j ne upyr _ A%amn 35?ot
'> r ann M 869 SW j November 29, 1990 7., , ,
W G Hairston, m
[jjp]E[ ELV-02166 Docket Nos. 50-424 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk-Washington, D.C. 20555 Gentlemen:
V0GTLE ELECTRIC GENERATING PLANT REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES I VANTAGE-5 FUEL DESIGN l
l In accordance with the provisions of 10 CFR 50.90 and 10 CFR n.59, Georgia Power Company (GPC) proposes to amend the Vogtle Electric Generating Plant (VEGP) Units 1 and 2 Technical Specifications Appendix A to Operating Licenses NPF-68 and NPF-01. The Technical Specifications for which this change is requested allow the use of reload fuel assemblies of the Westinghouse VANTAGE-5 design. Currently, VEGP Units 1 and 2 utilize the Westinghouse LOPAR fuel design for core reloads.
In order to implement a long-term fuel management strategy planned by GPC for the VEGP Units 1 and 2, it has been decided to use fresh VANTAGE-5 fuel assemblies in each reload until a full core loading of VANTAGE-5 fuel--is achieved. This long-term strategy includes the implementation of high energy 18-month fuel cycles with high capacity factors and low leakage loading patterns, and extending discharged fuel burnup to support lead-rod burnups of 60,000 MWO/MTV. In addition, GPC plans to request a revision to the licensed power level for VEGP Units 1 and 2 from 3411 MWt to 3565 MWt in the near future; however, the Technical Specifications changes- for power l rerate are not being. pursued in this licensing amendment request. The-l- VANTAGE-5 fuel-related Technical Specifications changes are summarized in Enclosure 1 and the changes are provided in Enclosure 3.
u The Westinghouse VANTAGE-5 fuel design provides the operating characteristics (by inclusion of specific design features and by use of
,- improved methodologies'previously reviewed by the NRC) required to implement GPC's long-term fuel management strategy. The VANTAGE-5 fuel design features include smaller diameter (0FA) fuel rods, mid-span zircaloy grids, the Intermediate Flow Mixer grids, natural uranium oxide axial blankets, Integral Fuel Burnable Absorbers, extended fuel burnup, and Reconstitutable Top Nozzles. The new computer code methodologies relative to the current VEGP safety analyses used in the VEGP VANTAGE-5 safety analyses include BART/ BASH (large-break LOCA), NOTRUMP (small-break- LOCA),
and the improved 'THINC-IV-(thermal-hydraulics) computer codes, as well as
! 9012130150 901129 ADOCK 05000424 IbIT$d h [$[. I I PDR P PDC hI
I Georgia Power a U.S. Nuclear Regulatory Commission ELV-02166 Page 2 the Revised Thermal Design Procedure, the WRB-2 DNB correlation, and the Relaxed Axial Offset Control strategy. Both the fuel design features and methodologies support the safe, efficient fuel management scheme planned for the VEGP Units 1 and 2. The real margin provided by the VANTAGE-5 fuel design and VEGP change in methodologies was used to support revised core design parameters that will provide increased operational flexibility and meet the GPC core design fuel management strategy.
The safety analyses (Enclosure 4) supporting the VANTAGE-5 fuel design and the proposed Technical Specifications changes ir.clude conservatisms to allow for future revisions to the Technical Specifications. These conservatisms include operational margin for power rerating from 3411 to 3565 MWt, additional increased peaking factors, steam generator tube plugging up to ten percent, removal of the Resistance Temperature Detector bypass loops, and a reduction in ther.nal design flow. The NSSS design parameters to which the safety analvses have been performed in support of VANTAGE-5 fuel have been generated to account for these future changes.
Enclosure 1 provides a brief description of the proposed changes and the bases for the changes.
Enclosure 2 provides the basis for a determination that the proposed changes do not involve significant hazards considerations.
Enclosure 3 provides instructions for incorporating the proposed changes into the Technical Specifications. Since VEGP uses combined Units 1 and 2 Technical Specifications, the instructions for incorporating the proposed changes for each unit will be done in two phases. The first phase is the proposed Technical Specifications changes involving Vogtle 1 Cycle 4's first fuel loading of the VANTAGE-5 fuel design expected in late September 1991. Attachments la and Ib of Enclosure 3 contain the marked-up and typed changes, respectively, to be incorporded following Vogtle 1 Cycle 3 shutdown. At this point in time, the Technical Specifications changes only apply to VEGP Unit 1, while VEGP Unit 2 will continue to operate with the existing Technical Specifications until its initial loading of VANTAGE-5 fuel (about February 1992). In the second phase (Attachments 2a and 2b of Enclosure 3), Technical Specifications changes are proposed to allow Vogtle 2 Cycle 3's first fuel loading of the VANTAGE-5 fuel design expected in February 1992. Therefore, the second phase fully implements the VANTAGE-5 Technical Specifications changes for both VEGP Units 1 and 2. In summary, Phase 1 (Attachments la and Ib of Enclosure 3) revises the Technical Specifications to apply the VANTAGE-5 changes to VEGP Unit 1 only without affecting the current Technical Specifications applicable to VEGP Unit 2 operation. Phase 2 revises the Technical Specifications (Attachments 2a and 2b of Enclosure 3) to apply the VANTAGE-5 changes to both VEGP Units 1 and 2. Enclosure 3 contains the changes necessary to incorporate both Phases 1 and 2.
beOf la, Power b -
U.S. Nuclear Regulatory Commission
- ELV-02166 Page 3 Enclosure 4 provides details of the safety evaluations / analyses performed to support the transition to a full core of VANTAGE-5 fuel for both VEGP Units 1 and 2. Enclosure 4 also includes Appendices A, B, and C which-contain the detailed supporting non-LOCA, LOCA, steam generator tube rupture, and radiological assessment analyses / evaluations performed for the VANTAGE-5 fuel design.
Enclosure 5 provides an environmental evaluation to support the use of
' VANTAGE-5.and LOPAR fuel to lead rod burnups of 60,000 MWD /MTV.
GPC requests a review of this licensing amendment request on a schedule to support the first reload of VANTAGE-5 fuel for VEGP Units 1 and 2 scheduled for late September 1991.
- In accordance with 10 CFR 50.91, the designated state official will be sent a copy of this letter and the enclosures.
Mr. W. G. Hairston, III, states that he is a Senior Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company and that, to the best of his knowledge and: belief, the facts set forth in this letter and enclosures are true.
GEORGIA POWER COMPANY By: _id. .
W. G. Hairston, III Sworn to-and subscribed before me this day of '/)/qU n t fue ,
1990.
N- (A w s t ?/ (d) L hccmu S "s k b O?2 ,
Enclosures
- 1. Basis for Proposed Change
- 2. 10 CFR 50.92 Evaluation
- 3. Instructions for Incorporation
- 4. Safety Evaluation Report
- 5. Environmental Evaluation WGH,III:BCA/ gps Distribution Attached
__--_--m- g
c,corgiapower 1-l U.S. Nucler Regulatory Commission ELV-02166 Page 4 cc w/ enclosures:
Georaia Power Company Southern Company Servient Mr. C. K. McCoy Mr. L. B. Long Mr. W. B. Shipman Mr. P. D. Rushton Mr. R. M. Odom NORMS U.S. Nuclear Reaulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle State of Georaia tir. L. C. Barrett, Commissioner, Department of Natural Resources