2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)

From kanterella
(Redirected from 2CAN070802)
Jump to navigation Jump to search
Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)
ML081850034
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/01/2008
From: James D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2CAN070802
Download: ML081850034 (8)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4619 Dale E. James Manager, Licensing Arkansas Nuclear One 2CAN070802 July 1, 2008 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Inservice Inspection Summary Report for The Nineteenth Refueling Outage (2R19)

Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6

REFERENCE:

NRC Letter to Entergy dated October 20, 2000, Arkansas Nuclear One, Unit 2 - Relief Request Nos. CEP-ISI-003, Revision 0, and CEP-ISI-005, Revision 0, Related to the American Society of Mechanical Engineers (ASME) Code Requirements

Dear Sir or Madam:

Article IWA-6000 of Section XI of the 1992 Edition of the ASME Code requires an inservice inspection report be submitted to regulatory and enforcement authorities having jurisdiction at the plant site. The summary report is to contain the completed Form NIS-1, Owners Report for Inservice Inspection, and Form NIS-2, Owners Report for Repair or Replacement.

Article IWA-4900 reiterates the requirement to complete the NIS-2 forms for repair replacement.

In the referenced letter, the NRC approved the Entergy relief request to use Code Case N-532, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000. This code case allows Entergy to prepare an Owners Activity Report Form OAR-1 in place of the code required NIS-1 and NIS-2 forms.

This report is to be prepared at the completion of a refueling outage and submitted within 90 calendar days of the completion of the refueling outage.

2CAN070802 Page 2 of 2 Attached is the completed Form OAR-1 for Arkansas Nuclear One, Unit 2 (ANO-2) for your information. Included with the form are tables listing the Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service and Abstract of Repair/Replacement Activities Required for Continued Service in accordance with Code Case N-532. The results contained in this completed form are for the nineteenth refueling outage for ANO-2 (2R19).

This letter contains no new commitments.

By means of this submittal, the reporting requirements of IWA-6000 are fulfilled for 2R19.

If you have any questions or require additional information, please contact me.

Sincerely, DEJ/rwc

Attachment:

Form OAR-1, Owners Activity Report cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U.S. Nuclear Regulatory Commission Attn: Mr. Alan B. Wang MS O-7 D1 Washington, DC 20555-0001 Mr. Bernard R. Bevill Director Division of Radiation Control and Emergency Management Arkansas Department of Health & Human Services P.O. Box 1437 Slot H-30 Little Rock, AR 72203-1437

ATTACHMENT TO 2CAN070802 FORM OAR-1 OWNERS ACTIVITY REPORT

Attachment to 2CAN070802 Page 1 of 5 FORM O AR-1 OWNER'S ACTIVITY REPORT Report Number OAR-2331 Plant Arkansas Nuclear One / 1448 S.R. 333, Russellville, AR. 72802 Unit No. 2 Commercial service date March 26, 1980 Refueling outage no. 2R19 (If applicable)

Current inspection interval Third (3rd) Inspection Interval (1st, 2nd, 3rd, 4th, other)

Current inspection period Third (3rd) Inspection Period (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plan 1992 Edition, Portions of 1993 Addenda for Pressure Testing Date and revision of inspection plan May 27, 2008 / Revision 303 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan Same Code Cases used: N-416-2, N-532-4 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations, tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 2R19 conform to the requirements of Section XI.

(refueling outage number)

Signed Original signed by Richard E. Holman Date 06/10/2008________

Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arkansas and employed by HSBCT of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Original signed by Carl Thompson Commissions NB-9985, ARK-1054 "A" "B" "N" "I" " NS" Inspector's Signature National Board, State, Province, and Endorsements Date 06/10/2008

Attachment to 2CAN070802 Page 2 of 5 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description F-A Spring Support 2BCA-14-H11 Loose Pipe Clamp F1.10C (ISI # 43-048) (CR-ANO-2-2008-0659)

F-A One-Way Restraint 2CCA-27-H001 Install missing locking nut F1.10A (ISI # 40-058) (CR-ANO-2-2008-0748)

F-A One-Way Restraint 2CCA-16-H9 Install missing locking nut & cotter pin F1.10A (ISI # 29-061) (CR-ANO-2-2008-0755)

F-A Valve Operator Support 2CCA-26-H020 Configuration Discrepancies F1.10A (CR-ANO-2-2008-0786)

