CP-201500309, Response to Inspection Report 05000445/2014404 & 05000446/2014404; Preliminary Greater than Green Finding

From kanterella
Jump to navigation Jump to search
Response to Inspection Report 05000445/2014404 & 05000446/2014404; Preliminary Greater than Green Finding
ML15091A318
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/12/2015
From: Flores R
Luminant Generation Co, Luminant Power
To: Mark Haire
Division of Reactor Safety IV
References
CP-201500309, TXX-15041 IR 2014404
Download: ML15091A318 (2)


Text

Rafael Flores Luminant Power Senior Vice President P 0 Box 1002

& Chief Nuclear Officer 6322 North FM 56 rafael.flores@Luminant.com Glen Rose, TX 76043 Luminant T 254 897 5590 C 817 559 0403 F 254 897 6652 CP-201500309 Log # TXX-15041 March 12, 2015 Mr. Mark Haire, Chief, Plant Support Branch 1 U. S. Nuclear Regulatory Commission 1600 East Lamar Blvd.

Arlington, Texas 76011-4511

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NOS. 50-445, 50-446 and 72-74 RESPONSE TO INSPECTION REPORT 05000445/2014404 AND 05000446/2014404; PRELIMINARY GREATER THAN GREEN FINDING

REFERENCE:

Letter dated March 6, 2015, from Mr. Anton Vegel (NRC) to Mr. Rafael Flores (CPNPP),

transmitting NRC Inspection Report 2014404 (ML15065A211)

Dear Mr. Haire:

The reference letter transmitted NRC Inspection Report 05000445/2014404 and 05000446/2014404, which provided the results of a security baseline inspection conducted during the week of August 25, 2014 at Comanche Peak Nuclear Power Plant (CPNPP). The letter identified an apparent violation that is being considered for escalated enforcement. The letter also provided Luminant Generation Company LLC (Luminant Power) the opportunity to either: 1) attend a Regulatory Conference; or 2) submit Luminant Power's position on the finding to the NRC in writing within 30 days of the receipt of the letter.

Luminant Power has elected to submit our position on the finding in writing. Mr. Robert Slough of CPNPP Regulatory Affairs informed Mr. Mark Haire of the NRC of this decision by phone on March 11, 2015.

This communication contains no new licensing basis commitments regarding Comanche Peak Units 1 and 2 or the Independent Spent Fuel Storage Installation.

Uý S. Nuclear Regulatory Commission TXX-15041 Page 2 of 2 03/12/2015 Should you have any questions, please contact Jim Barnette at (254) 897-5866 or James.barnette@luminant.com.

Sincerely, Luminant Generation Company LLC Rafael Flores B y: _

cePresident c - Marc L. Dapas, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak NRC Document Control Desk