Jnteigy Entergy Operations, Inc.

RusSeW\AR 72802 Tel 479 858 6879 2CAN1 11002 November 12, 2010 Mr. Gabriel Apger, Chief Examiner U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125

SUBJECT:

INITIAL EXAMINATION Outline Submittal for ANO, Unit 2 (CE)

Dear Mr. Apger,

Included in this package are the Examination Outline materials for the Arkansas Nuclear One Unit 2 Initial Examination scheduled for January/February 2011. The written examination is scheduled for January 28, 2011 and the operating portion of the exam is scheduled for the week of January 31, 2011. Included on the electronic storage drive are all the relevant forms per NUREG-1 021, Revision 9 Supplement 1 for the outline submittal.

These materials shall be withheld from public disclosure until the examination is complete.

Please call me at 479-858-6879 if you have any questions.

Sincerely, Clay M. Simpson Facility Representative Arkansas Nuclear One Superintendent, Unit Two Operations Training Attachments cc w/o attachment: K. Jones B. Coble S. Cotton D. Lacy J. Luther J. Wright R. Martin Licensing R. Byford ANO-DCC

ES-401 PWR Examination Outline Form ES-401-2 Facili ty: ANO Unit 2 2011 NRC Exam Date of Exam: 01/28/2011 RO K/A Category Points SRO-Only Points Tier Group K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G* Total A2 G* Total

1. Emergency 1 3 3 3 3 3 3 18 N/A N/A Abnormal Plant 2 2 2 1 2 1 1 9 evolutions Tier Totals 5 5 4 5 4 4 27
2. Plant Systems 1 3 2 3 3 2 2 3 3 2 2 3 28 2 1 1 1 1 0 1 1 1 1 1 1 10 Tier Totals 4 3 4 4 2 3 4 4 3 3 4 38
3. Generic Knowledge and Abilities Categories 1 2 3 4 1 2 3 4 2 3 3 2 10 Note: 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the Tier Totals in each K/A category shall not be less than two).
2. The point total for each group and tier in the proposed outline must match that specified in the table.

The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.

3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate K/A statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.

7.* The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable K/As.

8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note
  1. 1 does not apply). Use duplicate pages for RO and SRO-only exams.
9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

ES-401, 21 of 33

ES-401 2 Form ES-401-2 PWR Examination Outline Emergency and Abnormal Evolutions - Tier 1/Group 1 (RO)

E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G K/A Topic(s) Q IR #

000007 Reactor Trip - X EK1.03 - Knowledge of the 1 3.7 1 Stabilization - Recovery / 1 operational implications of the following concepts as they apply to the reactor trip: - Reasons for closing the main turbine governor valve and the main turbine stop valve after a reactor trip 000008 Pressurizer Vapor Space X AK2.03 - Knowledge of the 2 2.5 1 Accident / 3 interrelations between the Pressurizer Vapor Space Accident and the following: - Controllers and positioners 000009 Small Break LOCA / 3 X EK1.02 - Knowledge of the 3 3.5 1 operational implications of the following concepts as they apply to the small break LOCA: - Use of steam tables 000011 Large Break LOCA / 3 X 2.4.20 - Emergency Procedures/Plan - 4 3.8 1 Knowledge of operational implications of EOP warnings, cautions, and notes.

000015/000017 RCP X AK2.10 - Knowledge of the 5 2.8 1 Malfunctions / 4 interrelations between the Reactor Coolant Pump Malfunctions and the following: - RCP indicators and controls 000022 Loss of Rx Coolant X AK3.04 - Knowledge of the reasons 6 3.2 1 Makeup / 2 for the following responses as they apply to the Loss of Reactor Coolant Pump Makeup: - Isolating letdown 000025 Loss of RHR System / 4 X AK3.03 - Knowledge of the reasons 7 3.9 1 for the following responses as they apply to the Loss of Residual Heat Removal System: - Immediate actions contained in EOP for Loss of RHRS 000027 Pressurizer Pressure X AA1.04 - Ability to operate and/or 8 3.9 1 Control System Malfunction / 3 monitor the following as they apply to the Pressurizer Pressure Control Malfunctions: - Pressure recovery, using emergency-only heaters 000029 ATWS / 1 X EA2.08 - Ability to determine and 9 3.4 1 interpret the following as they apply to a ATWS: - Rod bank step counters and RPI 000038 Steam Gen. Tube X 2.4.47 - Emergency Procedures/Plan - 10 4.2 1 Rupture / 3 Ability to diagnose and recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.

ES-401, 22 of 33

ES-401 2 Form ES-401-2 PWR Examination Outline Emergency and Abnormal Evolutions - Tier 1/Group 1 (RO)

E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G K/A Topic(s) Q IR #

000040 Steam Line Rupture - X AK2.01 - Knowledge of the 11 2.6 1 Excessive Heat Transfer / 4 interrelations between the Steam Line Rupture and the following: - Valves 000054 Loss of Main Feedwater X AA1.03 - Ability to operate and/or 12 3.5 1

/4 monitor the following as they apply to the Loss of Main Feedwater (MFW): -

AFW auxiliaries, including oil cooling water supply 000055 Station Blackout / 6 X EK1.02 - Knowledge of the 13 4.1 1 operational implications of the following concepts as they apply to the Station Blackout: - Natural circulation cooling 000056 Loss of Off-site Power / 6 X AA1.07 - Ability to operate and/or 14 3.2 1 monitor the following as they apply to the Loss of Offsite Power: - Service water pump 000057 Loss of Vital AC Inst. X AA2.18 - Ability to determine and 15 3.1 1 Bus / 6 interpret the following as they apply to the Loss of Vital AC Instrument Bus: -

The indicator, valve, breaker, or damper position which will occur on a loss of power 000058 Loss of DC Power / 6 X 2.2.12 - Equipment Control - 16 3.7 1 Knowledge of surveillance procedures.

000062 Loss of Nuclear Svc X AK3.04 - Knowledge of the reasons 17 3.5 1 Water / 4 for the following responses as they apply to the Loss of Nuclear Service Water: - Effect on the nuclear service water discharge flow header of a loss of CCW 000065 Loss of Instrument Air / 8 X AA2.08 - Ability to determine and 18 2.9 1 interpret the following as they apply to the Loss of Instrument Air: - Failure modes of air-operated equipment K/A Category Totals: 3 3 3 3 3 3 Group Point Totals: 18 ES-401, 22 of 33

ES-401 3 Form ES-401-2 PWR Examination Outline Emergency and Abnormal Evolutions - Tier 1/Group 2 (RO)

E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G K/A Topic(s) Q IR #

000032 Loss of Source Range X AK3.01 - Knowledge of the reasons 19 3.2 1 NI / 7 for the following responses as they apply to the Loss of Source Range Nuclear Instrumentation: - Startup termination on source-range loss 000037 Steam Generator Tube X AA1.05 - Ability to operate and/or 20 3.3 1 Leak / 3 monitor the following as they apply to the Steam Generator Tube Leak: -

Radiation monitor for auxiliary building exhaust processes 000060 Accidental Gaseous X AA2.05 - Ability to determine and 21 3.7 1 Radwaste Rel. / 9 interpret the following as they apply to the Accidental Gaseous Radwaste Release: - That the automatic safety actions have occurred as a result of a high ARM system signal 000061 ARM System Alarms / 7 X 2.1.20 - Conduct of Operations - 22 4.6 1 Ability to interpret and execute procedure steps.

000068 Control Room Evac. / 8 X AK2.02 - Knowledge of the 23 3.7 1 interrelations between the Control Room Evacuation and the following: -

Reactor trip system 000069 Loss of CTMT Integrity / X AK1.01 - Knowledge of the 24 2.6 1 5 operational implications of the following concepts as they apply to Loss of Containment Integrity: - Effect of pressure on leak rate 000074 Inad. Core Cooling / 4 X EA1.15 - Ability to operate and/or 25 3.9 1 monitor the following as they apply to an Inadequate Core Cooling: - Hot-leg and cold-leg temperature recorders CE/A11 RCS Overcooling - PTS X EK2.1 - Knowledge of the 26 3.2 1

/4 interrelations between the (RCS Overcooling) and the following: -

Components, and functions of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features CE/A13 Natural Circ. / 4 X EK1.2 - Knowledge of the operational 27 3.2 1 implications of the following concepts as they apply to the (Natural Circulation Operations): - Normal, abnormal and emergency operating procedures associated with (Natural Selection Operations)

K/A Category Totals: 2 2 1 2 1 1 Group Point Totals: 9 ES-401, 23 of 33

ES-401 4 Form ES-401-2 PWR Examination Outline Plant Systems - Tier 2/Group 1 (RO)

System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A3 G K/A Topic(s) Q IR #

003 Reactor Coolant Pump X A2.03 - Ability to (a) 28 2.7 1 predict the impacts of the following malfunctions or operations on the RCPS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Problems associated with RCP motors, including faulty motors and current, and winding and bearing temperature problems 004 Chemical and Volume X 2.1.28 - Conduct of 29 4.1 1 Control Operations - Knowledge of the purpose and function of major system components and controls.