Attachment to 2CAN070802 Page 3 of 5 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Date Repair/Replacement Plan Class Item Description Description of Work Completed Number & Work Order Number 3 Cooling Coil Replaced cooling coil 2VUC-1C 28-Feb-2007 Plan # 06-2064, WO # 00050858 3 Cooling Coil Replaced cooling coil 2VUC-1B 28-Feb-2007 Plan # 06-2073, WO # 00050855 2 Support Replaced jam nut on support 2DCB-501-H7 28-Aug-2007 Plan # 06-2075, WO # 00084664 Replaced valve 2CVC-139 body to bonnet 2 Valve fasteners 9-Apr-2008 Plan # 07-2063, WO # 00901125 2 Valve Replaced valve disc on 2CV-5017-1 5-Apr-2008 Plan # 07-2066, WO # 00092651 Replaced 2VCC-2C manifold header piping 3 Pipe and flanges. Invoked CC N-416-2. 4-Apr-2008 Plan # 07-2072, WO # 00092303 Replaced 2VCC-2D manifold header piping 3 Pipe and flanges. Invoked CC N-416-2. 4-Apr-2008 Plan # 07-2073, WO # 00092304 2 Pump Replaced pump 2P-35B casing fasteners 29-Oct-2007 Plan # 07-2074, WO # 00078346 2 Valve Replaced valve disc on 2CV-5057-2 6-Apr-2008 Plan # 07-2079, WO # 00096136 Removed/reinstalled support 2HCC-237 3 Support H2 kicker 26-Nov-2007 Plan # 07-2080, WO # 00078346 Removed/reinstalled support 2DCB 2 Support H002 kicker 26-Nov-2007 Plan # 07-2081, WO # 00078346

Attachment to 2CAN070802 Page 4 of 5 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Date Repair/Replacement Plan Class Item Description Description of Work Completed Number & Work Order Number Structural weld overlay on 2BCA-1-12" 1 Pipe (Hot leg Surge nozzle) 7-Apr-2008 Plan # 07-2082, WO # 00064393 Structural weld overlay on 2CCA-25-14" 1 Pipe (Hot leg Shutdown Cooling nozzle) 7-Apr-2008 Plan # 07-2083, WO # 00064393 Structural Weld overlay on 2CCA-32-2 1 Pipe (Hot leg drain nozzle) 7-Apr-2008 Plan # 07-2084, WO # 00064393 1 Valve Rotated valve 2PSV-4633 7-Apr-2008 Plan # 07-2090, WO # 00116750 Replaced 2HBC-51-16" & 18" Service 3 Pipe Water Pipe. Invoked CC N-416-2. 28-Mar-2008 Plan # 07-2091, WO # 00068990 Re-installed 2HCC-252-2" piping.

3 Pipe Invoked CC N-416-2. 28-Mar-2008 Plan # 07-2092, WO # 00068990 Welded repair on 2HCC-300-3".

3 Pipe Invoked CC N-416-2. 26-Nov-2007 Plan # 07-2093, WO # 00123185 2 Valve Replaced valve bonnet on 2CVC-22A 15-Jan-2008 Plan # 08-2000, WO # 00088186 2 Valve Replaced valve bonnet on 2CVC-69A 15-Jan-2008 Plan # 08-2001, WO # 00088183 Replaced valve 2SW-1550.

3 Valve Invoked CC N-416-2. 10-Apr-2008 Plan # 08-2003, WO # 00118353 Re-installed 2HCB-45-3" piping.

2 Pipe Invoked CC N-416-2. 5-Apr-2008 Plan # 08-2007, WO # 00122350

Attachment to 2CAN070802 Page 5 of 5 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Date Repair/Replacement Plan Class Item Description Description of Work Completed Number & Work Order Number Replaced flange on 2HBC-64-6".

3 Pipe Invoked CC N-416-2. 4-Apr-2008 Plan # 08-2008, WO # 00101663 2 Valve Replaced valve disc on 2CV-4826. 31-Mar-2008 Plan # 08-2013, WO # 00122350 3 Support Replaced support 2HBC-51-H4 shims. 5-Apr-2008 Plan # 08-2016, WO # 00068990 2 Support Replaced support 2DCB-4-H1 lost hex nuts. 5-Apr-2008 Plan # 08-2018, WO # 51084565 2 Valve Tack welded disc to disc nut on 2SI-3A. 26-Mar-2008 Plan # 08-2019, WO # 00143080 Notes: Unit 2, 3rd Interval, 3rd Period.

Table 2 is an abstract for all ASME Section XI Repair/Replacement activities performed during Cycle 19 to comply with site procedures.