BSEP 04-0145, System Drawings Supporting License Renewal

From kanterella
Jump to navigation Jump to search
System Drawings Supporting License Renewal
ML043060006
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/18/2004
From: O'Neil E
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 04-0145
Download: ML043060006 (9)


Text

Progress Energy OCT 1 8 2004 SERIAL: BSEP 04-0145 10 CFR 54 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 and 50-324/License Nos. DPR-71 and DPR-62 System Drawings Supporting License Renewal

Reference:

Letter from Cornelius J. Gannon to the U. S. Nuclear Regulatory Commission (Serial: BSEP 04-0006), "Application for Renewal of Operating Licenses," dated October 18, 2004 Ladies and Gentlemen:

On October 18, 2004, Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc. (PEC), submitted an application to the Nuclear Regulatory Commission (NRC) for renewal of the operating licenses of the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2. In support of this application, drawings were prepared for the majority of mechanical systems to supplement license renewal scoping calculations and provide a visual representation of portions of mechanical systems within the scope of license renewal. The drawings were developed using existing system flow diagrams, where available, and they have been highlighted to show the system boundaries associated with fulfilling one or more system-intended functions as discussed in 10 CFR 54.4(b).

These drawings are not part of the official application for license renewal; however, PEC is making them available to the NRC staff as additional information to support a more efficient review.

The enclosure to this letter contains an index of drawings supporting BSEP license renewal. One set of the referenced system drawings is being provided to the Document Control Desk, three sets are being provided to NRR (i.e., Mr. S. K. Mitra, the License Renewal Project Manager for BSEP), and one set is being provided to the Region II, Regional Administrator.

Progress Energy Carolinas, Inc.

Brunswick Nuclear Plant P.O. Box 10429 Southport, NC 28461

Document Control Desk BSEP 04-0145 / Page 2 Please refer any questions regarding this submittal to Mr. Mike Heath, Supervisor - License Renewal, at (910) 457-3487.

Sincerely, Edward T. ONeil Manager - Support Services Brunswick Steam Electric Plant MAT/mat

Enclosure:

License Renewal System Boundary Drawing Index

Document Control Desk BSEP 04-0145 / Page 3 cc U. S. Nuclear Regulatory Commission, Region II ATTN: Dr. William D. Travers, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 (w/Enclosure and 1 set of boundary drawings)

U. S. Nuclear Regulatory Commission ATTN: Mr. Eugene M. DiPaolo, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 (w/o Enclosure)

U. S. Nuclear Regulatory Commission ATTN: Mr. S. K. Mitra (Mail Stop OWFN 1 IFI) 11555 Rockville Pike Rockville, MD 20852-2738 (wfEnclosure and 3 sets of boundary drawings)

U. S. Nuclear Regulatory Commission ATTN: Mr. Richard L. Emch (Mail Stop OWFN 1 IFI) 11555 Rockville Pike Rockville, MD 20852-2738 (w/o Enclosure)

U. S. Nuclear Regulatory Commission (Electronic Copy Only)

ATTN: Ms. Brenda L. Mozafari (Mail Stop OWFN 8G9) 11555 Rockville Pike Rockville, MD 20852-2738 (w/o Enclosure)

THIS PAGE IS IN REFERENCE TO THE LICENSE RENEWAL SYSTEM BOUNDARY DRAWINGS FOR BRUNSWICK STEAM ELECTRIC PLANT, U

UNITS.1 & 2 DRAWINGS WERE SCANNED, ADDED TO ADAMS AND INCLUDED IN THE ADAMS PACKAGE, WITH THE TRANSMITTAL LETTER.

REFERENCE, THE SUBSEQUENT INDICES IMMEDIATELY FOLLOWING THIS PAGE/IMAGE

BSEP 04-0145 Enclosure Page 1 of 5 License Renewal System Boundary Drawing Index LR Flow Diagram Legend BSEP Unit 1 BSEP Unit 2 BSEP Common License Renewal Drawing Index None None D-02519-LR. Sheet 1,2,3 Reactor Vessel, Internals, and Reactor Coolant System BSEP Unit I l

