Transmittal of LER 2007-S01-00, for Seabrook Station Regarding Loss of Control of Safeguards Information at a Contract Company
ML072490423
Person / Time
Site: Seabrook 
Issue date: 08/31/2007
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-07150 LER 07-001-00
Download: ML072490423 (1)


LER-2007-001, Transmittal of LER 2007-S01-00, for Seabrook Station Regarding Loss of Control of Safeguards Information at a Contract Company
Event date:
Report date:
4432007001R00 - NRC Website

text

FPL Energy Seabrook Station FPL Energy Seabrook Station RO. Box 300 Seabrook, NH 03874 (603) 773-7000 August 31, 2007 Docket No. 50-443 SBK-L-07150 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Licensee Event Report (LER) 2007-SO1-00 Loss of Control of Safeguards Information at a Contract Company Enclosed is Licensee Event Report (LER) 2007-SO 1-00. This event is being reported pursuant to the requirements of 10 CFR 73.71 (d). The enclosure contains security-related information. FPL Energy Seabrook, LLC requests that the enclosure be withheld from public disclosure in accordance with 10CFR 2.390.

Should you require further information regarding this matter, please contact Mr. James M.

Peschel, Regulatory Programs Manager, at (603) 773-7194.

Very truly yours, FPL ENERGY SEABROOK, LLC Gene St. Pierre Site Vice President cc:

Director, Division of Nuclear Security, Office of Nuclear Security and Incident Response S. J. Collins, NRC Region I Administrator G. E. Miller, NRC Project Manager, Project Directorate 1-2 W. J. Raymond, NRC Senior Resident Inspector zzL'~