E910-05-003, Experimental Corporation Final Status Survey Report for OL6 and OL10
ML052010667 | |
Person / Time | |
---|---|
Site: | Saxton File:GPU Nuclear icon.png |
Issue date: | 07/14/2005 |
From: | Kuehn G GPU Nuclear Corp |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
E910-05-003 | |
Download: ML052010667 (1) | |
Similar Documents at Saxton | |
---|---|
Category:Letter type:E
MONTHYEARE910-06-003, Experimental Corporation, Cancellation of Quality Assurance Program for Radioactive Material Packages No. 09012006-03-13013 March 2006
[Table view]Experimental Corporation, Cancellation of Quality Assurance Program for Radioactive Material Packages No. 0901 E910-06-002, Experimental Corporation Indemnity Agreement2006-01-16016 January 2006 Experimental Corporation Indemnity Agreement E910-05-068, Experimental Corporation, Response to Additional Comments on Snec Final Status Survey Reports2005-09-29029 September 2005 Experimental Corporation, Response to Additional Comments on Snec Final Status Survey Reports E910-03-035, Experimental Corporation (Snec) FSS Report for Cv Interior, 774' Elev and Below, Revision 1, Erratum2005-09-17017 September 2005 Experimental Corporation (Snec) FSS Report for Cv Interior, 774' Elev and Below, Revision 1, Erratum E910-05-061, Records Required to Be Forwarded to NRC Region 1 Office Prior to Termination of the Saxton Nuclear Experimental Corporation Plant License2005-09-15015 September 2005 Records Required to Be Forwarded to NRC Region 1 Office Prior to Termination of the Saxton Nuclear Experimental Corporation Plant License E910-05-060, Experimental Corporation (Snec) Application for Termination of License2005-09-15015 September 2005 Experimental Corporation (Snec) Application for Termination of License E910-05-064, Experimental Corporation 2005 Radiological Environmental Monitoring Report2005-09-15015 September 2005 Experimental Corporation 2005 Radiological Environmental Monitoring Report E910-05-062, 2005 Annual Radioactive Effluent Releases Report for Saxton Nuclear Experimental Corporation (Snec)2005-09-15015 September 2005 2005 Annual Radioactive Effluent Releases Report for Saxton Nuclear Experimental Corporation (Snec) E910-05-066, Experimental Corporation Response to Comments on Snec Final Status Survey Reports2005-09-0808 September 2005 Experimental Corporation Response to Comments on Snec Final Status Survey Reports E910-05-049, Experimental Corporation, FSS Report for Open Land Area OL22005-07-27027 July 2005 Experimental Corporation, FSS Report for Open Land Area OL2 E910-05-048, Transmittal of Saxton Nuclear Experimental Corporation FSS Report for OL3 Paved Surfaces and Concrete2005-07-27027 July 2005 Transmittal of Saxton Nuclear Experimental Corporation FSS Report for OL3 Paved Surfaces and Concrete E910-05-047, Experimental Corp (Snec) FSS Report for Ssgs Seal Chamber Roofs2005-07-27027 July 2005 Experimental Corp (Snec) FSS Report for Ssgs Seal Chamber Roofs E910-05-051, Transmittal of Saxton Nuclear Experimental Corporation (Snec), FSS Report for Residual Macadam in OL12005-07-27027 July 2005 Transmittal of Saxton Nuclear Experimental Corporation (Snec), FSS Report for Residual Macadam in OL1 E910-05-050, Transmittal of Saxton Nuclear Experimental Corp FSS Report for Residual Concrete in OL12005-07-27027 July 2005 Transmittal of Saxton Nuclear Experimental Corp FSS Report for Residual Concrete in OL1 E910-05-043, Submittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Intake Tunnel2005-07-26026 July 2005 Submittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Intake Tunnel E910-05-041, Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Open Land Area OL1 - Soils2005-07-26026 July 2005 Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Open Land Area OL1 - Soils E910-05-044, Transmittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Discharge Tunnel2005-07-26026 July 2005 Transmittal of Saxton Nuclear Experimental Corp FSS Report for Ssgs Structural Surfaces - Discharge Tunnel E910-05-042, Transmittal of FSS Report for OL7 - Paved Surfaces and Concrete2005-07-26026 July 2005 Transmittal of FSS Report for OL7 - Paved Surfaces and Concrete E910-05-013, Submittal of Saxton Nuclear Experimental Corporation, FSS Report for Cv Yard Excavation - Soil and Structural