05000443/LER-2006-002, Re Noncompliance with the Requirements of Technical Specification 6.8.1.2.a
| ML061020547 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 04/07/2006 |
| From: | St.Pierre G Florida Power & Light Energy Seabrook |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| SBK-L-06074 LER 06-002-00 | |
| Download: ML061020547 (4) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 4432006002R00 - NRC Website | |
text
FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 April 7, 2006 Docket No. 50-443 SBK-L-06074 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Licensee Event Report (LER) 2006-002-00 for Noncompliance with the Requirements of Technical Specification 6.8.1.2.a Encloscd is Licensee Event Report (LER) 2006-002-00. This LER reports an event that occurred at Seab:-ook Station on March 8, 2006. This event is being reported pursuant to the requirements of Facility Operating License Condition 2.G.
Should you require further information regarding this matter, please contact Mr. James M.
Peschel, Regulatory Programs Manager, at (603) 773-7194.
Very truly yours, FPL Energy Seabrook, LLC Gene St. Pierre Site Vice President cc:
S. J. Collins, NRC Region I Administrator G. E. Miller, NRC Project Manager, Project Directorate 1-2 G. T. Dentel, NRC Senior Resident Inspector j7
an FPL Group company
ENCLOSURE TO SBK-L-06074
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 06/30/2007 (6.2004)
, the NRC may digits/characters for each block) not conduct or sponsor, and a person is not required to respond to. the
- 3. PAGE Seabrook Station 05000 443 1 OF 2
- 4. TITLE Noncompliance with the Requirements of Technical Specification 6.8.1.2.a
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED SQETA REFACILITY NAME DOCKET NUMBER MONTH DAY lEAR YEAR SEQUENTIAL REV MONTH I DAY YEAR I
D5000 FACILITY NAME DOCKET NUMBER 03 08 2.006 2006 - 002 -
00 04 07 2006 D5000
- 9. OPERATING MODE
- 1. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR§: (Checkall tnat apply)
O 20.2201(b)
El 20.2203(a)(3)(i)
El 50.73(a)(2)(i)(C)
El 50.73(a)(2)(vii) l E
20.2201(d) a 20.2203(a)(3)(1i) 0 50.73(a)(2)(ii)(A)
El 50.73(a)(2:(viii)(A) l 20.2203(a)(1)
[E 20.2203(a)(4)
El 50.73(a)(2)(ii)(B) al 50.73(a)(2:(viii)(B) o 20.2203(a)(2)(i)
El 50.36(c)(1)(i)(A)
El 50.73(a)(2)(iii)
El 50.73(a)(2(ix)(A)
- 10. POWER LEVEL El 20.2203(a)(2)(ii)
E 50.36(c)(1)(ii)(A)
El 50.73(a)(2)(iv)(A)
El 50.73(a)(2(x) o 20.2203(a)(2)(iii)
El 50.36(c)(2)
El 50.73(a)(2)(v)(A)
El 73.71(a)(4.
El 20.2203(a)(2)(iv)
El 50.46(a)(3)(ii) 0 50.73(a)(2)(v)(B)
El 73.71(a)(5.
100 E 20.2203(a)(2)(v)
El 50.73(a)(2)(i)(A)
El 50.73(a)(2)(v)(C) 0 OTHER E] 20.2203(a)(2)(vi)
El 50.73(a)(2)(i)(B)
D 50.73(a)(2)(v)(D)
Specify in Abstract below or In (11 more space is required, use additional copies of NRC Form 366A) (17)
I.
Description of Event
At approximately 0800 on March 8, 2006 it was discovered that the annual report tabulating exposure by % ork and job function required by TS 6.8.1.2.a was not submitted by the March 1 due date. The requirement to submit the report was tracked by Seabrook Station's Condition Reporting System.
In early February, a Regulatory Compliance Analyst contacted Radiation Protection (RP) Records for the report. RP Records personnel contacted the NRC's Radiation Exposure Information and Reporting System (REIRS) regarding report submittal and was told reports were due April 30. Based on the information relayed from REIRS, the Regulatory Compliance Analyst inappropriately changed the due date in the condition report to April 30 without reviewing Technical Specification 6.8.1.2a. On March 8, while confirming due dates for April correspondence, it was discovered that the report known at Seabrook Station as the Annual Report on Radiation Exposure by Job Function was required to be submitted by March 1. A 24-hour report (EN 42397) was made to the NRC for a violation of an administrative technical specification.
II. Cause o1 Event The cause of the event is personnel error on the part of the Regulatory Compliance Analyst due to inadequate qualification, validation and verification (Q V & V) of information provided by RP personnel.
Ill. Analysis of Event The Regulatory Compliance Analyst did not use human performance tools to verify the due date of the Technical Specification required report prior to changing the due date on the condition report.
The failure to submit the report on schedule was an administrative error that did not affect the operation of the Unit. Therefore, there were no safety consequences.
IV. Corrective Action
All condition reports for Technical Specification required reports were reassigned to the Regulatory Compliance Supervisor and due dates were verified to be correct.
Administrative controls were added to prevent changing due dates for regulatory required reports.
The Radiation Protection Department procedure will be revised to include Technical Specification information and due dates.
A case stidy will be prepared for this event and presented to the Regulatory Compliance Department.
V. AdditionEI Information None
Similar Events
There have been no other occurrences of a report required by Technical Specifications not being submitted by the due date.
Manufacturer Data Not Applicable