05000397/FIN-2012004-01
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Failure to Enter Applicable LCO for Offsite Power |
| Description | The inspectors identified a non-cited violation of Technical Specification 3.8.1, AC Sources Operating, for the licensees failure to enter and take required actions contained in Technical Specification 3.8.1, Condition A, when removing startup transformer feeder breakers from service for planned maintenance activities. Upon identification the licensee issued Night Order 1411 which documented that if the startup transformer is unable to supply all safety-related busses then the startup transformer offsite power source should be considered inoperable. The licensee entered this issue into the corrective action program as Action Request AR 271413271413 This performance deficiency was more than minor because it affected the configuration control attribute of the Mitigating Systems Cornerstone objective of ensuring the availability of systems that respond to initiating events to prevent undesirable consequences. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, the inspectors determined the performance deficiency was of very low safety significance (Green) because the finding did not represent a loss of safety function, did not represent an actual loss of function of a single train for greater than its technical specification allowed outage time, and did not represent an actual loss of function of one or more non-technical specification equipment for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The inspectors determined that this finding had a cross-cutting aspect in the area of human performance associated with the resources component because the licensee failed to ensure that work packages were complete, accurate, and up-to-date. Specifically, the licensee failed to specify the potential technical specification surveillance requirement impacts when authorizing maintenance on startup transformer feeder breakers. |
| Site: | Columbia |
|---|---|
| Report | IR 05000397/2012004 Section 1R04 |
| Date counted | Sep 30, 2012 (2012Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.04 |
| Inspectors (proximate) | L Ricketson G Guerra C Smith P Elkmann B Tharakan W Walker J Laughlin J Groom M Hayes N Okonkwo N Greene J Dykert E Schrader |
| CCA | H.7, Documentation |
| INPO aspect | WP.3 |
| ' | |
Finding - Columbia - IR 05000397/2012004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Columbia) @ 2012Q3
Self-Identified List (Columbia)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||