Remnants2005-07-26026 July 2005 Submittal of Saxton Nuclear Experimental Corporation, FSS Report for Cv Yard Excavation - Soil and Structural Remnants E910-05-045, Experimental Corporation (Snec) FSS Report for - Ssgs Structural Surfaces - Cv Steam Tunnel2005-07-25025 July 2005 Experimental Corporation (Snec) FSS Report for - Ssgs Structural Surfaces - Cv Steam Tunnel E910-05-038, FSS Report for Ssgs Seal Chambers2005-07-22022 July 2005 FSS Report for Ssgs Seal Chambers E910-05-036, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS132005-07-22022 July 2005 Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS13 E910-05-035, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL72005-07-22022 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL7 E910-05-003, Experimental Corporation Final Status Survey Report for OL6 and OL102005-07-14014 July 2005 Experimental Corporation Final Status Survey Report for OL6 and OL10 E910-05-031, Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Survey of Remediated Soils2005-07-14014 July 2005 Transmittal of Saxton Nuclear Experimental Corporation (Snec) FSS Report for Survey of Remediated Soils E910-05-028, Transmitting Saxton Nuclear Experimental Corporation (Snec) 2004 Annual Report2005-06-28028 June 2005 Transmitting Saxton Nuclear Experimental Corporation (Snec) 2004 Annual Report E910-05-023, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA92005-06-22022 June 2005 Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA9 E910-05-021, Experimental Corporation, Revision 5 of the Snec Facility Quality Assurance Plan2005-06-15015 June 2005 Experimental Corporation, Revision 5 of the Snec Facility Quality Assurance Plan E910-05-007, Experimental Corporation (Snec), Management Change2005-05-19019 May 2005 Experimental Corporation (Snec), Management Change E910-05-011, Experimental Corporation, 2004 Radiological Environmental Monitoring Report2005-04-28028 April 2005 Experimental Corporation, 2004 Radiological Environmental Monitoring Report E910-05-009, Experimental Corporation - Transmittal of 2004 Annual Radioactive Effluent Releases Report2005-04-25025 April 2005 Experimental Corporation - Transmittal of 2004 Annual Radioactive Effluent Releases Report E910-04-018, Experimental Corporation - FSS Report for Snec Penelec Line Shack2004-06-29029 June 2004 Experimental Corporation - FSS Report for Snec Penelec Line Shack E910-04-017, Revised Decommissioning Report for the Saxton Nuclear Experimental Corporation and Financial Test Information2004-05-12012 May 2004 Revised Decommissioning Report for the Saxton Nuclear Experimental Corporation and Financial Test Information E910-04-015, Experimental Corporation (Snec), 2003 Annual Radioactive Effluent Releases Report2004-05-0303 May 2004 Experimental Corporation (Snec), 2003 Annual Radioactive Effluent Releases Report E910-04-016, Experimental Corporation (Snec), 2003 Radiological Environmental Monitoring Report2004-04-28028 April 2004 Experimental Corporation (Snec), 2003 Radiological Environmental Monitoring Report E910-04-006, Letter Transmitting Saxton Nuclear Experimental Corporation Biennial 10 CFR 50.59 Report and Updated Safety Analysis Report2004-03-18018 March 2004 Letter Transmitting Saxton Nuclear Experimental Corporation Biennial 10 CFR 50.59 Report and Updated Safety Analysis Report E910-04-004, Experimental Corporation 2003 Annual Report for 01/01/2003 - 12/31/20032004-01-29029 January 2004 Experimental Corporation 2003 Annual Report for 01/01/2003 - 12/31/2003 E910-03-048, Containment Vessel (Cv) Radiation Survey2003-12-22022 December 2003 Containment Vessel (Cv) Radiation Survey E910-03-041, Experimental Corp, FSS Report for Snec Cv Interior Above 774 Elev and Exterior2003-10-29029 October 2003 Experimental Corp, FSS Report for Snec Cv Interior Above 774 Elev and Exterior E910-03-038, Technical Specification Change Request No. 62, Rev.22003-09-30030 September 2003 Technical Specification Change Request No. 62, Rev.2 E910-03-031, FSS Report for Cv Interior, 774' Elev and Below, Revision 12003-09-0404 September 2003 FSS Report for Cv Interior, 774' Elev and Below, Revision 1 E910-03-019, 2002 Annual Report2003-04-30030 April 2003 2002 Annual Report E901-03-018, Radiological Environmental Monitoring Report2003-04-30030 