BW230058, Submittal of Integrated Initial License Training Written Examination Materials
| ML23354A008 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 12/20/2023 |
| From: | Gugle G Constellation Energy Generation |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| BW230058 | |
| Download: ML23354A008 (1) | |
Text
Constellation.
December 20, 2023 BW230058 U.S. Nuclear Regulatory Commission Regional Administrator, Region Ill 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Braidwood Station, Units 1 and 2 Constellation Energy Generation, LLC (CEG)
Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 www.constellationenergy.com 10 CFR 55.40(b)
Renewed Facility Operating License Nos. NPF-72 and NFP-77 NRC Docket Nos. STN 50-456 and STN 50-457
Subject:
Submittal of Integrated Initial License Training Written Examination Materials This letter is a follow-up to the December 15, 2023 electronic submittal of the examination materials that Braidwood Station has submitted in support of the Initial License Examination scheduled for the weeks of March 18, 2024 through March 29, 2024, at Braidwood Station.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 12. Please note that reference materials are attached to each individual examination question or item.
In accordance with NUREG-1021, Revision 12, Section ES-1.3, Examination Security, please ensure that these materials are withheld from public disclosure until after the examinations are complete.
Should you have any questions concerning this letter, please contact Mr. Dane Brunswick, Regulatory Assurance Manager, at (815) 417-2800. For questions concerning examination materials, please contact Mr. Kevin Day, Operations Training Lead Instructor, at (815) 458-7690.
Respectfully, Digitally signed by Gugle, G
I G Greg ug e, reg Date:2023.12.1810:56:23
-06'00' Gregory Gugle Site Vice President Braidwood Station
December 20 2023 U.S. Nuclear Regulatory Commission Page 2 Documents submitted December 15, 2023, via box.com electronic systems to Jim Nance, Chief Examiner, Region Ill:
RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:
o Examination Security Agreements (Form 1.3-1) o Operating Test Quality Checklist (Form 2.3-2) o Written Exam Quality Checklist (Form 2.3-4) o Events and Evolutions Checklist (Form 3.4-1) o Record of Rejected K/As (Form 4.1-1) cc:
(without attachments)
Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector-Braidwood Station