| Q | CCA | Title |
---|
05000483/FIN-2010005-03 | 2010Q4 | P.1 | Failure to Enter Condition Adverse to Quality Associated with Emergency Diesel Generator Jacket Water Keep Warm Pump into the Corrective Action Program |
05000483/FIN-2010005-02 | 2010Q4 | H.2 | Inadequate, Untimely Corrective Actions for a Containment Spray System Condition Adverse to Quality |
05000483/FIN-2010005-01 | 2010Q4 | H.14 | Failure to Follow Operability Determination Procedure |
05000483/FIN-2010006-03 | 2010Q4 | H.9 | Failure to Follow the Corrective Action Program procedure |
05000483/FIN-2010006-02 | 2010Q4 | H.6 | Failure to Correct Repetitive Failures in Steam Generator Atmospheric Dump Valves in a Timely Manner |
05000483/FIN-2010006-01 | 2010Q4 | H.6 | Failure to Correct Degraded Conditions in Essential Service Water System in a Timely Manner |
05000483/FIN-2011006-03 | 2011Q1 | | Inadequate Residual Heat Removal Flow Alarm Setpoint |
05000483/FIN-2011006-02 | 2011Q1 | | Failure to Adequately Design the Emergency Diesel Generator Ground Fault Protection Circuitry |
05000483/FIN-2011002-02 | 2011Q1 | | Failure to Report Inoperability of Class 1E Electrical Equipment for a Period Greater than Allowed by the Plant\'s Technical Specifications |
05000483/FIN-2011006-01 | 2011Q1 | | Failure to Update the Updated Safety Analysis Report |
05000483/FIN-2011002-01 | 2011Q1 | H.14 | Failure to Document Reasonable Expectation of Operability for Equipment Supported by the Class 1E Air Conditioning Units |
05000483/FIN-2011002-03 | 2011Q1 | | Containment Spray Test Procedure Potentially Creates an Unanalyzed Condition |
05000483/FIN-2011002-04 | 2011Q1 | P.1 P.1(a) | Scaffolding Installation Inadequacy |
05000483/FIN-2011003-03 | 2011Q2 | | Failure to Adequately Establish Test Program for Isolation Valves is Post-LOCA Recirculation Flowpath |
05000483/FIN-2011003-01 | 2011Q2 | P.2 | Failure to Maintain an Adequate Flooding Analysis for Room 3101 |
05000483/FIN-2011003-04 | 2011Q2 | H.7 | Failure to Verify Recipients License Conditions Prior to Shipping Special Nuclear Material |
05000483/FIN-2011003-06 | 2011Q2 | H.12 | Failure to Correctly Implement a Plant Safety System Test Procedure |
05000483/FIN-2011003-02 | 2011Q2 | | Failure to Analyze Refueling Water Storage Tank Level Transmitters for High-Energy Line Break |
05000483/FIN-2011003-05 | 2011Q2 | | Failure to Periodically Update the Final Safety Analysis Report |
05000483/FIN-2011007-06 | 2011Q2 | H.5 | Inadequate Extent of Cause Results in Missed Safety-Related Pump Overhaul |
05000483/FIN-2011007-05 | 2011Q2 | H.14 | Failure to Establish Preventative Maintenance Schedule to Protect Safety-Related Equipment from Undetected Degraded Conditions |
05000483/FIN-2011007-04 | 2011Q2 | | Failure to Calculate and Implement Conservative Safety Related Equipment Oil Leakage Operability Criteria |
05000483/FIN-2011007-03 | 2011Q2 | P.2 | Failure to Follow Procedure Results in Inadequate Past Operability Determination |
05000483/FIN-2011007-02 | 2011Q2 | H.8 | Failure to Follow Procedure for Turbine-Driven Auxiliary Feedwater Pump Postmaintenance Testing |
05000483/FIN-2011007-01 | 2011Q2 | H.8 | Failure to Follow Procedure in the Establishment of a Turbine-Driven Auxiliary Feedwater Pump Postmaintenance Test Procedure |
05000483/FIN-2011404-02 | 2011Q3 | H.10 | Security |
05000483/FIN-2011004-01 | 2011Q3 | H.5 | Failure to Correctly Implement Plant Maintenance Procedures |
05000483/FIN-2011004-02 | 2011Q3 | P.1 | Failure to Evaluate Breaker Relay Settings Results in Partial Loss of Station Blackout Response Capability |
05000483/FIN-2011402-01 | 2011Q3 | H.5 | Security |
05000483/FIN-2011402-02 | 2011Q3 | H.2 | Security |
05000483/FIN-2011404-01 | 2011Q3 | | Security |