05000458/FIN-2016002-02
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Conduct Common Cause Failure Evaluation in Response to Inoperable Emergency Diesel Generator |
| Description | The inspectors identified a non-cited violation of Technical Specification 3.8.1, AC Sources Operating, for the licensees failure to take required actions for an inoperable emergency diesel generator. Specifically, after classifying the Division I emergency diesel generator as inoperable on the basis of a nonconforming condition discovered during an extended maintenance outage, and after failing to either verify that the Division II emergency diesel generator was not inoperable due to common cause failure within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or conduct a surveillance run on the Division II emergency diesel generator within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the licensee failed to enter Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, as required by Actions C.3.1, C.3.2, and G.1 of Technical Specification 3.8.1, respectively. The licensee entered this issue into their corrective action program as Condition Report CR-RBS-2016-03978. Corrective actions included the scheduling of training to ensure that operations personnel fully understand the technical specification requirements for common cause evaluation as they relate to adverse conditions on emergency diesel generators. The failure to take required actions for an inoperable emergency diesel generator was a performance deficiency. The performance deficiency was more than minor, and therefore a finding, because it was associated with the equipment reliability attribute of the Mitigating Systems Cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to follow technical specification requirements to ensure the availability, reliability, and capability of the operable emergency diesel generator directly affected the cornerstone objective. Using NRC Inspection Manual Chapter 0609, Significance Determination Process, Appendix A, Exhibit 2 -- Mitigating Systems Screening Questions, the inspectors determined the finding to be of very low safety significance (Green) because the finding did not represent an actual loss of function of the Division II emergency diesel generator. The finding had a cross-cutting aspect in the area of human performance, consistent process, because the licensee failed to use a consistent, systematic approach to make decisions. Specifically, the licensee failed to review the required actions of the applicable technical specification so as to ensure that all of those actions would be properly carried out [H.13]. |
| Site: | River Bend |
|---|---|
| Report | IR 05000458/2016002 Section 4OA2 |
| Date counted | Jun 30, 2016 (2016Q2) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | B Parks F Ramirez G Warnick J Sowa L Brookhart M Phalen P Hernandez |
| Violation of: | Technical Specification |
| CCA | H.13, Consistent Process |
| INPO aspect | DM.1 |
| ' | |
Finding - River Bend - IR 05000458/2016002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (River Bend) @ 2016Q2
Self-Identified List (River Bend)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||