| Q | CCA | Title |
---|
05000454/FIN-2013007-01 | 2013Q3 | P.1 | Inadequate Identification of Fire Curtain Sprinkler Degradation for an Auxiliary Building Stairwell |
05000454/FIN-2013004-03 | 2013Q3 | | Ultimate Heat Sink Design Changes |
05000454/FIN-2013004-02 | 2013Q3 | | Ultimate Heat Sink Limiting Design Basis Event |
05000454/FIN-2013004-01 | 2013Q3 | | 10 CFR 50.59 Evaluation Affecting Tornado Analysis |
05000454/FIN-2013004-04 | 2013Q3 | | Reduced Decay Time |
05000454/FIN-2013408-02 | 2013Q3 | | Security |
05000454/FIN-2013408-01 | 2013Q3 | | Security |
05000454/FIN-2013007-03 | 2013Q3 | | Acceptance Criteria for Battery Voltage in TS Surveillance Procedure Failed to Account for Test Equipment Uncertainty |
05000454/FIN-2013007-02 | 2013Q3 | H.11 H.12 | Failure to Properly Assess Operability of the 2A EDG Following Post-Modification Testing |
05000455/FIN-2013005-07 | 2013Q4 | H.7 | Inadequate Reactor Vessel Stress Analysis for Unit 2 Missing Head Stud |
05000455/FIN-2013005-06 | 2013Q4 | P.3 | Corrosion Effects on the Unit 2 Reactor Vessel Not Monitored |
05000455/FIN-2013005-05 | 2013Q4 | H.14 | Reactor Vessel Design Documents Not Updated to Reflect Unit 2 Missing Head Stud |
05000455/FIN-2013005-04 | 2013Q4 | H.14 | Analytical Basis for PTL Curves Not Maintained Consistent With the Unit 2 Vessel Head Stud Configuration |
05000454/FIN-2013005-03 | 2013Q4 | | Failure to Implement Preventative Maintenance Procedure Replacement Schedules for Essential Service Water makeup Pump Diesel Engine Hoses |
05000454/FIN-2013005-02 | 2013Q4 | | Intake Structure Silt Level Acceptance Criteria Were Non-Conservative |
05000454/FIN-2013005-01 | 2013Q4 | | Essential Service Water Blowdown Isolation Valves Not Tested |
05000454/FIN-2014002-01 | 2014Q1 | | Failure to Properly Implement a Compensatory Fire Watch As Required by the Fire Protection Program |