April 2003 Radiological Environmental Monitoring Report E910-03-017, Annual Radioactive Effluent Releases Report2003-04-30030 April 2003 Annual Radioactive Effluent Releases Report E910-03-010, Decommissioning Reports for Three Mile Island Unit 2, & Saxton Nuclear Experimental Corporation2003-03-21021 March 2003 Decommissioning Reports for Three Mile Island Unit 2, & Saxton Nuclear Experimental Corporation E910-03-002, of Saxton Nuclear Experimental Corporation Facility Quality Assurance Plan2003-01-20020 January 2003 of Saxton Nuclear Experimental Corporation Facility Quality Assurance Plan E910-02-054, Experimental Corporation (Snec) Application for License Termination2002-12-16016 December 2002 Experimental Corporation (Snec) Application for License Termination E910-02-060, Shonka Report Submittal2002-12-16016 December 2002 Shonka Report Submittal E910-02-058, TS Change Request No.62, Rev.12002-12-0505 December 2002 TS Change Request No.62, Rev.1 E910-02-049, Submittal of Information to NRC in 08/29/02 Meeting, Revision 1 Re Updated License Termination Plan2002-10-10010 October 2002 Submittal of Information to NRC in 08/29/02 Meeting, Revision 1 Re Updated License Termination Plan 2006-03-13 Category:Status Report MONTHYEARE910-05-068, Experimental Corporation, Response to Additional Comments on Snec Final Status Survey Reports2005-09-29029 September 2005
[Table view]Experimental Corporation, Response to Additional Comments on Snec Final Status Survey Reports E910-05-066, Experimental Corporation Response to Comments on Snec Final Status Survey Reports2005-09-0808 September 2005 Experimental Corporation Response to Comments on Snec Final Status Survey Reports ML0521403322005-07-31031 July 2005 Survey Report, Saxton Nuclear Experimental Corp Site Areas MA3 and MA4 - Weir Discharge Area. E910-05-039, Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces Discharge Tunnel Transition Area SS23, SS252005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces Discharge Tunnel Transition Area SS23, SS25 ML0520902962005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation ML0520903002005-07-31031 July 2005 Appendix a Survey Design. ML0520903042005-07-31031 July 2005 Appendix B Snec Calculation Dose Assessment of Results. ML0521400512005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corp Open Land Area OL1. ML0521400662005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation OL7 Paved Surfaces and Concrete. ML0521401022005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation 0L3 Paved Surfaces and Concrete. ML0521401042005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corp Containment Vessel Yard Excavation - Soil and Structural Remnants. ML0521401162005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Cv Steam Tunnel SS22, Main Report ML0521401342005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces - Seal Chamber Roofs SS17 (1&2) and SS18 (1&2). ML0521401422005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area 0L2. ML0521401632005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Intake Tunnel SS19, SS20, SS21. ML0521402532005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Residual Macadam in OL1. ML0521403962005-07-31031 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corp Residual Concrete in OL1. E910-05-035, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL72005-07-22022 July 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL7 E910-05-036, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS132005-07-22022 July 2005 Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS13 E910-05-003, Experimental Corporation Final Status Survey Report for OL6 and OL102005-07-14014 July 2005 Experimental Corporation Final Status Survey Report for OL6 and OL10 ML0521400592005-06-30030 June 2005 Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces -Discharge Tunnel SSI, SS2, SS3, SS4, SS5, SS6, SS7. E910-05-024, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL13. Appendix a2005-06-22022 June 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL13. Appendix a E910-05-025, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survery Units OL11-1 and OL11-2, Appendix a2005-06-22022 June 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survery Units OL11-1 and