CP-201200314, Property Damage Insurance
ML12102A027 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 03/28/2012 |
From: | Flores R, Madden F Luminant Generation Co, Luminant Power |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CP-201200314, TXX-12052 | |
Download: ML12102A027 (2) | |
Similar Documents at Comanche Peak | |
---|---|
Category:Financial Assurance Document
MONTHYEARCP-202200068, (CPNPP) - Guarantees of Payment of Deferred Premiums2022-02-10010 February 2022
[Table view](CPNPP) - Guarantees of Payment of Deferred Premiums CP-202100086, (CPNPP) - Guarantees of Payment of Deferred Premiums2021-02-10010 February 2021 (CPNPP) - Guarantees of Payment of Deferred Premiums CP-202000062, Guarantees of Payment of Deferred Premiums2020-02-11011 February 2020 Guarantees of Payment of Deferred Premiums CP-201900155, Decommissioning Report2019-03-27027 March 2019 Decommissioning Report CP-201900153, Property Damage Insurance2019-03-27027 March 2019 Property Damage Insurance CP-201800087, Submittal of Guarantees of Payment of Deferred Premiums2018-02-0808 February 2018 Submittal of Guarantees of Payment of Deferred Premiums CP-201700225, Guarantees of Payment of Deferred Premiums2017-03-30030 March 2017 Guarantees of Payment of Deferred Premiums CP-201500266, Submittal of Summary Report of the Level and Source of on-site Property Damage Insurance Coverage as of April 20152015-03-26026 March 2015 Submittal of Summary Report of the Level and Source of on-site Property Damage Insurance Coverage as of April 2015 CP-201500138, Guarantees of Payment of Deferred Premiums2015-02-0505 February 2015 Guarantees of Payment of Deferred Premiums CP-201400336, Submittal of Report of Level and Source of On-site Property Damage Insurance Coverage2014-03-27027 March 2014 Submittal of Report of Level and Source of On-site Property Damage Insurance Coverage CP-201400072, Guarantees of Payment of Deferred Premiums2014-02-0606 February 2014 Guarantees of Payment of Deferred Premiums CP-201300286, Submittal of Property Damage Insurance2013-03-0707 March 2013 Submittal of Property Damage Insurance CP-201201309, Independent Spent Fuel Storage Installation, Additional Information Regarding Application for Order Approving Indirect and Internal Transfer of Licenses2012-10-24024 October 2012 Independent Spent Fuel Storage Installation, Additional Information Regarding Application for Order Approving Indirect and Internal Transfer of Licenses CP-201200314, Property Damage Insurance2012-03-28028 March 2012 Property Damage Insurance ML1123512652011-11-14014 November 2011 2010 DFS Report Analysis for Comanche Peak Steam Electric Station, Unit 2 ML1123512642011-11-14014 November 2011 2010 DFS Report Analysis for Comanche Peak Steam Electric Station, Unit 1 CP-201100294, Property Damage Insurance2011-03-0303 March 2011 Property Damage Insurance CP-201100296, Nuclear Liability Insurance2011-03-0303 March 2011 Nuclear Liability Insurance ML1011901802010-04-22022 April 2010 Submittal of Nuclear Liability Insurance CP-201000426, Property Damage Insurance2010-03-25025 March 2010 Property Damage Insurance CP-201000128, Guarantees of Payment of Deferred Premiums2010-02-0101 February 2010 Guarantees of Payment of Deferred Premiums CP-200900475, Liability Insurance2009-04-0202 April 2009 Liability Insurance CP-200800214, Guarantees of Payment of Deferred Premiums2008-02-0707 February 2008 Guarantees of Payment of Deferred Premiums CPSES-200700719, Nuclear Liability Insurance2007-04-10010 April 2007 Nuclear Liability Insurance CPSES-200601004, Submittal of Securities and Exchange Commission Annual Form 10K Reports for Txu Power2006-05-31031 May 2006 Submittal of Securities and Exchange Commission Annual Form 10K Reports for Txu Power CPSES-200500856, (CPSES) Nuclear Liability Insurance2005-04-11011 April 2005 (CPSES) Nuclear Liability Insurance CPSES-200500331, (CPSES) - Guarantees of Payment of Deferred Premiums2005-02-0404 February 2005 (CPSES) - Guarantees of Payment of Deferred Premiums CPSES-200300455, Liability Insurance2003-02-24024 February 2003 Liability Insurance CPSES-200202258, Submittal of Securities & Exchange Commission Annual Report Form 10K for Txu Energy2002-05-15015 May 2002 Submittal of Securities & Exchange Commission Annual Report Form 10K for Txu Energy CPSES-200200363, Guarantees of Payment of Deferred Premiums2002-02-0505 February 2002 Guarantees of Payment of Deferred Premiums 2022-02-10 Category:Letter type:CP MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024
[Table view]License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters CP-202400107, (CPNPP) - 2023 Annual Radiological Environmental Operating Report2024-04-18018 April 2024 (CPNPP) - 2023 Annual Radiological Environmental Operating Report CP-202400099, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2024-04-0909 April 2024 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202400092, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-04-0101 April 2024 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400089, Property Damage Insurance2024-03-25025 March 2024 Property Damage Insurance CP-202400087, (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable2024-03-21021 March 2024 (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable CP-202400085, (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-0707 March 2024 (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202400073, (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-03-0404 March 2024 (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400072, (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation2024-02-29029 February 2024 (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions CP-202400063, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)2024-02-12012 February 2024 (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23) CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300533, (CPNPP) - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-14014 November 2023 (CPNPP) - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report2023-08-17017 August 2023 (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1122023-08-0101 August 2023 (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application – Sets 2 and 3 CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)2023-07-18018 July 2023 (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-052023-05-25025 May 2023 Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)2023-05-0404 May 2023 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Environmental Operating Report CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Effluent Release Report CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements 2024-09-12 |
Text
Rafael Flores Luminant Power Senior Vice President P 0 Box 1002
& Chief Nuclear Officer 6322 North FM 56 rafael.flores@Luminant.com Glen Rose, TX 76043 Luminant T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-201200314 Ref. # 10CFR50.54(w)
Log # TXX-12052 March 28, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NOS. 50-445 AND 50-446 PROPERTY DAMAGE INSURANCE
Dear Sir or Madam:
In accordance with the requirements of 10CFR50.54(w), Luminant Generation Company LLC (Luminant Power) hereby submits the attached summary report of the level and source of on-site property damage insurance coverage for Comanche Peak as of April 1, 2012. The level of coverage maintained is in excess of the $1.06 billion as required by 10CFR50.54(w).
This communication contains no new licensing basis commitments regarding Comanche Peak Units 1 and 2.
Should you have any questions, please contact Mr. J. D. Seawright at (254) 897-0140.
Sincerely, Luminant Generation Company LLC Rafael Flo es By:
Fre
/j2 2 '~
W Madden Director, Oversight & Regulatory Affairs Attachment c- E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak
ýDo I
Attachment to TXX-12052 Page 1 of 1 Comanche Peak Nuclear Power Plant Nuclear Property Insurance Coverage As of April 1, 2012 Property - All Risk (Operating Facility)
Policy No. Insuring Company Amount of Insurance Expires P12-061 Nuclear Electric Insurance Ltd. $ 500,000,000 April 1, 2013 X12-062 Nuclear Electric Insurance Ltd. $ 1,250,000,000 April 1, 2013 Al 4/57/2012/0 European Mutual Association for $ 500,000,000 March 31, 2013 Nuclear Insurance (EMANI)
Total $ 2,250,000,000