Category:Letter type:BSEP
MONTHYEARBSEP 19-0012, Submittal of 2018 Sea Turtle Annual Report2019-01-17017 January 2019 Submittal of 2018 Sea Turtle Annual Report BSEP 18-0052, Annual Radiological Environmental Operating Report - 20172018-05-10010 May 2018 Annual Radiological Environmental Operating Report - 2017 BSEP 18-0051, Annual Radioactive Effluent Release Report - 20172018-04-26026 April 2018 Annual Radioactive Effluent Release Report - 2017 BSEP 18-0045, Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time2018-04-25025 April 2018 Request for License Amendment: Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time BSEP 18-0054, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential.2018-04-24024 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential. BSEP 18-0048, Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-04-11011 April 2018 Response to Request for Additional Information Regarding Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0046, Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-04-10010 April 2018 Supplement to Response to Request for Additional Information SRXB-RAI-2 Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0047, Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test2018-04-0505 April 2018 Supplement to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) for End of Interval Leakage Test BSEP 18-0041, Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-04-0404 April 2018 Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0043, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-03-31031 March 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D BSEP 18-0035, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-29029 March 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0042, Cycle 22 Core Operating Limits Report (COLR)2018-03-27027 March 2018 Cycle 22 Core Operating Limits Report (COLR) BSEP 18-0040, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test2018-03-23023 March 2018 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for End of Interval Leakage Test BSEP 18-0039, Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D2018-03-19019 March 2018 Proposed In-Service Inspection Alternative for Application of Dissimilar Metal Weld Full Structural Overlay - Nozzles N4A and N4D BSEP 18-0034, Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-16016 March 2018 Corrected Affidavit Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0032, Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion2018-03-14014 March 2018 Additional Testing Information Relating to the Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 18-0026, Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2018-03-0707 March 2018 Additional Information Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 18-0014, Fifth 10-Year Inservice Testing Program Plan2018-02-19019 February 2018 Fifth 10-Year Inservice Testing Program Plan BSEP 18-0021, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure2018-02-0505 February 2018 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion (CAC Nos. MF8864 and MF8865). Without Proprietary Enclosure BSEP 18-0017, Revision to Radiological Emergency Response Plan and Implementing Procedure2018-01-30030 January 2018 Revision to Radiological Emergency Response Plan and Implementing Procedure BSEP 18-0015, Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations2018-01-23023 January 2018 Inservice Inspection Program Proposed Alternative ISI-09 in Accordance with 10 CFR 50.55a(z)(1) Regarding Reactor Pressure Vessel Circumferential Shell Weld Examinations BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 18-0001, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements BSEP 18-0012, Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.32018-01-23023 January 2018 Application to Revise Technical Specifications to Adopt TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 BSEP 18-0009, 2017 Sea Turtle Annual Report2018-01-15015 January 2018 2017 Sea Turtle Annual Report BSEP 17-0098, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2018-01-10010 January 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors BSEP 17-0119, Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program2018-01-10010 January 2018 Snubber Program Plan for Fifth 10-Year Interval Inservice Testing Program BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions2017-12-20020 December 2017 Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination BSEP 17-0120, Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension..2017-12-12012 December 2017 Withdrawal of Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension.. BSEP 17-0118, Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel..2017-12-0707 December 2017 Supplement to Response to Request for Additional Information Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel.. BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources..2017-12-0606 