OL11-2, Appendix a E910-05-023, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA92005-06-22022 June 2005 Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA9 E910-05-022, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL4. Appendix a to Appendix E2005-06-22022 June 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL4. Appendix a to Appendix E E910-05-002, Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL4. Appendix G2005-06-22022 June 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL4. Appendix G ML0521401062005-06-0909 June 2005 Rev 2 to Calculation E900-05-032, Open Land FSS Design - OL3 Paved Surfaces & Concrete, Appendices a - B to Final Status Survey Report for Saxton Nuclear Experimental Corporation 0L3 Paved Surfaces and Concrete. E910-05-018, Calculation E900-05-020, Rev 0, OL9 Open Land Area - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL92005-06-0707 June 2005 Calculation E900-05-020, Rev 0, OL9 Open Land Area - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL9 ML0521400742005-05-31031 May 2005 Rev 2 to Calculation E900-05-028, Open Land FSS Design - OL7 Paved Surfaces & Concrete, Appendices a & B to Final Status Survey Report for Saxton Nuclear Experimental Corporation OL7 Paved Surfaces and Concrete. E910-05-056, Rev. 0 to Calculation E900-05-024, Open Land FSS Design-OL3, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL3.2005-05-27027 May 2005 Rev. 0 to Calculation E900-05-024, Open Land FSS Design-OL3, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL3. ML0521404032005-05-19019 May 2005 Rev. 1 to Calculation E900-05-015, OL1 Paved & Miscellaneous Concrete Surfaces MA8, PF1, DB5, DB1, SS12, SS24-Survey Design, Appendices B - D to Final Status Survey Report for Saxton Nuclear Experimental Corp Residual Concrete in OL1. ML0521402592005-05-19019 May 2005 Rev. 1 to Calculation E900-05-015, OL1 Paved & Miscellaneous Concrete Surfaces MA8, PF1, DB5, DB1, SS12, SS24 - Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Residual Macadam in OL1. ML0521401232005-05-16016 May 2005 to Calculation E900-05-029, Assessment of Cv Tunnel Unistrut, Appendix C to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Cv Steam Tunnel SS22 E910-05-037, Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Basement SS14, SS15, SS16, SS17, Appendix E, E900-05-008 Calculation Sheet2005-05-12012 May 2005 Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces - Basement SS14, SS15, SS16, SS17, Appendix E, E900-05-008 Calculation Sheet ML0521400772005-05-12012 May 2005 Rev. 0 to Calculation E900-04-021, Assessment of Survey Results for Discharge Tunnel Class 1 Areas, Appendix E to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces -Discharg ML0521400532005-05-10010 May 2005 Rev 0 to Calculation E900-05-014, Snec Plant Area Open Land - OL1 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corp Open Land Area OL1. ML0521403992005-05-0404 May 2005 Rev. 0 to Calculation E900-05-015, OL1 Paved & Miscellaneous Concrete Surfaces MA8, PF1, DB5, DB1 - Survey Design, Appendex a to Final Status Survey Report for Saxton Nuclear Experimental Corp Residual Concrete in OL1. ML0521401492005-04-29029 April 2005 to Calculation E900-05-009, Westinghouse and Adjacent Areas Open Land - OL2 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL2. ML0521401532005-04-29029 April 2005 to Calculation E900-05-011, Westinghouse and Adjacent Areas MA8-5 Concrete Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL2. ML0521402562005-04-27027 April 2005 Rev. 0 to Calculation E900-05-015, OL1 Paved and Miscellaneous Concrete Surfaces MA8, PF1, DB5, Dbi - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corporation Residual Macadam in OL1. E910-05-029, Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL82005-03-29029 March 2005 Calculation E900-05-013, Rev. 0, Open Land FSS Design - OL8, Appendix a, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area OL8 E910-05-016, Calculation E900-05-018, Rev 0, Miscellaneous Area FSS Design - MA2, Appendix a with Attachments to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area MA22005-03-24024 March 2005 Calculation E900-05-018, Rev 0, Miscellaneous Area FSS Design - MA2, Appendix a with Attachments to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area MA2 E910-05-052, Rev. 