| Q | CCA | Title |
---|
05000454/FIN-2012012-01 | 2012Q4 | | Failure to provide complete and accurate decommissioning status reports |
05000454/FIN-2012005-04 | 2012Q4 | | Concerns with the Bases for the Acceptability of GOTHIC for Void Transport Prediction |
05000454/FIN-2012005-02 | 2012Q4 | | Inadequate Work Instructions Lead to Failure of the 1B SX Pump Motor |
05000454/FIN-2012005-01 | 2012Q4 | P.2 | Failure to Prevent Excessive Silt Buildup in the 1B Safety Injection Pump Oil Cooler |
05000454/FIN-2012005-03 | 2012Q4 | | Failure to Submit a 10 CFR 50.73(a)(2)(v) Report for Inoperable Containment Area Radiation Monitors |
05000454/FIN-2013002-02 | 2013Q1 | H.12 | Failure to Properly Scope All Pertinent External Flood Protection Features into Walkdown Lists in Accordance with Industry Guidance NEI 12-07 |
05000454/FIN-2013002-01 | 2013Q1 | | Embedment Plate Design Deficiencies |
05000454/FIN-2013003-01 | 2013Q2 | H.5 | Inaccurate Risk Assessment |
05000454/FIN-2013003-02 | 2013Q2 | H.12 | Failure to Establish a Procedure to Control the Spent Fuel Pool Cooling System |
05000454/FIN-2013007-01 | 2013Q3 | P.1 | Inadequate Identification of Fire Curtain Sprinkler Degradation for an Auxiliary Building Stairwell |
05000454/FIN-2013007-02 | 2013Q3 | H.11 H.12 | Failure to Properly Assess Operability of the 2A EDG Following Post-Modification Testing |
05000454/FIN-2013007-03 | 2013Q3 | | Acceptance Criteria for Battery Voltage in TS Surveillance Procedure Failed to Account for Test Equipment Uncertainty |
05000454/FIN-2013408-01 | 2013Q3 | | Security |
05000454/FIN-2013408-02 | 2013Q3 | | Security |
05000454/FIN-2013004-04 | 2013Q3 | | Reduced Decay Time |
05000454/FIN-2013004-01 | 2013Q3 | | 10 CFR 50.59 Evaluation Affecting Tornado Analysis |
05000454/FIN-2013004-02 | 2013Q3 | | Ultimate Heat Sink Limiting Design Basis Event |
05000454/FIN-2013004-03 | 2013Q3 | | Ultimate Heat Sink Design Changes |