BSEP Unit 2 BSEP Common Reactor Vessel and Internals D-25020-LR, Sheet 3A, 3B, 3C D-02520-LR, Sheet 3A, 3B, 3C None D-25021-LR, Sheet lA, lB. IC D-02521-LR, Sheet lA, lB.C IC D-25022-LR, Sheet 2A, 2B, 2C D-02522-LR, Sheet 2A, 2B, 2C Neutron Monitoring System None None None Reactor Manual Control System None D-02516-LR, Sheet IA, lB None Control Rod Drive Hydraulic System D-25016-LR, Sheet IA, IB D-02516-LR, Sheet IA, lB Non D-25017-LR, Sheet 2A, 2B D-02517-LR, Sheet 2A, 2B Reactor Coolant Recirculation System D-25018-LR, Sheet IA, lB D-02518-LR, Sheet IA,11 None D-25048-LR, Sheet 2A, 2B1 D-02548-LR, Sheet 2A, 2B Engineered Safety Features BSEP Unit 1 BSEP Unit 2 BSEP Common Residual Heat Removal D-25025-LR, Sheet lA,lB l D-02525-LR, Sheet IA,lB 1 D-25026-LR, Sheet 2A, 2Bl D-02526-LR, Sheet 2A, 2Br Containment Atmosphere Control (CAC) System D-25015-LR, Sheet IA, lB, IC, ID D-02515-LR, Sheet IA, lB, IC, ID T D-02560-LR, Sheet 2A D-72018-LR D-07218-LR D-73026-LR, Sheet 1, 2 D-07326-LR, Sheet 1, 2 High Pressure Coolant Injection (HPCI) System D-25023-LR, Sheet 1, 2 l D-02523-LR, Sheet 1, 2 None Automatic Depressurization System D-25021-LR, Sheet lA, lBl D-02521-LR, Sheet lA, lB None Core Spray (CS) System D-25024-LR, Sheet 1, 2 D-02524-LR, Sheet 1, 2 l None Standby Gas Treatment System F-40073-LR, Sheet 3 lF-04073-LR, Sheet 3 T D-04104-LR F-02314-LR

BSEP 04-0145 Enclosure Page 2 of 5 Engineered Safety Features (continued)

BSEP Unit 1 l

BSEP Unit 2 BSEP Common Standby Liquid Control System D-25047-LR D-02547-LR None HVAC Control Building None None F-04080-LR, Sheetl, 2 Reactor Protection System None None None Auxiliary Systems BSEP Unit 1 BSEP Unit 2 BSEP Common Reactor Water Cleanup System D-25027-LR, Sheet lA, lB D-02527-LR, Sheet lA, IB None F-25028-LR, Sheet 2A F-02528-LR, Sheet 2A Reactor Core Isolation Cooling System D-25029-LR, Sheet 1, 2 l D-02529-LR, Sheet 1.2 None Reactor Building Sampling System D-70070-LR, Sheet 1, 2 D-07070-LR, Sheet 1, 2 None Post-Accident Sampling System D-73027-LR, Sheet 1 D-07327-LR, Sheet 1 None Circulating Water System None None None Screen Wash Water System D-20042-LR D-02042-LR None Service Water System D-20034-LR, Sheet 2 D-02034-LR, Sheet 1 D-02274-LR, Sheetl, 2 D-20041-LR, Sheet 1, 2 D-02041-LR, Sheet 1, 2 D-25037-LRRSheet i,

2 D-02537-LR,oSheet Cl 2 Reactur Building Closed Cooling Water System D-25038-LRNSheet, 2

D-02538-RoSheete, 2 None D-25041-LR-D-02541-LR Turbine Building Closed Cooling Water System None I None I None

BSEP 04-0145 Enclosure Page 3 of 5 Auxiliary Systems (continued)

BSEP Unit 1 BSEP Unit 2 BSEP Common Diesel Generator System Diesel Fuel Oil System None l None l D-02268-LR, Sheet IA, lB D-02269-LR, Sheet 2A, 2B Diesel Lube Oil System None l None l D-02270-LR, Sheet IA, lB D-0227 I -LR, Sheet 2A, 2B Diesel Jacket Water System None None D-02272-LR, Sheet IA, lB D-02273-LR, Sheet 2A, 2B DG Service Water System None None D-02274-LR, Sheet 1 2 DG Starting Air System None I None I D-02265-LR, Sheet IA, lB D-02266-LR, Sheet 2A, 2B DG Intake/Exhaust System None None D-02267-LR, Sheet 1, 2 Heat Tracing System None None F-02586-LR, Sheet I Instrument Air System D-70007-LR, Sheet I D-07007-LR. Sheet I F-02587-LR. Sheet 2 D-70029-LR, Sheet 2A, 2B D-07029-LR, Sheet 2A, 2B D-70077-LR, Sheet 3A, 3B D-07077-LR, Sheet 3A, 3B D-72006-LR, Sheet 4 D-07206-LR, Sheet 4 D-72009-LR D-07209-LR, Sheet 6 D-73068-LR, Sheet 1 D-07368-LR Service Air D-25042-LR D-02542-LR None Pneumatic Nitrogen System None l None D-02494-LR, Sheet 1 Fire Protection System D-29099-LR, Sheet 1, 2 D-02043-LR, Sheet I D-02057-LR, Sheet 2A, 2B D-02299-LR D-02058-LR, Sheet 3A, 3B D-02301-LR D-02302-LR D-02303-LR, Sheet 1, 2 D-02304-LR D-04106-LR F-02315-LR, Sheet 1 Fuel Oil System None None D-02026-LR