December 2017 Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources.. BSEP 17-0116, Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of ..2017-12-0404 December 2017 Response to Request for Additional Information Regarding Request for Risk- Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of .. BSEP 17-0104, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination2017-11-29029 November 2017 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Pressure Vessel Nozzle-to-Vessel Weld Examination BSEP 17-0111, Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-28028 November 2017 Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1, AC Sources Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0109, Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And.2017-11-24024 November 2017 Response to Request for Additional Information Regarding Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times And. BSEP 17-0108, Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements2017-11-22022 November 2017 Request for Emergency License Amendment - Technical Specification 3.8.1, AC Sources - Operating, One-Time Extension of Emergency Diesel Generator Completion Times and Suspension of Surveillance Requirements BSEP 17-0017, Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material2017-11-15015 November 2017 Submittal of Request for License Amendment for Performance-Based Fire Protection Alternative for Thermal Insulation Material BSEP 17-0100, Fifth 10-Year Inservice Testing Interval2017-11-0202 November 2017 Fifth 10-Year Inservice Testing Interval BSEP 17-0089, Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Updates to Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0093, Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion2017-11-0101 November 2017 Response to Request for Additional Information Regarding Request for License Amendment Regarding Core Flow Operating Range Expansion BSEP 17-0078, Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.52017-10-0303 October 2017 Request for License Amendment - DC Sources - Operating Surveillance Requirement (SR) 3.8.4.5 BSEP 17-0076, Registration for Use of General License Spent Fuel Casks2017-09-0606 September 2017 Registration for Use of General License Spent Fuel Casks BSEP 17-0081, Revision to Radiological Emergency Response Plan Implementing Procedures2017-09-0505 September 2017 Revision to Radiological Emergency Response Plan Implementing Procedures BSEP 17-0039, Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements2017-08-15015 August 2017 Submittal of Response to Inspection Report 05000324/2015404 and 05000325/2015404, Dated March 30, 2015, Inspection of Interim Cyber Security Milestones 1-7 and Target Set Requirements BSEP 17-0071, ISFSI - Registration for Use of General License Spent Fuel Casks2017-08-15015 August 2017 ISFSI - Registration for Use of General License Spent Fuel Casks BSEP 17-0064, Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N92017-07-10010 July 2017 Application of Dissimilar Metal Weld Full Structural Overlay on Reactor Pressure Vessel Nozzle N9 BSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. 2019-01-17
[Table view] Category:Report
MONTHYEARRA-22-0165, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 242022-06-0909 June 2022 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 RA-22-0134, Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data2022-05-25025 May 2022 Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data RA-21-0198, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 252021-06-21021 June 2021 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 25 RA-21-0176, Cycle 24 Mellla+ Eigenvalue Tracking Data2021-06-0707 June 2021 Cycle 24 Mellla+ Eigenvalue Tracking Data RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1)2021-02-24024 February 2021 Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) RA-20-0347, 10 CFR 71.95 Report on the 3-60B Cask2020-11-16016 November 2020 10 CFR 71.95 Report on the 3-60B Cask RA-19-0479, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-12-31031 December 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0411, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-10-23023 October 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0338, Pressure and Temperature Limits Report for Unit Nos. 1 and 22019-08-15015 August 2019 Pressure and Temperature Limits Report for Unit Nos. 1 and 2 RA-19-0243, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-07-0202 July 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-05-29029 May 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-03-18018 March 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0100, Request for License Amendment Regarding Application of Advanced Framatome Methodologies2018-10-11011 October 2018 Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0131, Technical Requirements Manual, Revision 662018-08-13013 August 2018 