004 Chemical and Volume X K3.05 - Knowledge of the 30 3.8 1 Control effect that a loss or malfunction of the CVCS will have on the following: - PZR LCS 005 Residual Heat X K3.06 - Knowledge of the 31 3.1 1 Removal effect that a loss or malfunction of the RHRS will have on the following: - CSS 006 Emergency Core X K6.10 - Knowledge of the 32 2.6 1 Cooling effect of a loss or malfunction of the following will have on the ECCS: - Valves 007 Pressurizer X A2.02 - Ability to (a) 33 2.6 1 Relief/Quench Tank predict the impacts of the following malfunctions or operations on the PRTS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Abnormal pressure in the PRT ES-401, 24 of 33

ES-401 4 Form ES-401-2 PWR Examination Outline Plant Systems - Tier 2/Group 1 (RO)

System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A3 G K/A Topic(s) Q IR #

008 Component Cooling X A4.02 - Ability to 34 2.5 1 Water manually operate and/or monitor in the control room: - Filling and draining operations of the CCWS including the proper venting of the components 008 Component Cooling X K4.09 - Knowledge of 35 2.7 1 Water CCWS design feature(s) and/or interlock(s) which provide for the following: -

The "standby" feature for the CCW pumps 010 Pressurizer Pressure X K5.02 - Knowledge of the 36 2.6 1 Control operational implications of the following concepts as they apply to the PZR PCS: - Constant enthalpy expansion through a valve 012 Reactor Protection X K5.01 - Knowledge of the 37 3.3 1 operational implications of the following concepts as they apply to the RPS: - DNB 013 Engineered Safety X A2.02 - Ability to (a) 38 4.3 1 Features Actuation predict the impacts of the following malfunctions or operations on the ESFAS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Excess steam demand 022 Containment Cooling X A1.04 - Ability to predict 39 3.2 1 and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the CCS controls including: - Cooling water flow ES-401, 24 of 33

ES-401 4 Form ES-401-2 PWR Examination Outline Plant Systems - Tier 2/Group 1 (RO)

System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A3 G K/A Topic(s) Q IR #

026 Containment Spray X K4.08 - Knowledge of 40 4.1 1 CSS design feature(s) and/or interlock(s) which provide for the following: -

Automatic swapover to containment sump suction for recirculation phase after LOCA (RWST low-low level alarm) 026 Containment Spray X 2.4.11 - Emergency 41 4.0 1 Procedures/Plan -

Knowledge of abnormal condition procedures.

039 Main and Reheat X K1.04 - Knowledge of the 42 3.1 1 Steam physical connections and/or cause-effect relationships between the MRSS and the following systems: - RCS temperature monitoring and control 059 Main Feedwater X A3.04 - Ability to monitor 43 2.5 1 automatic operation of the MFW System, including: - Turbine driven feed pump 059 Main Feedwater X A1.07 - Ability to predict 44 2.5 1 and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the MFW System controls including: - Feed Pump speed, including normal control speed for ICS 061 Auxiliary/Emergency X A3.01 - Ability to monitor 45 4.2 1 Feedwater automatic operation of the AFW System, including: - AFW startup and flows 061 Auxiliary/Emergency X K6.02 - Knowledge of the 46 2.6 1 Feedwater effect of a loss or malfunction of the following will have on the AFW System components: - Pumps 062 AC Electrical X A4.02 - Ability to 47 2.5 1 Distribution manually operate and/or monitor in the control room: - Remote racking in and out of breakers ES-401, 24 of 33

ES-401 4 Form ES-401-2 PWR Examination Outline Plant Systems - Tier 2/Group 1 (RO)

System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A3 G K/A Topic(s) Q IR #

062 AC Electrical X K3.03 - Knowledge of the 48 3.7 1 Distribution effect that a loss or malfunction of the A.C.

Distribution System will have on the following: -

DC system 063 DC Electrical X K4.02 - Knowledge of 49 2.9 1 Distribution D.C. Electrical System design feature(s) and/or interlock(s) which provide for the following: -

Breaker interlocks, permissives, bypasses and cross-ties 064 Emergency Diesel X K2.02 - Knowledge of bus 50 2.8 1 Generator power supplies to the following: - Fuel oil pumps 073 Process Radiation X K1.01 - Knowledge of the 51 3.6 1 Monitoring physical connections and/or cause-effect relationships between the PRM System and the following systems: -

Those systems served by PRMs 076 Service Water X 2.2.22 - Equipment 52 4.0 1 Control - Knowledge of limiting conditions for operations and safety limits.

076 Service Water X K2.04 - Knowledge of bus 53 2.5 1 power supplies to the following: - Reactor building closed cooling water 078 Instrument Air X K1.05 - Knowledge of the 54 3.4 1 physical connections and/or cause-effect relationships between the IAS and the following systems: - MSIV air 103 Containment X A1.01 - Ability to predict 55 3.7 1 and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the Containment System controls including: -

Containment pressure, temperature, and humidity K/A Category Totals: 3 2 3 3 2 2 3 3 2 2 3 Group Point Totals: 28 ES-401, 24 of 33

ES-401 5 Form ES-401-2 PWR Examination Outline Plant Systems - Tier 2/Group 2 (RO)

System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A3 G K/A Topic(s) Q IR #

001 Control Rod Drive X K2.05 - Knowledge of bus 56 3.1 1 power supplies to the following: - M/G sets 016 Non-nuclear X 2.4.31 - Emergency 57 4.2 1 Instrumentation Procedures/Plan -

Knowledge of annunciator alarms, indications, or response procedures.

029 Containment Purge X A1.02 - Ability to predict 58 3.4 1 and/or monitor changes in parameters (to prevent exceeding design limits) associated with operating the Containment Purge System controls including: - Radiation levels 034 Fuel Handling X K4.02 - Knowledge of 59 2.5 1 Equipment Fuel Handling System design feature(s) and/or interlock(s) which provide for the following: - Fuel movement 035 Steam Generator X K6.02 - Knowledge of the 60 3.1 1 effect of a loss or malfunction of the following will have on the S/GS: - Secondary PORV 041 Steam Dump/Turbine X K3.02 - Knowledge of the 61 3.8 1 Bypass Control effect that a loss or malfunction of the SDS will have on the following: - RCS 045 Main Turbine X K1.18 - Knowledge of the 62 3.6 1 Generator physical connections and/or cause-effect relationships between the MT/G System and the following systems: - RPS 068 Liquid Radwaste X A4.02 - Ability to 63 3.2 1 manually operate and/or monitor in the control room: - Remote radwaste release 072 Area Radiation X A3.01 - Ability to monitor 64 2.9 1 Monitoring automatic operation of the ARM system, including: - Changes in ventilation alignment ES-401, 25 of 33

ES-401 5 Form ES-401-2 PWR Examination Outline Plant Systems - Tier 2/Group 2 (RO)

System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A3 G K/A Topic(s) Q IR #

086 Fire Protection X A2.02 - Ability to (a) 65 3.0 1 predict the impacts of the following malfunctions or operations on the Fire Protection System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Low FPS header pressure K/A Category Totals: 1 1 1 1 0 1 1 1 1 1 1 Group Point Totals: 10 ES-401, 25 of 33

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: ANO Unit 2 2011 NRC Exam Date of Exam: 01/28/2011 Category K/A # Topic RO SRO Only Q IR # IR #

1 - Conduct of 2.1.43 Ability to use procedures to determine the effects on reactivity of 66 4.1 1 Operations plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc.

2.1.44 Knowledge of RO duties in the control room during fuel handling, 67 3.9 1 such as responding to alarms from the fuel handling area, communication with the fuel storage facility, systems operated from the control room in support of fueling operations, and supporting instrumentation.

Subtotal 2 2 - Equipment 2.2.7 Knowledge of the process for conducting special or infrequent 68 2.9 1 Control tests.