BSEP 04-0145 Enclosure Page 4 of 5 Auxiliary Systems (continued)

BSEP Unit I BSEP Unit 2 BSEP Common Radioactive Floor Drains System D-25043-LR, Sheet lB D-02543-LR, Sheet IB None D-25044-LR. Sheet 2 D-02544-LR D-25045-LR, Sheet 3B D-02545-LR, Sheet 3B D-25046-LR D-02546-LR D-02533-LR. Sheet 2 Radioactive Equipment Drains System D-25043-LR, Sheet IA D-02543-LR, Sheet IA, lB None D-25045-LR, Sheet 3A D-02545-LR, Sheet 3A D-02531-LR. Sheet I Makeup Water Treatment System D-25030-LR, Sheet 1, 2 D 02530-LR, Sheet 1, 2 D-02040-LR, Sheet IA, IB D-25043-LR, Sheet IA, lB D-02543-LR, Sheet IA, lB D-02057-LR, Sheet 2B D-25044-LR, Sheet 2 D-02544-LR D-04035-LR, Sheet 2 Chlorination System None None None Potable Water System None None D-04035-LR, Sheet 2 Process Radiation Monitoring System None lNone None Area Radiation Monitoring System None lNone None Liquid Waste Processing System D-25043-LR, Sheet IA, IB D-02543-LR, Sheet IA, IB D-02492-LR D-25044-LR, Sheet 2 D-02544-LR, Sheet 2 D-02534-LR, Sheet 1, 2 D-25045-LR, Sheet 3A, 3B D-02545-LR, Sheet 3A, 3B D-25046-LR D-02546-LR I

Spent Fuel System None None J None Fuel Pool Cooling and Cleanup System D-23007-LR D-02307-LR None D-25026-LR, Sheet 2B D-02526-LR, Sheet 2B D-25049-LR, Sheet IA, lB D-02549-LR, Sheet IA, lB HVAC Diesel Generator Building None None D-04101-LR HVAC Reactor Building F-40073-LR, Sheet 1, 2 F-04073-LR, Sheet 1, 2 None D40056-LR D-04056-LR HVAC Service Water Intake Structure None l None None HVAC Turbine Building None None None

BSEP 04-0145 Enclosure Page 5 of 5 Auxiliary Systems (continued)

BSEP Unit 1 BSEP Unit 2 BSEP Common HVAC Radwaste Building None None None Torus Drain System D-26098-LR D-02698-LR None Civil Structure Auxiliary Systems None None None Non-Contaminated Water Drainage System None I None I None Steam and Power Conversion Systems BSEP Unit I BSEP Unit 2 BSEP Common Main Steam System D-20020-LR, Sheet 1, 2 D-02020-LR, Sheet 1,2 None D-25021-LR, Sheet IA, IB D-02521-LR, Sheet IA, IB D-20028-LR D-02028-LR Extraction Steam System None None None Moisture Separator Reheater Drains and Reheat Steam System None None None Auxiliary Boiler None None D-02021-LR Feedwater System D-25021-LR, Sheet IA, lB, IC D-02521-LR, Sheet IA, IB, IC None Heater Drains and Miscellaneous Vents and Drains D-20028-LR D-02028-LR None Condensate System D-20030-LR, Sheet lB D-02030-LR, Sheet lB D-02040-LR, Sheet IA, lB D-20028-LR D-02028-LR Turbine Building Sampling System D-20020-LR, Sheet 1 I D-02020-LR, Sheet 1 None Main Condenser Gas Removal System D-25043-LR, Sheet 1B I D-02543-LR, Sheet lB None Turbine Electro-Hydraulic Control System None I None None Turbine Generator Lube Oil System None None None Stator Cooling System None None None Hydrogen Seal Oil None None None