Technical Requirements Manual, Revision 66 ML18249A1592018-08-13013 August 2018 Technical Requirements Manual, Revision 73 RA-18-0024, Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-05-29029 May 2018 Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16287A4222016-09-26026 September 2016 FS1-0028339 Revision 1.0, Brunswick, Unit 1, Cycle 21 and Unit 2 Cycle 23 MELLLA SLMCPR Analyses with SAFLIM30 Methodology. ML16223A7252016-08-17017 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) CAC Nos. MF4467 and MF4468) ML18250A0022016-08-11011 August 2016 Technical Requirements Manual, Revision 70 ML18250A0032016-08-11011 August 2016 Technical Requirements Manual, Revision 63 ML16257A4112016-07-31031 July 2016 DUKE-0B21-1104-000(NP), Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus. ML16041A4352016-03-0101 March 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ML16257A4062015-12-31031 December 2015 ANP-3106(NP), Revision 2, Brunswick Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM Fuel for Mellla+ Operation. ML15275A2902015-09-30030 September 2015 Areva, Inc., - ANP-3397NP, Revision 0, Brunswick, Unit 2, Atrium 11 Lead Test Assemblies Design & Licensing Summary Report. BSEP 16-0056, ANP-3108(NP), Revision 1, Applicability of Areva BWR Methods to Brunswick Extended Power Flow Operating Domain.2015-07-31031 July 2015 ANP-3108(NP), Revision 1, Applicability of Areva BWR Methods to Brunswick Extended Power Flow Operating Domain. ML16257A4082015-07-31031 July 2015 ANP-3105(NP), Revision 1, Brunswick Units 1 and 2 LOCA Break Spectrum Analysis for Atrium 10XM Fuel for Mellla+ Operation. BSEP 15-0004, Enclosure 3 - Areva Operability Assessment. (CR 2014-7395)2015-01-13013 January 2015 Enclosure 3 - Areva Operability Assessment. (CR #2014-7395) BSEP 14-0131, Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident2014-12-18018 December 2014 Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident ML14297A2662014-10-24024 October 2014 Record of Review, Brunswick Steam Electric Plant, Units 1 and 2, LAR Attachment U- Table U-1 Internal Events PRA Peer Review- Facts and Observations (F&Os), 10/24/14 BSEP 14-0101, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2014-09-0404 September 2014 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors BSEP 14-0093, Report of 10 CFR 50.59 Evaluations and Commitment Changes2014-08-14014 August 2014 Report of 10 CFR 50.59 Evaluations and Commitment Changes ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 BSEP 14-0028, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi A2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML13220A0902013-11-22022 November 2013 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A5922013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Brunswick Steam Electric Plant, Units 1 and 2, TAC Nos.: MF0975 and MF0976 ML13277A0412013-09-19019 September 2013 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML16257A4072013-05-31031 May 2013 ANP-3013(NP), Revision 0, Brunswick Unit 1 Cycle 19 Fuel Cycle Design Mellla+ Operating Domain. BSEP 13-0030, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events BSEP 13-0002, Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact2013-01-14014 January 2013 Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact ML13031A0112013-01-11011 January 2013 Engineering Information Record, Document No. 51-9196989-000, Supplemental Information for Brunswick SAFLIM3D Submittal: Impact of Assemblies Outside Existing Channel Bow Fast Fluence Gradient Database BSEP 12-0133, Document No. 51-9195058-000, Areva Input to Process Energy: Follow-Up to SAFLIM3D LAR Request for Additional Information 3, Enclosure 3 to BSEP 12-01332012-11-27027 November 2012 Document No. 51-9195058-000, Areva Input to Process Energy: Follow-Up to SAFLIM3D LAR Request for Additional Information 3, Enclosure 3 to BSEP 12-0133 BSEP 12-0127, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2012-11-27027 November 2012 Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident BSEP 12-0128, Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation2012-11-14014 November 2012 Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation ML12321A3192012-11-0101 November 2012 1000771.402NP, Revision 2, Life Extension for Core Plate Plugs at Brunswick Nuclear Plant Unit 2. ML12065A3802012-03-26026 March 2012 Request to Reinitiate Section 7 Consultation for Atlantic Sturgeon at Brunswick Steam Electric Plant, Units 1 and 2 BSEP 12-0031, Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-00312012-02-29029 February 2012 Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-0031 ML12076A0632012-02-17017 February 2012 Areva Document No. 51-9177317-000, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D Methodology, Engineering Information Record, Enclosure 8 to BSEP 12-0031 2022-06-09
[Table view] Category:Technical
