| Q | CCA | Title |
---|
05000461/FIN-2017201-01 | 2017Q3 | H.5 | Security |
05000461/FIN-2017007-01 | 2017Q3 | H.1 | Failure to Evaluate Defeating Reactor Core Isolation Cooling System Interlocks and Trips before Adding Them to an Emergency Operating Support Procedure |
05000461/FIN-2017003-01 | 2017Q3 | H.6 | MSIV TS Leakage Limits Exceeded Due to Condition Based Maintenance Approach |
05000461/FIN-2017003-02 | 2017Q3 | H.1 | Failure to Adequately Control Access in Locked High Radiation Area |
05000461/FIN-2017003-03 | 2017Q3 | H.13 | Failure to Perform Engineering Evaluation to Determine the Cause of Failure of Snubbers |
05000461/FIN-2017003-04 | 2017Q3 | H.14 | Flow Control Valves Not Locked Out Results in Reactor Recirculation Pump Runback |
05000461/FIN-2017003-05 | 2017Q3 | H.9 | Failure to Establish Secondary Containment Prior to Entering MODE 2 |
05000461/FIN-2017009-01 | 2017Q3 | H.11 | Failure to Evaluate Replacement Relay Dropout Voltage |
05000461/FIN-2017011-01 | 2017Q4 | P.2 | Failure to Correct an Identified Degraded Condition on the Division 3 Shutdown Service Water Pump |
05000461/FIN-2017004-04 | 2017Q4 | | Failure to Perform an Evaluation in Accordance with 10 CFR 72.48 for Changes Made to the Time-to-Boil Calculation |
05000461/FIN-2017004-03 | 2017Q4 | H.8 | Failure to Identify the Extent of Condition for an Inadequate 10 CFR 50.59 Evaluation |
05000461/FIN-2017004-02 | 2017Q4 | H.5 | Failure to Assess and Manage Risk Associated with the Performance of Control Rod Time Testing |
05000461/FIN-2017004-01 | 2017Q4 | H.5 | Reactor Down Power due to Reactor Recirculation Pump Motor Lower Bearing Oil Leak |
05000461/FIN-2017012-03 | 2017Q4 | | Evaluation of RCE 04082490, Reactor Scram from Trip of 1AP07EJ) |
05000461/FIN-2017012-02 | 2017Q4 | H.13 | Failure to Properly Classify Non-Safety Related Auxiliary Transformers as Operationally Critical Components |
05000461/FIN-2017012-01 | 2017Q4 | H.5 | Failure to Perform a Corrective Action to Prevent Recurrence |
05000461/FIN-2018001-01 | 2018Q1 | | Failure to Follow Procedure Results in Unplanned Reactor Core Isolation Cooling Unavailability |
05000461/FIN-2018001-02 | 2018Q1 | | Failure to Identify a Single Point Vulnerability Results in Manual Reactor Scram |
05000461/FIN-2018002-04 | 2018Q2 | | Minor Violation |
05000461/FIN-2018002-05 | 2018Q2 | | Minor Violation |
05000461/FIN-2018002-03 | 2018Q2 | | Minor Violation |
05000461/FIN-2018050-03 | 2018Q2 | H.6 | Equipment Operator Rounds Points Inadequate Acceptance Criteria |
05000461/FIN-2018050-02 | 2018Q2 | H.12 | Failure to Promptly Identifya Condition Adverse to Quality |
05000461/FIN-2018050-01 | 2018Q2 | H.2 | Failure to Follow Multiple Procedure |
05000461/FIN-2018002-02 | 2018Q2 | | Failure to Establish Adequate Leak Rate Test Procedures for Shutdown Service Water Isolation Valve Testing |
05000461/FIN-2018002-01 | 2018Q2 | H.6 | Failure to Perform an Operability Determination for Suspected Leakage Past Shutdown Service Water Isolation Valves |