05000400/FIN-2012007-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Properly Install the Electrical Power Feed Cables for the EOF |
Description | The inspectors identified a Green Non-Cited Violation (NCV) of 10 CFR 50.54(q) for the licensees failure to properly install the electrical power feed cables for the EOF in accordance with the national electrical code (NEC) as required by the Harris Emergency Plan, PLP-201, Revision 57, section 3.5.1.D. Specifically, the licensee failed to ensure that an adequate emergency response facility, EOF was available as required by the Harris Nuclear Plant Emergency Plan, Section 3.5, revision 57, and 10 CFR 50.47(b)(8). This issue was in the licensees CAP as NCR 381658. Upon completion of the corrective actions, the power feed cables and supports met the requirements of NEC Article 230.51 C. The licensees failure to properly install the electrical power feed cables for the EOF in accordance with the NEC as required by the Harris Emergency Plan, PLP-201, Revision 57, section 3.5.1.D was a performance deficiency. The finding was more than minor because it affected the Emergency Preparedness Cornerstone objective of ensuring that the licensee was capable of implementing adequate measures to protect the health and safety of the public in the event of a radiological emergency. Specifically, the Facilities and Equipment attribute was affected during the time when the EOF was degraded due to the power feed cables not being installed in accordance with the NEC, which resulted in not meeting the 10 CFR 50.47(b)(8) Planning Standard program elements. The finding was assessed for significance in accordance with NRC IMC 0609, Appendix B, Emergency Preparedness Significance Determination Process. Attachment 2 of Appendix B, Failure to Comply Significance Logic is as follows: Failure to Comply; Loss of Risk Significant Planning Standard Function (RSPS), NO; RSPS Degraded Function, NO; Loss of Planning Standard Function, NO; results in a Green finding. The inspectors determined that this resulted in a low safety significance finding (Green). The inspectors did not identify a cross-cutting aspect associated with this finding because the performance deficiency occurred twelve years earlier when the power feed cables were initially installed and does not represent current licensee performance. |
Site: | Harris |
---|---|
Report | IR 05000400/2012007 Section 4OA2 |
Date counted | Jun 30, 2012 (2012Q2) |
Type: | NCV: Green |
cornerstone | Emergency Prep |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | J Austin J Dodson P Lessard R Croteau |
INPO aspect | |
' | |
Finding - Harris - IR 05000400/2012007 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Harris) @ 2012Q2
Self-Identified List (Harris)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||