MONTHYEARRA-22-0134, Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data2022-05-25025 May 2022 Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data RA-21-0176, Cycle 24 Mellla+ Eigenvalue Tracking Data2021-06-0707 June 2021 Cycle 24 Mellla+ Eigenvalue Tracking Data RA-20-0347, 10 CFR 71.95 Report on the 3-60B Cask2020-11-16016 November 2020 10 CFR 71.95 Report on the 3-60B Cask RA-19-0411, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-10-23023 October 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0338, Pressure and Temperature Limits Report for Unit Nos. 1 and 22019-08-15015 August 2019 Pressure and Temperature Limits Report for Unit Nos. 1 and 2 RA-19-0243, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-07-0202 July 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-05-29029 May 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-03-18018 March 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0100, Request for License Amendment Regarding Application of Advanced Framatome Methodologies2018-10-11011 October 2018 Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0131, Technical Requirements Manual, Revision 662018-08-13013 August 2018 Technical Requirements Manual, Revision 66 ML18249A1592018-08-13013 August 2018 Technical Requirements Manual, Revision 73 RA-18-0024, Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-05-29029 May 2018 Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report ML16287A4222016-09-26026 September 2016 FS1-0028339 Revision 1.0, Brunswick, Unit 1, Cycle 21 and Unit 2 Cycle 23 MELLLA SLMCPR Analyses with SAFLIM30 Methodology. ML18250A0032016-08-11011 August 2016 Technical Requirements Manual, Revision 63 ML18250A0022016-08-11011 August 2016 Technical Requirements Manual, Revision 70 ML16257A4112016-07-31031 July 2016 DUKE-0B21-1104-000(NP), Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus. ML16257A4062015-12-31031 December 2015 ANP-3106(NP), Revision 2, Brunswick Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM Fuel for Mellla+ Operation. ML15275A2902015-09-30030 September 2015 Areva, Inc., - ANP-3397NP, Revision 0, Brunswick, Unit 2, Atrium 11 Lead Test Assemblies Design & Licensing Summary Report. BSEP 16-0056, ANP-3108(NP), Revision 1, Applicability of Areva BWR Methods to Brunswick Extended Power Flow Operating Domain.2015-07-31031 July 2015 ANP-3108(NP), Revision 1, Applicability of Areva BWR Methods to Brunswick Extended Power Flow Operating Domain. ML16257A4082015-07-31031 July 2015 ANP-3105(NP), Revision 1, Brunswick Units 1 and 2 LOCA Break Spectrum Analysis for Atrium 10XM Fuel for Mellla+ Operation. ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 BSEP 14-0028, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi A2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML13220A0902013-11-22022 November 2013 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A5922013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Brunswick Steam Electric Plant, Units 1 and 2, TAC Nos.: MF0975 and MF0976 ML16257A4072013-05-31031 May 2013 ANP-3013(NP), Revision 0, Brunswick Unit 1 Cycle 19 Fuel Cycle Design Mellla+ Operating Domain. BSEP 13-0002, Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact2013-01-14014 January 2013 Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact ML13031A0112013-01-11011 January 2013 Engineering Information Record, Document No. 51-9196989-000, Supplemental Information for Brunswick SAFLIM3D Submittal: Impact of Assemblies Outside Existing Channel Bow Fast Fluence Gradient Database BSEP 12-0133, Document No. 51-9195058-000, Areva Input to Process Energy: Follow-Up to SAFLIM3D LAR Request for Additional Information 3, Enclosure 3 to BSEP 12-01332012-11-27027 November 2012 Document No. 51-9195058-000, Areva Input to Process Energy: Follow-Up to SAFLIM3D LAR Request for Additional Information 3, Enclosure 3 to BSEP 12-0133 ML12321A3192012-11-0101 November 2012 1000771.402NP, Revision 2, Life Extension for Core Plate Plugs at Brunswick Nuclear Plant Unit 2. ML12065A3802012-03-26026 March 2012 Request to Reinitiate Section 7 Consultation for Atlantic Sturgeon at Brunswick Steam Electric Plant, Units 1 and 2 BSEP 12-0031, Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-00312012-02-29029 February 2012 Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-0031 ML12076A0632012-02-17017 February 2012 Areva Document No. 51-9177317-000, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D Methodology, Engineering Information Record, Enclosure 8 to BSEP 12-0031 ML12076A0642012-02-17017 February 2012 Areva Document No. 51-9177315-000, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment, Enclosure 11 to BSEP 12-0031 ML12076A0852012-02-17017 February 2012 Areva Document No. 51-9177314-000, Brunswick Unit 2 Cycle 20 SLMCPR Analysis with SAFLIM3D Methodology, Enclosure 14 to BSEP 12-0031 ML12076A0862012-02-17017 February 2012 Areva Document No. 51-9177316-000, Brunswick Unit 2 Cycle 20 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment, Enclosure 