| Q | CCA | Title |
---|
05000528/FIN-2013004-02 | 2013Q3 | P.5 | Failure to Include Inspection Requirements in Preventative Maintenance Basis |
05000528/FIN-2013004-01 | 2013Q3 | | Failure to Maintain an Effective Emergency Plan for a Seismic Event |
05000528/FIN-2013407-01 | 2013Q4 | P.5 | Security |
05000529/FIN-2013005-02 | 2013Q4 | P.5 | Failure to Replace Oil Soaked Insulation Results in a Fire |
05000528/FIN-2013005-01 | 2013Q4 | H.6 | Inadequate Modification of Safety Related Accumulators |
05000528/FIN-2013009-03 | 2014Q1 | | Failure to Establish Adequate Procedures for an Alternate Source of Spray Pond Inventory |
05000528/FIN-2014002-03 | 2014Q1 | P.5 | Failure to Establish Adequate Procedures for Performing Nitrogen Pre-Charge Checks |
05000528/FIN-2014002-02 | 2014Q1 | H.13 | Failure to Comply with Technical Specification 3.7.2 |
05000528/FIN-2014002-01 | 2014Q1 | H.9 | Failure to Follow Protected Equipment Procedure |
05000528/FIN-2014002-04 | 2014Q1 | H.13 | Failure to Declare an Unusual Event |
05000528/FIN-2013009-04 | 2014Q1 | H.1 | Failure to Follow Surveillance Testing Procedure |
05000528/FIN-2013009-01 | 2014Q1 | H.7 | Failure to Translate Design Basis Requirements for Establishing Operability of the Spray Pond System |
05000528/FIN-2014007-02 | 2014Q1 | H.13 | Failure to Follow Station Process for Root Cause Evaluation |
05000528/FIN-2014007-01 | 2014Q1 | H.13 | Failure To Provide Adequate Technical Justification For Operability of Containment Spray and Diesel Fuel Oil Systems |
05000528/FIN-2013009-05 | 2014Q1 | H.3 | Improper Extension of Surveillance Interval for Surveillance Requirements Associated with the Engineered Safety Features Actuation Signal System Sequencer and Relays |
05000528/FIN-2013009-02 | 2014Q1 | H.14 | Deficiencies in Emergency Diesel Generator Engine Room and Control Room Ventilation Air Flow Testing and Evaluation |
05000530/FIN-2014003-01 | 2014Q2 | H.11 | Failure to Follow Operator Challenges Procedure |
05000528/FIN-2014405-01 | 2014Q2 | | Security |
05000528/FIN-2014003-03 | 2014Q2 | | Leakage on Reactor Vessel Bottom-Mounted Instrumentation Nozzle 3 |