2.2.13 Knowledge of tagging and clearance procedures. 69 4.1 1 2.2.38 Knowledge of conditions and limitations in the facility license. 70 3.6 1 Subtotal 3 3 - Radiological 2.3.4 Knowledge of radiation exposure limits under normal or 71 3.2 1 Controls emergency conditions.

2.3.7 Ability to comply with radiation work permit requirements during 72 3.5 1 normal or abnormal conditions.

2.3.13 Knowledge of radiological safety procedures pertaining to licensed 73 3.4 1 operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

Subtotal 3 4 - Emergency 2.4.17 Knowledge of EOP terms and definitions. 74 3.9 1 Procedures/Plan 2.4.34 Knowledge of RO tasks performed outside the main control room 75 4.2 1 during an emergency and the resultant operational effects.

Subtotal 2 Tier 3 Point Total 10 ES-401, 26 of 33

ES-401 PWR Examination Outline Form ES-401-2 Facili ty: ANO Unit 2 2011 NRC Exam Date of Exam: 01/28/2011 RO K/A Category Points SRO-Only Points Tier Group K1 K2 K3 K4 K5 K6 A1 A2 A3 A4 G* Total A2 G* Total

1. Emergency 1 3 3 6 N/A N/A Abnormal Plant 2 2 2 4 evolutions Tier Totals 5 5 10
2. Plant Systems 1 3 3 2 5 2 2 0 2 1 3 Tier Totals 5 3 8
3. Generic Knowledge and Abilities Categories 1 2 3 4 1 2 3 4 2 2 1 2 7 Note: 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e., except for one category in Tier 3 of the SRO-only outline, the Tier Totals in each K/A category shall not be less than two).
2. The point total for each group and tier in the proposed outline must match that specified in the table.

The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.

3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems/evolutions that are not included on the outline should be added. Refer to Section D.1.b of ES-401 for guidance regarding the elimination of inappropriate K/A statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected. Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.

7.* The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable K/As.

8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note
  1. 1 does not apply). Use duplicate pages for RO and SRO-only exams.
9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

ES-401, 21 of 33

ES-401 2 Form ES-401-2 PWR Examination Outline Emergency and Abnormal Evolutions - Tier 1/Group 1 (SRO)

E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G K/A Topic(s) Q IR #

000026 Loss of Component X AA2.01 - Ability to determine and 76 3.5 1 Cooling Water / 8 interpret the following as they apply to the Loss of Component Cooling Water: - Location of a leak in the CCWS 000062 Loss of Nuclear Svc X 2.2.21 - Equipment Control - 77 4.1 1 Water / 4 Knowledge of pre- and post-maintenance operability requirements.

000077 Generator Voltage and X AA2.03 - Ability to determine and 78 3.6 1 Electric Grid Disturbances / 6 interpret the following as they apply to Generator Voltage and Electric Grid Disturbances: - Generator current outside the capability curve CE/E02 Reactor Trip - X 2.1.19 - Conduct of Operations - 79 3.8 1 Stabilization - Recovery / 1 Ability to use plant computers to evaluate system or component status.

CE/E05 Steam Line Rupture - X EA2.2 - Ability to determine and 80 4.2 1 Excessive Heat Transfer / 4 interpret the following as they apply to the (Excess Steam Demand): -

Adherence to appropriate procedures and operation within the limitations in the facility's license and amendments CE/E06 Loss of Main Feedwater X 2.2.42 - Equipment Control - Ability to 81 4.6 1

/4 recognize system parameters that are entry-level conditions for Technical Specifications.

K/A Category Totals: 0 0 0 0 3 3 Group Point Totals: 6 ES-401, 22 of 33

ES-401 3 Form ES-401-2 PWR Examination Outline Emergency and Abnormal Evolutions - Tier 1/Group 2 (SRO)

E/APE # / Name / Safety Function K1 K2 K3 A1 A2 G K/A Topic(s) Q IR #

000028 Pressurizer Level X 2.4.20 - Emergency Procedures/Plan - 82 4.3 1 Malfunction / 2 Knowledge of operational implications of EOP warnings, cautions, and notes.

000036 Fuel Handling Accident / X AA2.01 - Ability to determine and 83 3.9 1 8 interpret the following as they apply to the Fuel Handling Incidents: - ARM system indications 000051 Loss of Condenser X AA2.02 - Ability to determine and 84 4.1 1 Vacuum / 4 interpret the following as they apply to the Loss of Condenser Vacuum: -

Conditions requiring reactor and/or turbine trip 000076 High Reactor Coolant X 2.4.47 - Emergency Procedures/Plan - 85 4.2 1 Activity / 9 Ability to diagnose and recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.

K/A Category Totals: 0 0 0 0 2 2 Group Point Totals: 4 ES-401, 23 of 33

ES-401 4 Form ES-401-2 PWR Examination Outline Plant Systems - Tier 2/Group 1 (SRO)

System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A3 G K/A Topic(s) Q IR #

012 Reactor Protection X A2.07 - Ability to (a) 86 3.7 1 predict the impacts of the following malfunctions or operations on the RPS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Loss of dc control power 013 Engineered Safety X A2.01 - Ability to (a) 87 4.8 1 Features Actuation predict the impacts of the following malfunctions or operations on the ESFAS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - LOCA 039 Main and Reheat X 2.4.49 - Emergency 88 4.4 1 Steam Procedures/Plan - Ability to perform without reference to procedures those actions that require immediate operation of system components and controls.

064 Emergency Diesel X A2.07 - Ability to (a) 89 2.7 1 Generator predict the impacts of the following malfunctions or operations on the ED/G System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: -

Consequences of operating under/over-excited 078 Instrument Air X 2.4.4 - Emergency 90 4.7 1 Procedures/Plan - Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.

ES-401, 24 of 33

ES-401 4 Form ES-401-2 PWR Examination Outline Plant Systems - Tier 2/Group 1 (SRO)

System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A3 G K/A Topic(s) Q IR #

K/A Category Totals: 0 0 0 0 0 0 0 3 0 0 2 Group Point Totals: 5 ES-401, 24 of 33

ES-401 5 Form ES-401-2 PWR Examination Outline Plant Systems - Tier 2/Group 2 (SRO)

System # / Name K1 K2 K3 K4 K5 K6 A1 A2 A3 A3 G K/A Topic(s) Q IR #

055 Condenser Air X 2.1.45 - Conduct of 91 4.3 1 Removal Operations - Ability to identify and interpret diverse indications to validate the response of another indication.

056 Condensate X A2.05 - Ability to (a) 92 2.5 1 predict the impacts of the following malfunctions or operations on the Condensate System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Condenser tube leakage 071 Waste Gas Disposal X A2.05 - Ability to (a) 93 2.6 1 predict the impacts of the following malfunctions or operations on the Waste Gas Disposal System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: - Power failure to the ARM and PRM Systems K/A Category Totals: 0 0 0 0 0 0 0 2 0 0 1 Group Point Totals: 3 ES-401, 25 of 33

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility: ANO Unit 2 2011 NRC Exam Date of Exam: 01/28/2011 Category K/A # Topic RO SRO Only Q IR # IR #

1 - Conduct of 2.1.23 Ability to perform specific system and integrated plant procedures 94 4.4 1 Operations during all modes of plant operation.

2.1.32 Ability to explain and apply system limits and precautions. 95 4.0 1 Subtotal 2 2 - Equipment 2.2.20 Knowledge of the process for managing troubleshooting activities. 96 3.8 1 Control 2.2.35 Ability to determine Technical Specification Mode of Operation. 97 4.5 1 Subtotal 2 3 - Radiological 2.3.14 Knowledge of radiation or contamination hazards that may arise 98 3.8 1 Controls during normal, abnormal, or emergency conditions or activities.

Subtotal 1 4 - Emergency 2.4.18 Knowledge of the specific bases for EOPs. 99 4.0 1 Procedures/Plan 2.4.28 Knowledge of procedures relating to a security event (non- 100 4.1 1 safeguards information).

Subtotal 2 Tier 3 Point Total 7 ES-401, 26 of 33

ES-401 Record of Rejected K/As Form ES-401-4 Rev. 1 Tier / Randomly Reason for Rejection Group Selected K/A QID #4 000011 Large Break This K&A is not one of the required Generic K&As to be LOCA / 3 used in Tier 1 and 2 as directed by NUREG 1021 ES-401 2.1.4 - Conduct of section D.1.b. therefore, it was rejected and another generic Operations. Knowledge of K&A was randomly selected from the list in NUREG 1021 individual licensed operator ES-401 Section D1.b.

responsibilities related to shift manning, such as 2.4.20 Emergency Procedures/Plan - Knowledge of medical requirements,no- operational implications of EOP warnings, cautions, and solo operation notes.