17 to BSEP 12-0031 BSEP 12-0040, ANP-3061(NP), Revision 0, Brunswick, Unit 1, Cycle 19 Reload Safety Analysis.2011-12-31031 December 2011 ANP-3061(NP), Revision 0, Brunswick, Unit 1, Cycle 19 Reload Safety Analysis. ML12100A0872011-05-31031 May 2011 ANP-2989(NP), Revision 0, Brunswick, Unit 1, Thermal-Hydraulic Design Report for Atrium 10XM Fuel Assemblies. BSEP 11-0031, Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR2011-03-31031 March 2011 Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR ML1111010202011-03-24024 March 2011 Reactor Pressure Vessel Flaw Evaluation BSEP 10-0141, ANP-2978NP, Rev. 0, Areva Responses to RAIs on the Atrium 10XM Compliance Audit and Brunswick Lars.2010-12-16016 December 2010 ANP-2978NP, Rev. 0, Areva Responses to RAIs on the Atrium 10XM Compliance Audit and Brunswick Lars. BSEP 10-0118, ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-20.2010-10-12012 October 2010 ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-20. ML1019305492010-01-20020 January 2010 Impact of Tritium Leak on Public BSEP 09-0034, Enclosure 10 to BSEP 09-0034 - ANP-2771(NP), Rev. 0, Brunswick, Unit 2 Cycle 19 Reload Safety Analysis, Dated January 20092009-01-31031 January 2009 Enclosure 10 to BSEP 09-0034 - ANP-2771(NP), Rev. 0, Brunswick, Unit 2 Cycle 19 Reload Safety Analysis, Dated January 2009 ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0909702482008-07-31031 July 2008 Enclosure 4 and 6 to BSEP 09-0034 - ANP-2729(NP), Rev. 0, Brunswick, Unit 2, Thermal-Hydraulic Design Report for ATRIUM-10 Fuel Assemblies, and Areva Affidavit Withholding ANP-2727(P), Rev. 0 Form Public Disclosure ML0909702462008-06-30030 June 2008 Enclosure 7 and 9 to BSEP 09-0034 - ANP-2727(NP), Rev. 0, Brunswick, Unit 2, Cycle 19 Fuel Cycle Design, and Areva Affidavit Re Withholding ANP-2771(P), Rev. 0 from Public Disclosure BSEP 07-0102, ANP-2661 (Np), Revision 0, Brunswick Nuclear Plant New Fuel Storage Vault Criticality Safety Analysis for ATRIUM-10 Fuel.2007-09-30030 September 2007 ANP-2661 (Np), Revision 0, Brunswick Nuclear Plant New Fuel Storage Vault Criticality Safety Analysis for ATRIUM-10 Fuel. ML0728402192007-09-30030 September 2007 ANP-2642(NP), Revision 0, Brunswick Nuclear Plant Spent Fuel Storage Pool Criticality Safety Analysis for ATRIUM-10 Fuel. ML0721803722007-07-31031 July 2007 Areva Report ANP-2658(NP), Revision 0, Brunswick Unit 1 Cycle 17 Fuel Cycle Design, Enclosure 3 BSEP 07-0075, Areva Report ANP-2638NP, Revision 0, Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Enclosure 62007-07-31031 July 2007 Areva Report ANP-2638NP, Revision 0, Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Enclosure 6 2022-05-25
[Table view] |
Text
.: Progress Energy 10 CFR 50.55a JUL 0`8 2005 SERIAL: BSEP05-0079 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001
Subject:
Brunswick Steam Electric Plant, Unit No. 2 Docket No. 50-324/License No. DPR-62 Inservice Inspection Program for the Third 10-Year Interval - Refueling Outage 16 Owner's Activity Report Ladies and Gentlemen:
Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc.,
submits the enclosed American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Form OAR-1 Owner's Activity Reports for the Brunswick Steam Electric Plant (BSEP), Unit No. 2. The enclosed Form OAR-1 Owner's Activity Reports cover inspection activities being credited for the second inspection period of the third 10-year inservice inspection interval. The second period of the third 10-year interval began May 11, 2001, and ended May 10, 2005.
On August 7, 2003, a revision to 10 CFR 50.55a went into effect which incorporates, by reference, NRC Regulatory Guide 1.147, Revision 13, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1." This revision of Regulatory Guide 1.147 indicates that ASME Code Case N-532-1, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1," can be used provided the OAR-1 forms are submitted to the NRC within 90 days of the completion of the refueling outage. ASME Code Case N-532-1 requires an Owner's Activity Report Form OAR-1 to be prepared and certified upon completion of each refueling outage.
As specified by the ASME Code Case and Regulatory Guide 1.147, the Form OAR-1 Owner's Activity Report for BSEP, Unit 2 Refueling Outage 16 (i.e., B217R1) is provided in Enclosure 1. Enclosure 2 provides a copy of the Form OAR-1 Owner's Activity Report for the Unit 2 containment inspections performed in accordance with the ASME Code,Section XI, Subsections IWE and IWL, during Refueling Outage 16. Refueling Outage 16 for Unit 2 ended on April 9, 2005.
Progress Energy Carolinas. Inc.
Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461
Document Control Desk BSEP 05-0079 / Page 2 No regulatory commitments are contained in this letter. Please refer any questions regarding this submittal to Mr. Leonard R. Beller, Supervisor - Licensing/Regulatory Programs, at (910) 457-2073.
