| Q | CCA | Title |
---|
05000483/FIN-2009005-02 | 2009Q4 | H.14 | Two Examples of Failure to Follow Operability Determination Procedure |
05000483/FIN-2009005-01 | 2009Q4 | | Failure to Maintain an Adequate Flooding Analysis |
05000483/FIN-2009005-03 | 2009Q4 | H.11 H.12 | Plant Transient Caused by Human Error During Power Range Nuclear Instrument Surveillance |
05000483/FIN-2010002-02 | 2010Q1 | | Failure to Ensure Suitable Replacement Parts Essential for the Operation of the Component Cooling Water System |
05000483/FIN-2010002-01 | 2010Q1 | H.14 | Failure to Follow Operability Determination Procedure |
05000483/FIN-2010002-03 | 2010Q1 | | Failure to Maintain an Adequate Ultimate Heat Sink Thermal Performance Analysis |
05000483/FIN-2010003-01 | 2010Q2 | H.14 | Inadequate Surveillance Procedure to Verify and Maintain Emergency Core Cooling System Operable |
05000483/FIN-2010003-02 | 2010Q2 | H.5 | Failure to Maintain Two Operable Source Range Channels During Core Alterations |
05000483/FIN-2010003-03 | 2010Q2 | H.5 | Failure to Ensure Completion of Corrective Actions for Degraded Chemical and Volume Control System Valves |
05000483/FIN-2010003-04 | 2010Q2 | | Failure to Correctly Fabricate Replacement Gasket for Emergency Diesel Generator Train A |
05000483/FIN-2010007-01 | 2010Q3 | P.5 | Failure to Identify Lack of Maintenance as Cause of Diesel Generator Failure |
05000483/FIN-2010004-02 | 2010Q3 | | Failure to Accurately Report a Condition that Could Have Prevented Fulfillment of a Safety Function |
05000483/FIN-2010004-01 | 2010Q3 | H.7 | Failure to Implement Adequate Administrative Controls for Failed Containment Isolation Valve |
05000483/FIN-2010403-01 | 2010Q3 | H.7 | Security |