DCL-05-107, Response to NRC Regulatory Issue Summary 2005-19; Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from DCL-05-107)
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2005-19; Preparation and Scheduling of Operator Licensing Examinations
ML052690132
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/16/2005
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-05-107, RIS-05-019
Download: ML052690132 (2)


Text

Pacific Gas and ElectricCompany' James R.Becker Diablo Canyon Power Plant Vice President P.0. Box 56 Diablo Canyon Operations and Avila Beach, CA 93424 Station Director 805.545.3462 September 16, 2005 Fax: 805.545.4234 PG&E Letter DCL-05-107 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2005-19: Preparation and Scheduling of Onerator Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2005-19, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.

If you have further questions, please contact David L. Burns, Operations Training Leader, at (805) 545-3173.

Sincerely, fames R. Becker elm/4509 Enclosure cc: David L. Burns Terry W. Jackson Bruce S. Mallett Girija S. Shukla A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Cattaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 08131/2008

8-2005) Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operatornexaminations. Send comments regrding burden OPERATOR LICENSING OPEAT R ICNSNGNudear estimate to the Records and FOAIAPrivacy Services Branch -5 F53). U.S ReuaoyComsin Washington, DC 20555.0001, orbfotee EXAMINATIONil EXAMI NATI ON DATADATAnoclo~lcts~nrc.gov, and to the Desk Officer. Office of Inrmln and Regulatory Affairs, NEO1802O2Z (3150-0131), Office of Manalement and Budget, Washington, DC 20503. If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to. the Information collec0on.

FACtLuTY NRC REGION Diablo Canyon Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2006 CY2007 CY2008 CY2009 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2006 Cw007 CW008 CW009 NUMBER OF REACTOR 0 10 6 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 4 8 0 NUMBER OF SENIOR REACTOR OPERATORS- UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 315107 & 3/12107 11//08 & 11/10/08 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2006 CY 2007 PROPOSED . .

NUMBER MARCH JUNE SEPTEMBE DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBEROF 0 0 0 1 0 0 0 14 0 CANDIDATES NRC FORM 53 (8-2005) PRINTED ON RECYCLED PAPER