Sincerely, Edward T. ONeil Manager - Support Services Brunswick Steam Electric Plant WRM/wrm
Enclosures:
- 1. Owner's Activity Report - OAR-i Report for B217R1 Refueling Outage, Revision 0
- 2. Owner's Activity Report - OAR-i Report for B217R1 Refueling Outage Containment Inspections
Document Control Desk BSEP 05-0079 / Page 3 cc (with enclosures):
U. S. Nuclear Regulatory Commission, Region II ATTN: Dr. William D. Travers, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATIN: Mr. Eugene M. DiPaolo, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission (Electronic Copy Only)
ATTN: Ms. Brenda L. Mozafari (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Jo A. Sanford Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. Jack Given, Bureau Chief North Carolina Department of Labor Boiler Safety Bureau 1101 Mail Service Center Raleigh, NC 27699-1101
BSEP 05-0079 Enclosure 1 Owner's Activity Report - OAR-1 Report for B217R1 Refueling Outage. Revision 0
Progress Energy BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 OWNER'S ACTIVITY REPORT OAR-1 REPORT FOR B217R1 REFUELING OUTAGE REVISION 0 Prepared By: Date (,- -05 NDE / Snubber & Support Program Tanager Reviewed By: Date 4/6AL2O5
/ kepair/Replacement Program Manager Reviewed By: Date tol OS Independent Reviewr Reviewed By:
Az5W~o eist Sca AKuzhorized Nuclear Inservice Inspector Date
Revision Summary
INTRODUCTION This report represents a summary of the Inservice Inspection (ISI) activities performed at the Carolina Power and Light Company's Brunswick Steam Electric Plant (BSEP) Unit 2 during the Spring 2005 refueling outage.
The examinations and testing performed during this timeframe were for credit during the second inspection period of the Third Inspection Interval.
Examinations and testing were performed to satisfy the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Inspection Program B, 1989 Edition with no addenda.
During the refueling outage, ASME Code Category B-D and R-A components were identified as having less than 90% coverage. A relief request will be submitted prior to the end of the Inspection Interval for examination coverage.
In accordance with requirements of Code Case N-532, which has been approved for use at the Brunswick Station, enclosed is the Owners Activity Report (OAR-I Report).
FORM OAR-I OWNER'S ACTIVITY REPORT Report number _ 2-05-B217RI Owncr __Carolina lower & Light Company, P'0 Box 1551, Raleigh, North Carolina (Name and Address of Owner)
Plant _Brunswick Stcam Electric Plant, PO Box 10429, Southport, North Carolina (Name and Address of Plant)
Unit No. 2_ Commercial Servicc Datc 11/3175 . . Refueling outage no. -B217RIA_
(if applicable)
Current inspection interval -3rd (I st. 2nd, 3rd, 4th, other)
^sanbn LurrclIL
- nen2snn npr-rvl
'I-A
_______5, (I1st. 2nd, 3rd)
Edition and Addenda of Section Xl applicable to the inspection plan _1989 edition with no addenda_
Date and revision of inspection plan February 23, 2005 _ISI Program Plan revision 12 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan CERTIFICATE OF CONFORNMANCE I certify that the statements made in this Owner's Activity Report are correct and that the examinations, tests, repairs, replacements, evaluations and corrective measures represented by this report conform to the requirements of Section Xi.
Certificate of Authorization No. N( Expiration Date t'J A (if applicable)
Signed i IN9 Pr I Date (6-0s Owner or Oy r s Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1,the under signed, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of -North Carolina_ _ and employed by .. Hartford Steam Boiler of
_ Connecticut have inspected the items described in the Owner's Activity Report during the period _8/26/03 to 5/10/05 and state that to the best of my knowledge and belief, the Owner has performed all of the activities represented by this report in accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any wvarrantee, expressed or implied, concerning the tests, repairs, replacements. evaluations and corrective measures described this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for an personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions NC-1433, A.N.I.B.C._
'y" Inspector's Signature National Board, State, Province and Endorsements Date 6 6
i TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS To~talf.. ' ..
ToTot' Total Tota Examina ions.
Examinations-. Examinations Examinations Creited %):
Exa ination Rqire
. . for .Credited for Credited (%) to Date for the iCategory.-.;." .. -the Interval This Peniod for the Perio'd . Interval Remarks-(see note 1) :-- -.- . ,-,-;'_
B-A 28 0 0 32 See note 2 B-D 70 19 27 56 See note 2 B-E 46 0 0 0 See note 2 B-G-1 320 0 0 0 See note 2 B-G-2 NA 6 NA NA See note 4, 5 B-K 13 8 61 61 See note 7 B-L-2 NA NA NA NA See note 4 B-M-2 NA 3 NA NA See note 4 B-N-1 3 1 33 66 B-N-2 32 0 0 0 See note 2 B-O 8 0 0 0 See note 2 C-A 3 1 33 66 C-B 2 2 100 100 See note 6 C-C 11 6 54 72 See note 7 C-F-2 31 8 26 65 D-A 6 2 33 67 See note 7 F-A 77 30 38 . 61 R-A 56 28 50 50 See note 3
TABLE 1 NOTES The following notes correspond to the numbers referenced in Table I of the OAR-1 Report:
- 1. Examination categories B-B, B-H, B-K-I, B-N-3, B-L-1, B-M-1, C-F-1, C-G, D-B, D-C do not apply to the Brunswick Station.
