| Q | CCA | Title |
---|
05000458/FIN-2009402-01 | 2009Q4 | H.14 | Security |
05000458/FIN-2009005-02 | 2009Q4 | H.7 | Failure to Ensure the Emergency Contact had Knowledge About a Shipment |
05000458/FIN-2009005-01 | 2009Q4 | | Main Steam Line Plus Seal Failure Results in Loss of Reactor Cavity Inventory |
05000458/FIN-2010002-03 | 2010Q1 | H.2(a) H.6 | Failure to Adequately Verify a Suitable Replacement Part Essential for Emergency Diesel Generator Operation |
05000458/FIN-2010002-02 | 2010Q1 | | Failure to Verify Control Building Chiller Operability During Low Service Water Temperatures |
05000458/FIN-2010002-01 | 2010Q1 | H.5 | Failure to Evaluate a Revised Equipment Tag Out |
05000458/FIN-2010003-01 | 2010Q2 | | Inadequate Risk Assessment for High Pressure Core Spray Pump Room Unit Cooler Maintenance |
05000458/FIN-2010201-01 | 2010Q2 | H.7 | Security |
05000458/FIN-2010003-03 | 2010Q2 | H.11 H.12 | Failure to Follow Radiation Work Permit Instructions |
05000458/FIN-2010003-02 | 2010Q2 | | Inadequate Procedure Results in Loss of Offsite Power to a 4160 Vac Safety Bus |
05000458/FIN-2010006-03 | 2010Q2 | | Failure to Implement and Maintain in Effect all Provisions of the Approved Fire Protection Program |
05000458/FIN-2010006-04 | 2010Q2 | | Failure to Implement and Maintain in Effect all Provisions of the Approved Fire Protection Program |
05000458/FIN-2010006-02 | 2010Q2 | H.7 | Failure to Ensure Alternative Shutdown Procedure could be Implemented as Written |
05000458/FIN-2010006-01 | 2010Q2 | H.4 H.5 | Failure to Ensure at Least One Train of Equipment Necessary to Achieve Hot Shutdown Conditions is Free of Fire Damage |
05000458/FIN-2010004-06 | 2010Q3 | | Inadequate Maintenance Results in Unplanned Opening of Main Turbine Bypass Valve |
05000458/FIN-2010004-05 | 2010Q3 | | Inadequate High Pressure Core Spray Pump Room Cooler Bearing Maintenance |
05000458/FIN-2010004-04 | 2010Q3 | H.14 | Failure to Maintain Licensed Operator Examination Integrity |
05000458/FIN-2010004-03 | 2010Q3 | | Use of a decommissioning funding mechanism that did not meet the requirements of 10 CFR 50.75(e)(1)(v) |
05000458/FIN-2010004-02 | 2010Q3 | | Failure to provide complete and accurate information by failing to disclose its reliance on a contract in the March 2009 funds status report (10 CFR 50.75(f)(1) and 10 CFR 50.9) |
05000458/FIN-2010004-01 | 2010Q3 | | Failure to provide adequate decommissioning funding assurance from Dec. 31, 2008 through the present (10 CFR 50.75(b)) |