,maintenance of active license status 10CFR55,etc.

QID #6 This K&A is not applicable to ANO since the RCS Makeup 000022 Loss of Reactor System at ANO does not have RCP seal backpressure Coolant Makeup /2 regulating valves therefore, a credible and operationally valid AK3.01 -Knowledge of the question can not be developed on this K&A reasons for the following AK3.04 Knowledge of the reasons for the following responses as they apply to responses as they apply to the Loss of Reactor Coolant Pump the Loss of Reactor Coolant RO Exam Makeup:- Adjustment of Makeup: -Isolating Letdown was randomly selected as a Tier 1 replacement from the other AK3 K&A statements under this RCP seal backpressure Group 1 regulator valve to obtain category with a RO importance rating of > 2.5.

normal flow This K&A is not one of the required Generic K&As to be QID #10 used in Tier 1 and 2 as directed by NUREG 1021 ES-401 000038 Steam Generator section D.1.b. therefore, it was rejected and another generic Tube Rupture / 3 K&A was randomly selected from the list in NUREG 1021 ES-401 Section D1.b.

2.1.41 - Conduct of Operations. Knowledge of 2.4.47 Emergency Procedures/Plan - Ability to diagnose and refueling processes. recognize trends in an accurate and timely manner utilizing the appropriate control room reference material.

ANO Unit 2 was not designed with a Speed Switch QID #14 Ventilation system therefore, a credible and operationally valid question can not be developed on this K&A therefore, 000056 Loss of Offsite it was rejected and another K&A was randomly selected.

Power / 6 AA1.07 Ability to operate and or monitor as they apply to the AA1.20 - Ability to operate Loss of Offsite Power-Service Water Pump was randomly and or monitor as they selected as a replacement from the other AA1 K&A apply to the Loss of Offsite statements under this category with a RO importance rating Power- Speed switch room of > 2.5.

ventilation fan.

NUREG-1021, Revision 9 Supplement 1 Page 1 of 3

ES-401 Record of Rejected K/As Form ES-401-4 Rev. 1 Tier / Randomly Reason for Rejection Group Selected K/A QID #20 This K&A was rejected due to the similarities between question #91 K&A 055 2.1.45 therefore, it was rejected and 000037Steam Generator another K&A was randomly selected.

Tube Leak/ 3 AA1.05 Ability to operate and/or monitor the following as AA1.02 - Ability to operate they apply to the Steam Generator Tube Leak: - Radiation and or monitor as they monitor for auxiliary building exhaust processes was apply to the Steam randomly selected as a replacement from the other AA1 Generator Tube Leak- K&A statements under this category with a RO importance Condensate Exhaust System rating of > 2.5.

RO Exam Tier 1 QID #22 Group 2 This K&A is not one of the required Generic K&As to be 000061 ARM System used in Tier 1 and 2 as directed by NUREG 1021 ES-401 Alarms/ 7 section D.1.b. therefore, it was rejected and another generic 2.1.37 - Conduct of K&A was randomly selected from the list in NUREG 1021 Operations. Knowledge of ES-401 Section D.1.b.

procedures, guidelines, or 2.1.20 Conduct of Operations-Ability to interpret and limitations associated with execute procedure steps.

reactivity management.

QID #29 This K&A is not one of the required Generic K&As to be used in Tier 1 and 2 as directed by NUREG 1021 ES-401 004 Chemical and Volume section D.1.b. therefore, it was rejected and another generic Control K&A was randomly selected from the list in NUREG 1021 2.2.17 -Equipment Control- ES-401 Section D.1.b.

Knowledge of the process for managing maintenance activities during power 2.1.28 Conduct of Operations - Knowledge of the purpose operations, such as risk and function of major system components and controls.

assessments, work prioritization, and RO Exam coordination with the transmission system Tier 2 operator Group 1 ANO Unit 2 was not designed with a swing bus in the CCW QID #35 system therefore, a credible and operationally valid question can not be developed on this K&A therefore, it was rejected 00008 Component Cooling and another K&A was randomly selected.

Water K4.07 -Knowledge of CCWS design feature(s) and K4.09 Knowledge of CCWS design feature(s) and/or or interlocks(s) which interlock(s) which provide for the following: - The "standby" provide for the following: - feature for the CCW pumps was randomly selected as a Operation of the CCW replacement from the other K4 K&A statements under this swing-bus power supply and category with a RO importance rating of > 2.5.

its associated breakers and controls.

NUREG-1021, Revision 9 Supplement 1 Page 2 of 3

ES-401 Record of Rejected K/As Form ES-401-4 Rev. 1 QID #45 This K/A was rejected because a credible and operationally 00061 valid question can not be developed on this K&A therefore Auxiliary/Emergency another K&A was randomly selected.

Feedwater A3.05 -Ability to monitor A3.01Ability to monitor automatic operation of the AFW automatic operation of the System, including: - AFW startup and flows was randomly AFW System, including: - selected as a replacement from the other A3 K&A statements Recognition of leakage, under this category with a RO importance rating of > 2.5.

using sump level changes.

This K&A is not one of the required Generic K&As to be used QID #52 in Tier 1 and 2 as directed by NUREG 1021 ES-401 section D.1.b. therefore, it was rejected and another generic K&A was RO Exam 00076 Service Water randomly selected from the list in NUREG 1021 ES-401 Tier 2 2.2.7 Equipment Control- Section D.1.b.

Group 1 Knowledge of the process for conducting special or infrequent tests. 2.2.22 Equipment Control - Knowledge of limiting conditions for operations and safety limits.

ANO Unit 2 was not designed with or uses cooling water to QID #54 the instrument air compressors therefore, a credible and operationally valid question can not be developed on this 00078 Instrument Air K&A therefore, it was rejected and another K&A was K1.04 Knowledge of the randomly selected.

physical connections K1.05 Knowledge of the physical connections and/or cause-and/or cause effect effect relationships between the IAS and the following relationships between the systems: - MSIV air was randomly selected as a replacement IAS and the following from the other K1 K&A statements under this category with a systems - cooling water RO importance rating of > 2.5.

to compressor QID #79 CE/E02 Reactor Trip Stabilization-Recovery/1 2.1.44-Conduct of This K&A is not one of the required Generic K&As to be used Operations-Knowledge of in Tier 1 and 2 as directed by NUREG 1021 ES-401 section RO duties in the control D.1.b. therefore, it was rejected and another generic K&A was room during fuel randomly selected from the list in NUREG 1021 ES-401 SRO Exam handling, such as Section D.1.b.

Tier 1 responding to alarms Group 1 from the fuel handling area, communication 2.1.19 Conduct of Operations - Ability to use plant computers with the fuel storage to evaluate system or component status.

facility, systems operated from the control room in support of fueling operations, and supporting instrumentation.

NUREG-1021, Revision 9 Supplement 1 Page 3 of 3

2011 EXAM METHOD USED FOR RANDOM K/A SAMPLING A commercial random generation program was used to generate both the RO and SRO written sample plans. The program was specifically designed for PWR plants and can select a specific Combustion Engineering database to generate a random sample plan for CE designed units. The program was supplied by the Westinghouse PWR Owners Group (PWROG). The name of the program is NKEG Version 1.1 developed and distributed during May 2008 for use to develop K&A sample plans. This program prescreens the non CE related EPE/APE K/As and allows all other K/As with an importance rating of greater than 2.5 to be selected. The program also provides for manual input for suppression of additional K/As to tailor the sample pool to fit individual unit design. This program was designed for use with NUREG 1021 Revision 9 Supplement 1 and NUREG 1122 Revision 2 Supplement 1.

The list of Suppressed K/As is included along with this explanation of the method used to randomly select K/As for your review. ANO Unit 2 does not have an Ice Condenser in Containment (System 025) nor do we have intermediate range nuclear instrumentation (System 027). The excore nuclear instrumentation used at ANO covers the full spectrum of power from the subcritical range to 200% power. The plant installed Containment Iodine Removal System (System 033) has been removed from service and a fleet Iodine removal trailer will be brought in if conditions warrant. Therefore, the K/As for these three systems, along with all their respective generic K/As were suppressed prior to sample plan generation. Other specific items shown on the included list of suppressed K/As that were not applicable to ANO Unit 2 were also suppressed prior to sample plan generation.