Examination categories B-K, C-C and D-A reflect Code Case N-409.
- 2. Some or all examinations in this category may be deferred until the end of the inspection interval.
- 3. Examination category B-F and B-J have been subsumed by Category R-A to reflect approval of a Class 1 Risk Informed ISI Program. This was implemented with the commencement of the Second Inspection Period and the total number of examinations for the remaining periods and interval reflect Relief Request RR-27 and NRC Safety Evaluation dated 2/17/2000.
- 4. The examinations under this examination category are event related. They are only required if a subject pump or valve is disassembled during a maintenance activity.
- 5. Item number B7.80 of this category includes a requirement to examine CRD bolting if a CRD is disassembled. In accordance with relief request RR-04 which implemented Code Case N-547, there is no longer a requirement to examine this bolting.
- 6. This category has only 2 items and is covered by Relief Request RR-21.
- 7. This category reflects adoption of code case N-409 during 2nd Inspection Period.
TABLE 2 ITEMS WTH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Fla Flw o Rlevat Condition Fduiid Exam.ination Item item; ' -acDer - Scheduled Sction -XI uring ite or Number Description ':-IWA3300) : Exanmination-or:Test(Yes orNo) =
D-B D2.10 SW Flange & bolting Evaluation for continued replacement per EC service per Code Case N- No 50480 due to through- 513 wall leak D-B D2.10 Through-wall leak SW Evaluation for continued No line 2-SW-103-24-157 service per Code Case N-513 D-B D2.10 Through-wall leak SW Evaluation for continued No line 2-SW-103-30-157 service per Code Case N-513 D-B D2.10 Through-wall leak SW Evaluation for continued No line 2-SW-142-30-157 service per Code Case N-513
+ 9
- 4. 9 9
.9. 1- t t
+ 4- 9 I
___________________ 1__________ I_________ ________________________ ________________________________
TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE
- F~~aorReent' Q.Ciniin F6und"C.
Rpir, -3. .- P .Repai.,
Relciinor- e%
'6 X. . , ; Replacement
^sCIass .*;'JMeasur :.. eDescption m -iiofWork
'. . . olet Installation of 2 Repair CRD Insert line mechanical No 3/18/05 592811-01 (30-43) clamp per Code Case N-523-2 Installation of 2 Repair CRD Insert line mechanical No 3/18/05 595039-01 (3443) clamp per Code Case N-523-2 2 Repair CRD Insert line Installation of (3843) mechanical No 3/18/05 595045-01 clamp per Code Case N-523-2 2 Repair CRD Insert line Installation of (2643) mechanical No 3/18/05 595563-01 clamp per Code Case N-523-2 3 Replacement SW Piping Replacement of No 1/7/03 322150-04 (2-SW-29-6-046) flange & bolting per EC 50480 on through-wall leak 3 Repair SW Piping Repair of No 3/16/03 191267-01 (2-SW-103-24-157) through-wall leak}
3 Replacement SW Piping Replacement of No 4/20/05 545165-01 (2-SW-103-30-157) piping due to through-wall leak .
3 Replacement SW Piping Flange No 4/21/05 502255-01
___ _ I I__
(2-SW-142-30-157) replacement I
BSEP 05-0079 Enclosure 2 Owner's ActivitY Report - OAR-I Report for B217R1 Refueling Outage Containment Inspections
ATTACHMENT 1 -
Page 1 of 2 Code Case N-532 Form OAR-1, Owner's Activity Report FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number CIP-B217R1 Owner Carolina Power & Ught Company dflWa Progress Energy Carolinas, Inc.. PO Box 1551. Raleigh. North Carolina (Name and Address of Owner)
Plant Brunswick Steam Electric Plant, PO Box 10429, Southport, North Carolina (Name and Address of Plant)
Unit No. 2 Commercial Service Date November 1975 Refuelin g Outage No. B217R1 (if applicable)
Current Inspecton Interval First Containment Inspection Interval (Subsecton IWE & IWL Only)
(11", 2e, 3 d, 4, other)
Current Inspection Period 2"e Inspection Period (11",2d, 3d)
Edition and Addenda of Section XI Applicable to the Inspection Plan 1992 Edition w/ 1992 Addenda Date and Revision of Inspection Plan OBNP-TRO002 (R8-a'3Q'04)
Edition and Addenda of Section Xi Applicable to Repairs and Replacements, if different that the Inspection Plan N/A CERTIFICATE OF CONFORMANCE I certify that the statements made In this Owner's Activity Report are correct and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section Xi.
