| Q | CCA | Title |
---|
05000458/FIN-2011002-05 | 2011Q1 | | Reduction in ERO Staffing Decreased Emergency Plan Effectiveness |
05000458/FIN-2011002-01 | 2011Q1 | H.2(a) H.6 | Repetitive Service Water Pressure Control Valves Diaphragm Failures Affecting Control Building Chillers Operability |
05000458/FIN-2011002-02 | 2011Q1 | | Failure to Determine the Appropriate Preventive Maintenance Strategy and Task Frequency for the Reactor Core Isolation Cooling System Turbine Lube Oil Cooler Inlet Pressure Control Valve |
05000458/FIN-2011002-03 | 2011Q1 | P.5 P.2(b) | Inadequate Control Rod Inspection Procedure |
05000458/FIN-2011002-04 | 2011Q1 | P.2 | Feedwater Control System Inadequate Corrective Actions Results in Power Transient |
05000458/FIN-2011002-06 | 2011Q1 | H.5 | Failure to Properly Control and Guard the Entrance to a Locked High Radiation Area |
05000458/FIN-2011002-07 | 2011Q1 | P.5 P.2(b) | Failure to Implement Procedure AOP-0027, Fuel Handling Mishaps |
05000458/FIN-2011002-08 | 2011Q1 | P.5 | Failure to follow Fuel Handling Guidelines |
05000458/FIN-2011403-01 | 2011Q1 | H.9 | Security |
05000458/FIN-2011003-01 | 2011Q2 | H.7 | Failure To Track And Document Plant Equipment Oil Usage |
05000458/FIN-2011006-01 | 2011Q2 | | Failure to Take Corrective Action for Service-Induced Failures of Gould J-series Relays |
05000458/FIN-2011004-02 | 2011Q3 | H.13 | Ineffective Corrective Actions on the Main Steam Equalizing Header Drain Bypass Valve Results in an Unplanned Down Power |
05000458/FIN-2011004-01 | 2011Q3 | H.14 | Inadequate Standby Gas Treatment Electric Heater Power Output Calculation |
05000458/FIN-2011008-06 | 2011Q4 | | Failure to Obtain NRC Approval for Change to Ultimate Heat Sink Inventory Requirements |
05000458/FIN-2011008-04 | 2011Q4 | | Station Blackout-Containment Venting |
05000458/FIN-2011402-01 | 2011Q4 | H.14 | Security |
05000458/FIN-2011008-09 | 2011Q4 | H.9 | Inadequate Simulator Fidelity for Emergency Diesel Generator Loading |
05000458/FIN-2011008-08 | 2011Q4 | P.5 | Inadequate Emergency and Abnormal Procedures for Standby Diesel Generator Fail to Load Sequences |
05000458/FIN-2011008-07 | 2011Q4 | H.9 | Inadequate Abnormal Procedure for Reducing Loads on Standby Diesel Generators |
05000458/FIN-2011008-05 | 2011Q4 | | Inadequate Procedures for Monitoring Standby Service Water System Leakage |
05000458/FIN-2011008-03 | 2011Q4 | | Failure to Establish Residual Heat Removal Heat Exchanger Testing Frequency |
05000458/FIN-2011008-02 | 2011Q4 | P.2 | Failure to Use Conservative Design Assumptions in the Ultimate Heat Sink Inventory Calculation |
05000458/FIN-2011008-01 | 2011Q4 | P.2 | Inadequate Testing of Division I and Division III Standby Diesel Generators |
05000458/FIN-2011005-02 | 2011Q4 | H.2 | Failure to Adequately Monitor the Performance of the Control Building Chiller System |
05000458/FIN-2011005-01 | 2011Q4 | H.12 | Standby Service Water Pump Motor Lubrication Deficiencies |