Once the sample plans were randomly generated, they were reviewed for Generic K/A applicability, balance of coverage for system selection and K/A statements to prevent over sampling. Also operational validity was considered on each K/A. If it was determined that the K/A would not produce an operationally valid question, then the original K/A was rejected and the other K/As in that category i.e. K1, K2 etc. were placed in a container and an alternate K/A was selected for question development.

Also instructions for Tier 1 and Tier 2 Generic K&A selection, NUREG 1021 ES-401 Section D.1.b. were incorporated to ensure all the K&A numbers selected were as directed by NUREG 1021. The NKEG Version 1.1 program was not designed to select only the generic K&As listed in NUREG 1021 ES-401 Section D.1.b. for the Tier 1 and Tier 2 RO and SRO outlines. Therefore all of the generic K&A numbers listed in NUREG 1021 ES-401 Section D.1.b. were placed on plastic round markers and placed in a bucket. After the random generation of the RO and SRO outline, any generic K&As selected in TIER 1 and Tier 2 were compared to the list in NUREG 1021 ES-401 Section D.1.b. and if the randomly selected K&A did not match then it was rejected and another generic K&A was selected from the bucket. All these rejections and reselections are documented on the Record of Rejected K&As Form ES-401-4.

The Record of Rejected K/As, Form ES-401-4, has been submitted with this explanation of sample plan generation for your review.

Revision 0

Appendix D Scenario 3 Form ES-D-1 Facility: ANO-2 Scenario No.: 3 (New) Op-Test No.: 2011-1 Examiners: Operators:

Initial Conditions:

60% MOL, All Engineered Safety Features systems are in standby. Gland Seal Steam Pressure Control Valve 2PCV-0231 jacked closed. RED Train Maintenance Week.

Turnover: 60% power for repair of 2P-1B Feedwater pump. 250 EFPD. EOOS indicates Minimal Risk.

Gland Seal Steam Pressure Control Valve 2PCV-0231 jacked closed, manually control seal steam pressure. RED Train Maintenance Week. B Main Feedwater pump PMT is complete and is idling for oxygen control. Evolution scheduled: Place B Main Feedwater pump in service and raise power to 100%. Step 10.1 of 2106.007, Main Feedwater pump and FWCS operation, for placing the B Main Feedwater pump in service is complete. Commence power escalation using applicable 2104.002 steps 9.1 through 9.11 are complete and steps 9.13 to 9.18 and 9.20 to 9.29 are not applicable or complete with the exception of placing B Main feedwater pump in service (step 9.25). (provide markup copy of Power OPS procedure 2104.002 Section 9)

Event Malf. No. Event Event No. Type* Description 1 N (BOP) Place B MFWP in service.

N (SRO) 2 R (ATC) Power Ascension.

N (BOP)

N (SRO) 3 XRC2TE46111 I (BOP) Tc temperature transmitter fails high. Tech Spec for I (SRO) SRO.

4 CVC4817DEM I (ATC) Letdown Hand Indicating Controller (HIC) demand I (SRO) fails high causing low pressurizer level.

5 XRCCHBPLVL I (ATC) Channel B Pressurizer level channel fails low. Tech I (SRO) Spec for SRO.

6 EHSYSLEAK M (ALL) Leak in the Electro Hydraulic system causing a turbine trip, reactor trip and a loss of main feedwater pumps.

7 XMSHDRPRS I (BOP) SDBCS input fails low after the Reactor trip.

I(SRO) 8 CV0332 C (BOP) 2P-7A Emergency Feedwater pump overspeed trips on EFW2P7BFLT C (SRO) start and 2P-7B motor trips due to a winding failure.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Total malfunctions. = 6, Malfunctions after EOP entry = 2, Abnormal events = 3, Major transient = 1, EOPs with substantive actions =1, EOP Contingencies = 0, Critical tasks = 2.

Revision 0 Page 1 of 3

Appendix D Scenario 3 Form ES-D-1 Scenario #3 Objectives

1) Evaluate individual ability to place a Main Feedwater pump in service.
2) Evaluate individual ability to perform a power escalation.
3) Evaluate individual response to a RCS temperature instrument failure.
4) Evaluate individual response to a failure of a Hand indicating controller failure.
5) Evaluate individual response to a failure of a Pressurizer level control channel.
6) Evaluate individual response to an Electro Hydraulic system leak.
7) Evaluate individual response to a failure of the Steam Dump Bypass control system to function in automatic.
8) Evaluate individual ability to mitigate a Loss of Feedwater event.
9) Evaluate individual ability to monitor operation of Engineered Safety Features equipment.

SCENARIO #3 NARRATIVE Simulator session begins with the plant at 60% power steady state Gland Seal Regulator, 2PCV-0231 is jacked closed.

When the crew has completed their control room walk down and brief, The BOP will place the 2P-1B feedwater pump in service. Also, while the BOP is placing 2P-1B feedwater pump in service the ATC will raise reactor power using RCS dilution.

After the BOP has placed the B feedwater pump in service and the ATC has completed the required reactivity manipulation and cued by lead examiner, 2TE-4611-1(2TI-4605-1) RCS temperature transmitter will fail high. The ATC/BOP will announce Trip and Pretrip alarms on A PPS channel. The SRO will refer to the ACA for RPS Pretrip-Trip alarms and Technical Specifications. Then the SRO will direct that points on A channel PPS for LPD, and DNBR must be bypassed in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> as required by Tech Specs.

After the A channel PPS points have been bypassed and cued by lead examiner, the demand on the Letdown Hand Indicating controller (HIC) will ramp to 100%. This will result in letdown going to maximum flow. The elevated letdown flow will cause pressurizer level to lower and the volume control tank level to trend up until the automatic setpoint is reached to divert the excess letdown flow to the online holdup tank. Eventually, a backup charging pump will start based on low pressurizer level causing the low oil pressure alarm to come in and then clear. The ATC and SRO should diagnose that the letdown controller demand does not match the demand from the pressurizer level controller. The ATC will take the letdown flow controller to manual and control PZR level.

After letdown has been placed in manual and pressurizer level is being restored to set point by manual control and cued by the lead examiner, the B channel pressurizer level instrument will fail low. This will cause the backup charging pumps to automatically start and will de-energize all pressurizer heaters. AOP 2203.028, PZR Systems Malfunctions, will be entered and actions directed by the SRO. The ATC will verify that the other level control channel is reading correctly and select that channel for control and place the PZR low level cutoff switch to the unaffected channel. The ATC will also restore the pressurizer proportional heaters to service. The SRO will enter Tech Spec 3.3.3.5 Remote Shutdown instrumentation and 3.3.3.6 Post Accident Instrumentation.

Revision 0 Page 2 of 3

Appendix D Scenario 3 Form ES-D-1 SCENARIO #3 NARRATIVE (continued)

After the ATC has placed A Channel pressurizer level control in service and restored pressurizer proportional heaters, an EH leak will start down stream of isolation valve 2EH-1A (on EH Pump Skid) on the common header. EH pressure will degrade to ~1300 psig over the next 3 minutes.

Annunciator 2K02-A9, LOW EH Pressure, will alarm and the standby EH pump will automatically start. EH pressure will rise and then lower again as the leak degrades. Annunciator 2K02-C10, EH Tank Low Level will alarm about 5 minutes after the start of the malfunction. The Main Turbine Generator will automatically trip at 1100 psig EH pressure. The Main Feed Pumps will automatically trip at 400 psig EH pressure. The crew will secure the EH pumps and the CRS will enter SPTAs.

The Crew will implement Standard Post Trip Actions (SPTA), OP 2202.001. When the reactor trips, the input to the Steam Dump Bypass Control System (SDBCS) will fail low. This will cause the SDBCS valves to have no demand and remain closed. The crew should take manual control of the SDBCS valves to control S/G pressure. 2P-7B Emergency Feedwater pump will trip when it starts due to a motor fault. During SPTAs, 2P-7A will overspeed trip due to an oil leak. The ATC will secure two Reactor Coolant Pumps (RCP) during SPTAs based on no available feedwater and the BOP will close the Steam Generator blowdown valves. If the SRO directs all RCPs secured during SPTAs, the ATC will align for Auxiliary spray to control RCS pressure.

The SRO will diagnose Loss of Feedwater due no feedwater feeding the Steam Generators and enter OP 2202.006, Loss of Feedwater.

The crew will secure all RCPs if not secured during SPTAs. The ATC will align for Auxiliary spray to control RCS pressure if not aligned during SPTAs.

