Similar Documents at Cook |
---|
Category:Letter type:AEP
MONTHYEARAEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2022-10-12012 October 2022 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2022-30, Core Operating Limits Report2022-10-0606 October 2022 Core Operating Limits Report AEP-NRC-2022-51, Evacuation Time Estimate Analysis2022-08-31031 August 2022 Evacuation Time Estimate Analysis AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-35, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2022-08-18018 August 2022 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2022-47, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 472022-08-0202 August 2022 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 47 AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2022-29, Annual Radiological Environmental Operating Report for 20212022-05-13013 May 2022 Annual Radiological Environmental Operating Report for 2021 AEP-NRC-2022-15, CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations2022-05-0404 May 2022 CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations AEP-NRC-2022-28, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report AEP-NRC-2022-27, Annual Report of Individual Monitoring2022-04-27027 April 2022 Annual Report of Individual Monitoring AEP-NRC-2022-05, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-04-0707 April 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements AEP-NRC-2022-18, Annual Report of Property Insurance2022-03-28028 March 2022 Annual Report of Property Insurance AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2022-12, Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source2022-03-0202 March 2022 Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source AEP-NRC-2022-02, Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-02-0101 February 2022 Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2022-01, Quality Assurance Program Change Request for Internal Audit Frequency2022-02-0101 February 2022 Quality Assurance Program Change Request for Internal Audit Frequency AEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-67, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2021-12-0909 December 2021 Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation AEP-NRC-2021-66, 2020 Annual Radioactive Effluent Release Report Correction2021-11-17017 November 2021 2020 Annual Radioactive Effluent Release Report Correction AEP-NRC-2021-65, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2021-11-0808 November 2021 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-47, Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2021-11-0808 November 2021 Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2021-60, Registration of Dry Spent Fuel Storage Cask2021-10-12012 October 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-55, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2021-09-20020 September 2021 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-48, Cycle 26 Core Operating Limits Report, Revision 02021-09-14014 September 2021 Cycle 26 Core Operating Limits Report, Revision 0 AEP-NRC-2021-53, Registration of Dry Spent Fuel Storage Cask2021-08-26026 August 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-50, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2021-08-25025 August 2021 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report 2024-01-08
[Table view] Category:License-Operator License Exam
MONTHYEARML16340B7942016-12-0202 December 2016 DC Cook 2016 Proposed Operating Test CR-SIM JPMs ML14275A1662014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Proposed Written Examination ML14275A1422014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Proposed Simulator Scenarios ML14275A1222014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Proposed In-Plant JPMs ML14275A0842014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Proposed Admin JPMs ML14275A0492014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Porposed Control Room JPMs ML14274A2602014-08-0101 August 2014 2014 DC Cook Initial License Examination Form ES-401-2 and Form Es 401-3 ML14274A2562014-08-0101 August 2014 2014 DC Cook Initial License Examination Proposed Scenario D-1 Sheets AEP-NRC-2013-62, Response to Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations2013-08-0505 August 2013 Response to Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations 2016-12-02
[Table view] Category:Draft
MONTHYEARML16340B7942016-12-0202 December 2016 DC Cook 2016 Proposed Operating Test CR-SIM JPMs ML15150A0352015-07-0808 July 2015 Memorandum Documenting Withdrawal and Planned Denial of Emergency License Amendment Request to Extend the Allowed Outage Time for an Emergency Diesel Generator ML14275A1662014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Proposed Written Examination ML14275A1422014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Proposed Simulator Scenarios ML14275A1222014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Proposed In-Plant JPMs ML14275A0842014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Proposed Admin JPMs ML14275A0492014-08-0101 August 2014 2014 DC Cook Nuclear Power Plant Initial License Examination Porposed Control Room JPMs ML14274A2602014-08-0101 August 2014 2014 DC Cook Initial License Examination Form ES-401-2 and Form Es 401-3 ML14274A2562014-08-0101 August 2014 2014 DC Cook Initial License Examination Proposed Scenario D-1 Sheets AEP-NRC-2013-62, Response to Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations2013-08-0505 August 2013 Response to Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations ML0511105402005-04-15015 April 2005 Comments on Plant Draft Safety Evaluation for the Conversion to Improved Technical Specifications ML0312600102003-05-0606 May 2003 Draft Safety Evaluation, Ice Condenser Utility Group Topical Report No. ICUG-001, Revision O ML0311101442003-04-18018 April 2003 DC Cook, Unit 2, Safety Evaluation, Review of Draft of Safety Evaluation for Measurement Uncertainty Recapture Power Uprate 2016-12-02
[Table view] |
Text
INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWERO One Cook Place Bridgman, Ml 49106 A unit of American Electric Power IndianaMichiganPower.com AEP-NRC-2013-62 August 5, 2013 10 CFR 50.4 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 RESPONSE TO REGULATORY ISSUE
SUMMARY
2013-06 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," dated June 7, 2013, requests licensees to update examination schedules and applicant estimates for calendar years 2015 through 2018.
Indiana Michigan Power Company, the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, is providing, as an enclosure to this letter, NRC Form 536, "Operator Licensing Examination Data," which contains the details of CNP's examination schedule as requested. CNP has fewer applicants than originally planned for the July 2014 class; this is the only change since our previous submittal, AEP-NRC-2012-52, "Response to Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations," dated July 23, 2012.
There are no commitments included in this submittal. Should you have any questions, please contact Ron Sieber, Training Manager at (269) 466-3439.
Sincerely, Joel P. Gebbie Site Vice President KMH/db
Enclosure:
NRC Form 536, Operator Licensing Examination Data 00ý)
0 (UL
U. S. Nuclear Regulatory Commission AEP-NRC-2013-62 Page 2 c: J. R. Kweiser- NRC Region III NRC Resident Inspector H. Peterson - NRC Region III T. J. Wengert - NRC Washington DC
ENCLOSURE TO AEP NRC 2013-62 NRC FORM 536 OPERATOR LICENSING EXAMINATION DATA
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (1-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemete-EXAMINATION DATA mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Donald C. Cook Nuclear Plant 3 One Cook Place Bridgman, M1 49106 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2014 CY 2016 CY 2018 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 1 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2016 CY 2018 CY NUMBER OF REACTOR OPERATORS 9 10 10 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 6 6 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 07/21/2014 07/11/2016 07/23/2018 ALTERNATE DATE 07/28/2014 07/18/2016 07/30/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 16 CANDIDATES NRC FORM 536 (09-2011)