05000483/FIN-2011002-04
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Scaffolding Installation Inadequacy |
| Description | The inspectors identified a noncited violation of Technical Specification 5.4.1.a for failure to properly implement Procedure MDP-ZZ-S0001, Scaffolding Installation and Evaluation, Revision 26, when scaffolding was erected near or in contact with equipment in safety-related structures. On February 8 and March 16, 2011, the inspectors identified two locations where scaffold poles and a scaffold pin were less than the procedure required 1 inch from the auxiliary building vent line, the Train B emergency diesel lube oil drain line, and also essential service water system piping in the Train B diesel room. This issue was entered into the licensees corrective action program as Callaway Action Request 201102091. The deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. The finding was associated with the Mitigating Systems Cornerstone. Using Manual Chapter 0609.04, Phase 1 Initial Screening and Characterization of Findings, the issue is determined to have very low safety significance because the finding is not a design or qualification issue confirmed to result in a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of nontechnical specification equipment; and did not screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The inspectors determined that the cause of the finding has a crosscutting aspect in the area of problem identification and resolution associated with the component of corrective action program because the licensee did not have a low threshold for identifying scaffold issues P.1(a). |
| Site: | Callaway |
|---|---|
| Report | IR 05000483/2011002 Section 4OA2 |
| Date counted | Mar 31, 2011 (2011Q1) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | D Dumbacher P Elkmann G Miller J Groom |
| CCA | P.1, Identification |
| INPO aspect | PI.1 |
| ' | |