Revision 0 Page 3 of 3

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Arkansas Nuclear One Date of Exam: 1-28-11 Operating Test No.: 2011-1 A E Scenarios P V 1 2 4 T M 3(currently selected P E as spare) O I L N T N CREW CREW CREW CREW I I T A POSITION POSITION POSITION POSITION M C L U A T S A B S A B S A B S A B M(*)

R T O R T O R T O R T O N Y R I U O C P O C P O C P O C P T P E

RO RX 2 1 1 1 0 X 3 1,2 SRO-I NOR 1 1 1 1 I/C 3,8 1,2,7 3,7,8 5 4 4 2 SRO-U 5,6 5, 6 MAJ 3 2 2 1 TS 0 0 2 2 RO RX 3 2 1 1 1 0 X NOR 1 1 1 1 1 SRO-I I/C 4,7,9 4,6 4,5 5 4 4 2 SRO-U MAJ 5,6 5 6 3 2 2 1 TS 0 0 2 2 RO RX 0 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 2,3,4, 6 4 4 2 7,8,9 SRO-U MAJ 5,6 2 2 2 1 X

TS 2,3 2 0 2 2 RO RX 0 1 1 0 NOR 3 1,2 1 1 1 1 SRO-I I/C 1,2,4, 3,4,5, 5 4 4 2 6,7 7,8 SRO-U MAJ 5 6 1 2 2 1 X

TS 1,3 3,5 2 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

Revision 0 Page 1 of 2

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Arkansas Nuclear One Date of Exam: 1-28-11 Operating Test No.: 2011-1 A E Scenarios P V 1 2 4 T M 3(currently selected P E as spare) O I L N T N CREW CREW CREW CREW I I T A POSITION POSITION POSITION POSITION M C L U A T S A B S A B S A B S A B M(*)

R T O R T O R T O R T O N Y R I U O C P O C P O C P O C P T P E

RO RX 2 1 1 1 0 NOR 3 1,2 1 1 1 1 SRO-I X I/C 3,8 1,2,4, 3,4,5, 7 4 4 2 6,7 7,8 SRO-U MAJ 5,6 5 6 3 2 2 1 TS 1,3 3,5 2 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

Revision 0 Page 2 of 2

ES-301 Competencies Checklist Form ES-301-6 Facility: Arkansas Nuclear One Date of Examination: 1-28-11 Operating Test No.: 2011-1 APPLICANTS RO X RO X RO RO SRO-I SRO-I SRO-I SRO-I SRO-U SRO-U SRO-U X SRO-U X Competencies SCENARIO SCENARIO SCENARIO SCENARIO 1 2 3 1 2 3 1 2 3 1 2 3 BOP ATC ATC ATC BOP BOP Interpret/Diagnose 2,4,5, 3,4,5,6 3,4,5 2,3,5,6, 1,2,7 3,6,7,8 2,3,4,5, 3,4,5,6, 1,2,3,4,5 3,4,5,6, 6,7,9 8 6,7,8,9 7,8 ,6,7 7,8 Events and Conditions Comply With and 1,3 3 2,5 2,3 1,2,3 1,2,3 2,3,4,5, 2,3,4,5, 1,2,3,4,5 2,3,4,5, 6,7,8,9 6,7,8 ,6,7 6,7,8 Use Procedures (1)

Operate Control 1,3,4, 3,4,5,6 2,4,5 2,3,6,8 1,2,3,7 1,3,6,7, N/A N/A N/A N/A 6,7,9 8 Boards (2)

Communicate 1,2,3, 3,4,5,6 2,4,5,6 2,3,5,6, 1,2,3,7 2,3,6,7, 1,2,3,4, 1,2,3,4, 1,2,3,4,5 1,2,3,4, 4,5,6, 8 8 5,6,7,8, 5,6,7,8 ,6,7 5,6,7,8 and Interact 7,9 9 Demonstrate N/A N/A N/A N/A N/A N/A 1,2,3,4, 1,2,3,4, 1,2,3,4,5 1,2,3,4, 5,6,7,8, 5,6,7,8 ,6,7 5,6,7,8 Supervisory Ability (3) 9 Comply With and N/A N/A N/A N/A N/A N/A 2,3 3,5 1,3 3,5 Use Tech. Specs. (3)

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Only applicable to SROs.

Revision 1 Page 1 of 2

ES-301 Competencies Checklist Form ES-301-6 Facility: Arkansas Nuclear One Date of Examination: 1-28-11 Operating Test No.: 2011-1 APPLICANTS RO RO RO RO SRO-I X SRO-I SRO-I SRO-I SRO-U SRO-U SRO-U SRO-U Competencies SCENARIO SCENARIO SCENARIO SCENARIO 1 2 3 1 2 3 1 2 3 1 2 3 ATC SRO SRO Interpret/Diagnose 2,3,5, 1,2,3,4, 3,4,5,6, 6,8 5,6,7 7,8 Events and Conditions Comply With and 2,3 1,2,3,4, 2,3,4,5, 5,6,7 6,7,8 Use Procedures (1)

Operate Control 2,3,6, N/A N/A 8

Boards (2)

Communicate 2,3,5, 1,2,3,4, 1,2,3,4, 6,8 5,6,7 5,6,7,8 and Interact Demonstrate N/A 1,2,3,4, 1,2,3,4, 5,6,7 5,6,7,8 Supervisory Ability (3)

Comply With and N/A 1,3 3,5 Use Tech. Specs. (3)

Notes:

(1) Includes Technical Specification compliance for an RO.

(2) Optional for an SRO-U.

(3) Only applicable to SROs.

Revision 1 Page 2 of 2

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Arkansas Nuclear One Unit 2 Date of Examination: 01/28/2011 Examination Level: RO X SRO Operating Test Number: 2011-1 Administrative Topic Type Describe activity to be performed (see Note) Code*

Apply limit and precautions to transferring Unit Auxiliaries to Start Up Transformer #2.

A1. Conduct of Operations P/R ANO-2-JPM-NRC-ADMIN-SU2LOAD 2.1.32 RO (3.8)

Perform a dilution calculation (Manual method)

A2. Conduct of Operations D/R ANO-2-JPM-NRC-ADMIN-CVCS6 2.1.37 RO (4.3)

Determine applicable Tech Specs for EFW A3. Equipment Control N/R ANO-2-JPM-NRC-ADMIN-EFWTS 2.2.37 RO (3.6)

Determine Condenser Off gas Radiation monitor setting.

A4. Radiation Control N/R ANO-2-JPM-NRC-ADMIN-CRADMON 2.3.15 RO (2.9)

Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

Revision 0

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Arkansas Nuclear One Unit 2 Date of Examination: 01/28/2011 Examination Level: RO SRO X Operating Test Number: 2011-1 Administrative Topic Type Describe activity to be performed (see Note) Code*

Review CEA#1 Upper Gripper Coil Temperature Data and determine correct temperature.

A5. Conduct of Operations D/R ANO-2-JPM-NRC-ADMIN-XTCEA 2.1.23 SRO (4.4)

Review CCW system line up to normal operation.

A6. Conduct of Operations D/R ANO-2-JPM-NRC-ADMIN-CCWVLVLU 2.1.29 SRO (4.0)

Determine applicable Tech Spec for Control Room Ventilation.

A7. Equipment Control N/R ANO-2-JPM-NRC-ADMIN-CREVSTS 2.2.37 SRO (4.6)

Approve administration of Potassium Iodide.

A8. Radiation Control P/R ANO-2-JPM-NRC-ADMIN-KI 2.3.14 SRO (3.8)

Determine Emergency Action Level for given conditions.