Certificate of Authorization No. N/A Expiration Date NMA n , (if applicable)
Signed Ii1 L'k Materials Proarams Sunervisor Date J S Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by Hartford Steam Boiler Inspection and Insurance Company of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, during the period 4/11/03 to 4/01/05 , and state that to the best of my knowledge and belief, the Owner has performed all of the activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures descnbed in this report. Furthermore, neither the inspector nor his employer shall be liable In any mamner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
p& a r Commissions NC-1433, AINBC rInspector's Signature National Board, State, Province and Endorsements Date__ __ _ __ _
This form (EO01 27) may be obtained for the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300 I OENP-16 I Rev. 43 @
ATTACHMENT 2 Page 2 of 2 '
Code Case N-532 Tables 1, 2, and 3 Note: This Owner's Activity Report is only applicable to the Containment Inspection Program (Subsection IWE & IWL) and does not address Class 1, 2, and 3 components.
TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited ('%) To Examination Required For Credited For Credited (s) Date For Category The Interval This Period For This Period The Interval Remarks E-A See Notes See Notes 100% 66% All components within this category were examined except those components which were insulated or submerged.
E-B N/A N/A N/A NA This Category is not being implemented as allowed by 10 CFR 50.55a(b)(2)(ix)(C).
E-C See Notes See Notes 100% 66% All components within this category were examined E-D See Notes See Notes 100% 66% All components within this category were examined E-F N/A N/A N/A WA This Category is not being implemented as allowed by 10 CFR 50.55a(b)(2)(ix)(C).
E-G See Notes See Notes 100% 66% All components within this category were examined.
E-P N/A N/A N/A N/A L-A NIA 18 100% N/A L-B N/A N/A N/A N/A The Unit 2 containment does not have a post-I_ _tensioning system.
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE
- Flaw or Relevant Condition Found Repair, During Scheduled Replacement, Section Xl Repair/
Code or Corrective Examination or Date Replacement Class Measure Item Description Description of Work Test (Yes or No) Completed Plan Number E-A 2-X-2 General Corrosion on Restored design wall thickness Yes 3/25/05 584530-01 Penetration Sleeve Exterior by welding on Interior surface.
Surfaces In accordance with 10CFR50.55a (b)(2)(ix)(A), the inaccessible areas of the containment liner which displayed evidence of degradation are addressed below.
(1) Blistering and bulging was identified during general visual examinations in 1-X-2. As a consequence of this, engineering directed inspections were conducted on the Unit 2 Personnel Airlock Penetration Sleeve 2-X-2.
Contingency Work Order 584530 was developed prior to the outage to support inspection and repair of the liner, additionally, the Specification for Containment Structures Steel Liners, Spec. 015-001 was revised to provide a minimum design wall thickness for the life of the plant. Ultrasonic measurements were taken to assess liner thickness in areas identified as bulged. The ultrasonic measurements indicated that the liner thickness in the area of the bulging was below the expected wall thickness for the liner when compared with the design drawings. Based on the inspection results from Unit 1, wastage on the exterior surface of the Drywell Personnel Airlock penetration was attributed to surface corrosion as a result of a material defect occurring during construction.
(2) Areas of the liner which were below the minimum design wall thickness were restored to the design wall thickness specified in Spec. 015-001. W/O 584530 provided instructions for this repair.
I OENP-16 I Rev. 43 I
A I I v ATTACHMENT 2 Page 2 of 2 Code Case N-532 Tables 1, 2, and 3 (3) The repair to this area is complete. Relief Request CIP-05, "Successive Examinations Following a Repair" provides for relief from conducting augmented examinations of this component.
I OENP-1 6 Rev. 43 I I lI .EP Rev 43