0 to Calculation E900-04-027, Cv Yard Survey Design - Temporary Water Supply Trench in Cv Yard, Appendix A-1 to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survey Unit OL1-6.2005-03-11011 March 2005 Rev. 0 to Calculation E900-04-027, Cv Yard Survey Design - Temporary Water Supply Trench in Cv Yard, Appendix A-1 to Final Status Survey Report for Saxton Nuclear Experimental Corporation Open Land Area Survey Unit OL1-6. E910-05-020, Calculation E900-05-005, Rev 0, Spray Pond - Survey Design, Appendix a, with Attachments, to Final Status Survey Report Saxton Nuclear Experimental Corporation Spray Pond Area2005-03-11011 March 2005 Calculation E900-05-005, Rev 0, Spray Pond - Survey Design, Appendix a, with Attachments, to Final Status Survey Report Saxton Nuclear Experimental Corporation Spray Pond Area E910-05-030, Calculation E900-05-003, Rev. 0, Penelec Switch Yard, Class 2 Area, Survey Design, Appendix C-1, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Penelec Switch Yard Area2005-03-11011 March 2005 Calculation E900-05-003, Rev. 0, Penelec Switch Yard, Class 2 Area, Survey Design, Appendix C-1, with Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Penelec Switch Yard Area E910-05-046, Rev 0 to E900-04-017, Upper Spray Pump Area and Discharge Tunnel Entrance Survey Design, Appendix B & Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfa2004-08-31031 August 2004 Rev 0 to E900-04-017, Upper Spray Pump Area and Discharge Tunnel Entrance Survey Design, Appendix B & Attachments, to Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces ML0520902482004-08-12012 August 2004 Final Status Survey Report for Saxton Nuclear Experimental Corporation Saxton Steam Generating Station Structural Surfaces Discharge Tunnel Transition Area SS23, SS25, Appendix B Snec Calculation Sheet ML0521401362004-08-0202 August 2004 Rev 0 to Calculation E900-03-032, Top of Seal Chamber 3 - Survey Design, Appendix a to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces - Seal Chamber Roofs SS17 (1&2) & SS1 ML0521401192004-07-15015 July 2004 Rev 0 to Calculation E900-04-013, Cv Yard Survey Design - North East Side of Cv, Appendices a - D to Final Status Survey Report for Saxton Nuclear Experimental Corp Containment Vessel Yard Excavation - Soil and Structural Remnants. ML0521401442004-07-0101 July 2004 Rev 0 to Calculation E900-04-012, Cv Tunnel & Top of Seal Chambers 1 & 2 Survey Design, Appendix B to Final Status Survey Report for Saxton Nuclear Experimental Corp Saxton Steam Generating Station Structural Surfaces - Seal Chamber Roofs S 2005-09-08 |
Text
GPU Nuclear, Inc.
GmU Three Mile Island Nuclear Station NUCLEAR Route 441 South Post Office Box 480 July 14, 2005 Middletown, PA 17057-0480 E91 0-05-033 Tel 717-948-8461 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen, Subject Saxton Nuclear Experimental Corporation (SNEC)
Operating License No., DPR-4 Docket No. 50-146 FSS Report for 0L6 and OL1 0 The purpose of this letter is to submit for your review the attached FSS Report for 0L6 and OL10. One CD-ROM is included in this submission. The CD-ROM labeled: 'FSS Report of OL6 and OL10 - Publicly Available" contains the following 8 files:
Document Title File Name File Size (Mbytes)
Main Report 001 FSS Report- 0L6 and 4.04
_OL1.pdf Appendix A-1 (pages 1-9) 002 - Appendix A-1 (1-9).pdf 40 Appendix A-1 (attachments 1-1 to 3-1) 0031-Appendix A-I (attachments 28.7 Appendix_-1_(attacments_4-1to_6-2)I-1 to 3-1).pdf Appendix A-1 (attachments 4-1 to 6-2) 004 - Appendix A-1 (attachments 7.46 11)_ 64-1 to 6-2).pdf Appendix A-1 (attachments 6-3 to 6- 005 - Appendix A-1 (attachments 18.2
- 11) 6-3 to 6-11).pdf 1.
Appendix A-1 (attachments 7-I to 7-4) 006 - Appendix A-1 (attachments 15.8 Appendix___ A-2,_A-3,_ _A-5__ 008 7-1 to 7-4).pdf A-3,_A-4,_A-_46.5 Appendix A-I_______________________________7-5 (attachments 7-5 to 9-2) 07-ApniAI(atcm ts28.3 to_9-2).pdf______________
Appendix A-2, A-3, A-4, A-5 008 - Appendix A-2, A-3, A-4, A- 46.5
__ __ __ __ _ __ __ __ __ _ __ _ __ _ _ _ _ _ _ _ _ _5 .p d f_ _ _ _ _ _ _ _ _ _ _ _ _ _
If you have any questions on this information, please contact Mr. Art Paynter at (814) 635-4384.
Program Director, SNEC cc: NRC Project Manager NRC Project Scientist, Region 1 Mr. Tim Bauer, ORISE Project Leader
'Zo