A9. Emergency D/R ANO-2-JPM-NRC-ADMIN-EAL11 Procedures/Plan 2.4.41 SRO (4.6)

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

Revision 0

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One Unit 2 Date of Examination: 01/28/2011 Exam Level: RO X SRO-I SRO-U Operating Test No.: 2011-1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function S1. ANO-2-JPM-NRC-AOP3 3 010 A2.02 RO-3.9/SRO-3.9 A/N/S Pressure Control Isolate failed PZR spray valve S2. ANO-2-JPM-NRC-SIT08 2 006 A1.13 RO-3.5/SRO-3.7 D/EN/S Inventory Control Lower SIT level S3. ANO-2-JPM-NRC-EDG06 6 064 A4.06 RO-3.9/SRO-3.9 D/S Electrical Align 2A-2 to 2A-4 S4. ANO-2-JPM-NRC-CEA02 7 012 A4.06 RO-4.3/SRO-4.3 D/S Instrumentation Test a Reactor Trip Circuit Breaker S5. ANO-2-JPM-NRC-CEA01 1 001 A4.03 RO-4.0/SRO-3.7 D/S Reactivity control Perform a CEA exercise S6. ANO-2-JPM-NRC-CNMT2 5 103 A3.01 RO-3.9/SRO-4.2 Drain the containment sump A/N/S Containment Integrity S7. ANO-2-JPM-NRC-RCP02 4 003 A4.08 RO-3.2/SRO-2.9 A/D/L/S Heat Removal Restore CCW to RCPs S8. ANO-2-JPM-NRC-CCW02 8 008 A4.01 RO-3.3/SRO-3.1 P/S Plant service Shift running CCW pumps systems In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1. ANO-2-JPM-NRC-AACLS 6 064 A4.01 RO-4.0/SRO-4.3 A/P/E/L Electrical Start up AAC diesel generator manually locally during a LOOP P2. ANO-2-JPM-NRC-AUADV 4 041 A4.08 RO-3.0/SRO-3.1 D/E/L Heat Removal Operate SDBCS valves locally P3. ANO-2-JPM-NRC-SFPAW 8 033 A2.03 RO-3.1/SRO-3.5 D/R Plant service Fill SFP from RWT systems

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/ 1/ 1 (S)imulator Revision 0

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One Unit 2 Date of Examination: 01/28/2011 Exam Level: RO SRO-I X SRO-U Operating Test No.: 2011-1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function S1. ANO-2-JPM-NRC-AOP3 3 010 A2.02 RO-3.9/SRO-3.9 A/N/S Pressure Control Isolate failed PZR spray valve S2. ANO-2-JPM-NRC-SIT08 2 006 A1.13 RO-3.5/SRO-3.7 D/EN/S Inventory Control Lower SIT level S3. ANO-2-JPM-NRC-EDG06 6 064 A4.06 RO-3.9/SRO-3.9 D/S Electrical Align 2A-2 to 2A-4 S4. ANO-2-JPM-NRC-CEA02 7 012 A4.06 RO-4.3/SRO-4.3 D/S Instrumentation Test a Reactor Trip Circuit Breaker S5. ANO-2-JPM-NRC-CEA01 1 001 A4.03 RO-4.0/SRO-3.7 D/S Reactivity control Perform a CEA exercise S6. ANO-2-JPM-NRC-CNMT2 5 103 A3.01 RO-3.9/SRO-4.2 Drain the containment sump A/N/S Containment Integrity S7. ANO-2-JPM-NRC-RCP02 4 003 A4.08 RO-3.2/SRO-2.9 A/D/L/S Heat Removal Restore CCW to RCPs S8.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1. ANO-2-JPM-NRC-AACLS 6 064 A4.01 RO-4.0/SRO-4.3 A/P/E/L Electrical Start up AAC diesel generator manually locally during a LOOP P2. ANO-2-JPM-NRC-AUADV 4 041 A4.08 RO-3.0/SRO-3.1 D/E/L Heat Removal Operate SDBCS valves locally P3. ANO-2-JPM-NRC-SFPAW 8 033 A2.03 RO-3.1/SRO-3.5 D/R Plant service Fill SFP from RWT systems

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/ 1/ 1 (S)imulator Revision 0

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Arkansas Nuclear One Unit 2 Date of Examination: 01/28/2011 Exam Level: RO SRO-I SRO-U X Operating Test No.: 2011-1 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function S1. ANO-2-JPM-NRC-AOP3 3 010 A2.02 RO-3.9/SRO-3.9 A/N/S Pressure Control Isolate failed PZR spray valve S2. ANO-2-JPM-NRC-SIT08 2 006 A1.13 RO-3.5/SRO-3.7 D/EN/S Inventory Control Lower SIT level In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1. ANO-2-JPM-NRC-AACLS 6 064 A4.01 RO-4.0/SRO-4.3 A/P/E/L Electrical Start up AAC diesel generator manually locally during a LOOP P2. ANO-2-JPM-NRC-AUADV 4 041 A4.08 RO-3.0/SRO-3.1 D/E/L Heat Removal Operate SDBCS valves locally P3. ANO-2-JPM-NRC-SFPAW 8 033 A2.03 RO-3.1/SRO-3.5 D/R Plant service Fill SFP from RWT systems

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/ 8/ 4 (E)mergency or abnormal in-plant 1/ 1/ 1 (EN)gineered safety feature - / - / 1 (control room system)

(L)ow-Power / Shutdown 1/ 1/ 1 (N)ew or (M)odified from bank including 1(A) 2/ 2/ 1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/ 1/ 1 (S)imulator Revision 0

Appendix D Scenario 1 Form ES-D-1 Facility: ANO-2 Scenario No.: 1 (New) Op-Test No.: 2011-1 Examiners: Operators:

Initial Conditions:

100% MOL, All Engineered Safety Features systems are in standby. Gland Seal Steam Pressure Control Valve 2PCV-0231 jacked closed. RED Train Maintenance Week.

Turnover:

100% Power 250 EFPD. EOOS indicates Minimal Risk. Gland Seal Steam Pressure Control Valve 2PCV-0231 is jacked closed; manually control seal steam pressure. RED Train Maintenance Week.

Evolution scheduled: Fill the Quench Tank to ~78% IAW 2103.007 Quench Tank and Reactor Drain Tank Operations. Step 7.2.1 of 2103.007 for filling the quench tank is complete.

Event Malf. No. Event Event No. Type* Description 1 N (BOP) Fill the Quench Tank.

N (SRO) 2 CV0242 R (ATC) #1 Main Turbine Generator Control Valve fails Closed.

C (SRO) Tech Spec for SRO.

3 RCSLOCATCA C (ATC) Shutdown required due to 15 gpm Reactor Coolant C (SRO) system leak on A cold leg. Tech Spec for SRO.

4 2C-11 I (BOP) Main Turbine Generator lube oil controller setpoint fails AI_TIC_1602 I (SRO) high.

MTGVIBINC Main Turbine Generator Vibrations increase causing a reactor trip.

5 500LOSE500 M (ALL) Loss of Offsite Power causing natural circulation of the 500LOSE161 RCS.

6 FW2PW5BAFT M(ALL) B Main Feed water line breaks inside containment.

7 416 A308 C (BOP) #1 EDG output breaker fails to automatically close.

C (SRO) 8 CVC2P36LOLVL I (ATC) Backup Charging pumps fail to start on SIAS or Low CVC2P36BSIAS I (SRO) PZR level. (Not credited for Malfunction after EOP entry due to possibly being discovered prior to EOP entry)

CVC2P36CSIAS 9 BS2P35BFAL C (BOP) 2P-35B Spray pump failed to automatically start and BS2P35AFAULT C (SRO) 2P-35A trips upon start.

K06-B01

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Total malfunctions. = 8, Malfunctions after EOP entry = 2, Abnormal events = 3, Major transient = 2, EOPs with substantive actions =1, EOP Contingencies = 1, Critical tasks = 3.

Revision 0 Page 1 of 3

Appendix D Scenario 1 Form ES-D-1 Scenario #1 Objectives

1) Evaluate individual ability to operate reactor coolant auxiliary equipment.
2) Evaluate individual response to a failure of a Main Turbine Control valve.
3) Evaluate individual response to a small Reactor Coolant system leak.
4) Evaluate individual ability to perform a reduction in plant power.
5) Evaluate individual ability to respond to a failed controller.
6) Evaluate individual ability to respond to Degraded Electrical power.
7) Evaluate individual response to a failure of Emergency Diesel Generator output breaker to automatically close.
8) Evaluate individual ability to mitigate an Excess Steam Demand inside containment.
9) Evaluate individual response to a failure of automatic control of Pressurizer level control.
10) Evaluate individual ability to monitor operation of Engineered Safety Features equipment.

SCENARIO #1 NARRATIVE Simulator session begins with the plant at 100% power steady state. Gland Seal Steam Pressure Control Valve, 2PCV-0231 is jacked closed.

When the crew has completed their control room walk down and brief, The BOP will fill the Quench Tank using the reactor makeup water system.

After the BOP has completed filling the Quench Tank to the appropriate level and cued by lead examiner; the #1 MTG control valve will fail closed. The SRO will enter AOP, 2203.024 Loss of Turbine Load. The SRO will direct the ATC to commence normal boration from a Boric Acid Makeup tank to lower reactor power until Tave and Tref are within 2 degrees. The SRO should call work management to investigate failure and may decide to fail #1 CV closed or have the BOP hold the test pushbutton for #1 CV which will maintain the valve closed.

After a five minute delay, a 15 gpm RCS leak will start. The SRO will enter the excess RCS leakage AOP, OP 2203.016. ATC and BOP will perform RCS Leak rate determinations. The SRO will enter Tech Spec 3.4.6.2. The SRO will direct the ATC to maintain pressurizer level within 5%

of set point by starting additional charging pumps as needed. The SRO will also direct the ATC to isolate letdown to determine the leak location. After the crew has determined the leak is not in letdown, they will restore letdown and the crew will change the boration method to commence a plant shutdown.

Revision 0 Page 2 of 3

Appendix D Scenario 1 Form ES-D-1 SCENARIO #1 NARRATIVE (continued)

After letdown has been restore to service and cued by the lead examiner, the Main Turbine Generator (MTG) lube oil temperature controller setpoint will fail high causing lube oil temperatures to raise. The SRO should refer to the high bearing temperature annunciator corrective action 2K02- B7 (alarm setpoint is 225ºF) and attempt to manually control lube oil temperature. If temperature goes above 230 degrees Fahrenheit, the crew should manually trip the reactor. If temperature does not go about 230 degrees Fahrenheit, then Turbine vibrations will begin to rise requiring a turbine and reactor trip.

The Crew will implement Standard Post Trip Actions (SPTA), OP 2202.001. When the Reactor trips a Loss of Offsite Power will occur and a Feedwater line break will start on the feedwater line to B S/G due to a water hammer on the Feedwater line Check valve. The Crew will manually actuate Main Steam Isolation Signal (MSIS) or verify that a Main Steam Isolation signal automatically actuates. The Crew will secure and/or verify that Emergency Feedwater (EFW) is not feeding B Steam generator. The output breaker for #1 EDG will not automatically close and the BOP should close the output breaker. The ATC will notice that the backup charging pumps did not start. The ATC will secure two Reactor Coolant Pumps when RCS pressure goes below 1400 psia.

The Containment Spray pump 2P-35B will fail to automatically start and Containment Spray pump 2P-35A will trip. The BOP will manual start 2P-35B to ensure containment design pressure is not exceeded.

The SRO will diagnose Functional Recovery due to two events in progress (Excess RCS leakage and Excess Steam demand) and enter OP 2202.009, Functional Recovery.

The crew will manually control Reactor Coolant Temperature once the B SG boils dry using the upstream Atmospheric Dump Valve on A SG. The ATC will control RCS pressure using auxiliary spray.

Revision 0 Page 3 of 3

Appendix D Scenario 2 Form ES-D-1 Facility: ANO-2 Scenario No.: 2 (New) Op-Test No.: 2011-1 Examiners: Operators:

Initial Conditions:

100% MOL; All Engineered Safety Features systems are in standby. Gland Seal Steam Pressure Control Valve 2PCV-0231 jacked closed. RED Train Maintenance Week Turnover:

100%. 250 EFPD. EOOS indicates Minimal Risk. Gland Seal Steam Pressure Control Valve 2PCV-0231 jacked closed; manually control seal steam pressure. RED Train Maintenance Week.

Event Malf. No. Event Event No. Type* Description 1 XSI2LT-5637 I (BOP) RWT level transmitter fails low. Tech Spec for SRO.

I (SRO) 2 SW2P4AWND C (BOP) 2P-4A Service water pump high winding temperature C (SRO) causing pump swap.

3 SGATUBE R (ATC) Shutdown required due to 4 gpm steam generator tube N (BOP) leak on A steam generator. Tech Spec for SRO.

N (SRO) 4 CVC2P39B C(ATC) 2P-39B Boric Acid Makeup pump will trip when it is C(SRO) started.

5 SGATUBE M (ALL) A Steam Generator tube leakage ramps up to 200 gpm over 5 minutes. Manual reactor trip criteria when greater than 44 gpm.

6 CEA35STUCK C (ATC) Control Element Assembly #35 remains fully CV48731 C (SRO) withdrawn when the reactor trips. The VCT outlet will not close and the emergency borate valve will not CVC4916SIAS automatically open.

7 ESFK401AAF C (BOP) 2CV-5017-1, 2CV-5015-1 Low pressure safety 416A406 C (SRO) injection (LPSI) and High pressure safety injection (HPSI) valves fail to open and the B HPSI pump trips K05-C03 due to motor overload.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Total malfunctions. = 7, Malfunctions after EOP entry = 2, Abnormal events = 3, Major transient = 1, EOPs with substantive actions =1, EOP Contingencies = 0, Critical tasks = 3.

Revision 0 Page 1 of 3

Appendix D Scenario 2 Form ES-D-1 Scenario #2 Objectives

1) Evaluate individual response to a failure of a Refueling water tank level transmitter.
2) Evaluate individual response to a failure of a Service Water pump motor.
3) Evaluate individual ability to operate safety related equipment.(swap service water pump)
4) Evaluate individual response to a primary to secondary leak.
5) Evaluate individual ability to perform a reduction in plant power.
6) Evaluate individual response to a failure of a Boric Acid Makeup pump.
7) Evaluate individual response to a stuck out CEA after a Reactor Trip.
8) Evaluate individual response to failed ESF relays causing multiple high pressure and low pressure injection valves to not automatically reposition.
9) Evaluate individual ability to mitigate a Steam Generator Tube rupture.
10) Evaluate individual ability to monitor operation of Engineered Safety Features equipment.

SCENARIO #2 NARRATIVE Simulator session begins with the plant at 100% power steady state. Gland Seal Steam Regulator, 2PCV-0231, is jacked closed.

When the crew has completed their control room walk down and brief, the RWT level transmitter 2LT-5637-2 will fail low. The SRO should enter Tech Specs 3.3.2.1 ESF Actuation system instrumentation and 3.3.3.6 Post accident instrumentation. The BOP will be required to bypass the Plant Protection System channel 2 for RWT level point 18.

When the appropriate Tech Specs have been entered and the BOP goes to the back panel to bypass point 18 and cued by lead examiner; the A Service Water Pump (2P-4A) winding temperature will come into alarm. The SRO will use the Annunciator Corrective action and direct swapping service water pumps. The BOP will swap service water pumps by placing 2P-4B Service Water Pump in service supplying loop 1 Service Water.

After the Crew has swapped service water pumps and cued by lead examiner, a primary to secondary leak will start. The SRO will enter the primary to secondary leakage AOP, OP 2203.038.

ATC and BOP will perform RCS Leak rate determinations. The SRO will enter Tech Spec 3.4.6.2.

The SRO will direct the NLOs to control secondary contamination using standard attachment 19 and direct the chemists to sample the SGs for activity. The crew will isolate Main steam from A Steam Generator to 2P-7A EFW pump and commence a plant shutdown using boration from Boric Acid Make up tank.

Revision 0 Page 2 of 3

Appendix D Scenario 2 Form ES-D-1 SCENARIO #2 NARRATIVE (continued)

When the boration is started 2P-39B Boric Acid Makeup pump will trip and the ATC will need to swap boric acid make up pumps. If the ATC attempts to use the gravity feed boration method, it will not work due to the Volume Control tank outlet valve not closing. The SRO may refer to the TRM for boration flow paths.

After the ATC has performed the required power reduction and cued by the lead examiner, the primary to secondary leak value will ramp up to 200 GPM. The Crew will recognize that the leak rate is greater than reactor trip criteria of 44 GPM. The SRO will direct tripping the reactor and actuating Safety Injection Actuation Signal and Containment Cooling Actuation Signal.

The Crew will implement Standard Post Trip Actions (SPTA), OP 2202.001. When the reactor trips one CEA will remain withdrawn which requires emergency boration. The VCT outlet will remain open and emergency borate valve will fail to auto open from SIAS. The ATC will commence emergency boration by opening 2CV-4916-2 emergency borate valve. Two LPSI and HPSI injection valves fail to automatically open. The BOP will open HPSI valves and the crew may determine to open the LPSI even though they are not currently required for plant conditions.

The ATC will secure two Reactor coolant Pumps when RCS pressure goes below 1400 psia. The Crew will lower Steam Dump master controller setpoint during SPTAs to aid in maintaining margin to saturation. The BOP will also override Service Water to Component Cooling water to allow RCP operation.

The SRO will diagnose a Steam Generator Tube Rupture event and enter OP 2202.004, Steam Generator Tube Rupture. The ATC will cool down the RCS to less than 535°F using the bypass valves to the condenser. The BOP will override Service Water to Auxiliary Cooling Water. The BOP will isolate the A SG using standard attachment 10 when RCS Thot is less than 535°F.

Revision 0 Page 3 of 3