| Q | CCA | Title |
---|
05000390/FIN-2015004-05 | 2015Q4 | H.5 | Core Barrel Lift Error Resulted in Unintended high Dose Rates |
05000390/FIN-2015004-06 | 2015Q4 | H.5 | Failure to Identify a Condition Adverse to Quality for Unacceptable Preconditioning of the 1A-A Charging Pump Discharge Check Valve |
05000390/FIN-2015004-03 | 2015Q4 | H.12 | Failure to Comply with Source Range Neutron Flux Channel Technical Specification Requiprements |
05000390/FIN-2015004-01 | 2015Q4 | | Failure to Perform ISI General Visual Examination of Containment Moisture Barrier Associated with Containment Liner Leak-chase Test Connection Threaded Pipe Plugs |
05000390/FIN-2015004-04 | 2015Q4 | | Shield Building Operability Requirements |
05000390/FIN-2015004-02 | 2015Q4 | | AFWST Permanent Plant Modification |
05000390/FIN-2016001-02 | 2016Q1 | H.14 | Inadequate Immediate Determination of Operability for the Auxiliary Control Air System Train A |
05000391/FIN-2016008-03 | 2016Q1 | H.3 | Failure to Perform 50.59 Screenings For Procedures For Unit 2 |
05000391/FIN-2016008-04 | 2016Q1 | H.3 | Failure to Perform Verification and Validation For Abnormal Operating Instructions For Unit 2 |
05000390/FIN-2016001-09 | 2016Q1 | | Appropriateness of Corrective Actions Associated with Safety Related Pump Mechanical Seal Issues and the Effect on Plant Response |
05000390/FIN-2016001-08 | 2016Q1 | | Charging Pump 1B-B Room Cooler Fan Bearing Failure |
05000390/FIN-2016001-07 | 2016Q1 | | Failure to Maintain Operating Logs |
05000390/FIN-2016001-01 | 2016Q1 | H.5 | Failure to Use a Procedure Appropriate to the Circumstances for the Auxiliary Control Air System Train A |
05000390/FIN-2016008-02 | 2016Q1 | H.3 | Failure to Perform Verification and Validation For Abnormal Operating Instructions For Unit 1 |
05000390/FIN-2016008-01 | 2016Q1 | H.3 | Failure to Perform 50.59 Screenings For Procedures For Unit 1 |
05000390/FIN-2016001-10 | 2016Q1 | H.3 | Failure to Maintain an Adequate Surveillance Procedure for Emergency Core Cooling System Venting |
05000390/FIN-2016001-06 | 2016Q1 | H.11 | Failure to Track Applicable Technical Specification Action Statement for Charging Pump Inoperability |
05000390/FIN-2016001-05 | 2016Q1 | S.1 | Failure to Use Approved Procedures to Place RHR Letdown In Service |
05000390/FIN-2016001-04 | 2016Q1 | H.12 | Failure to Place the RHR System in ECCSStandby Mode Prior to Exceeding an RCS Temperature of 212 oF |
05000390/FIN-2016001-03 | 2016Q1 | H.8 | Failure to Adequately Implement the Administration of Site Technical Procedures for TDAFW Pump Governor Calibration |
05000390/FIN-2016002-06 | 2016Q2 | H.14 | Failure to Satisfy TS LCO 3.6.3 |
05000390/FIN-2016002-02 | 2016Q2 | H.6 | Failure to Translate Design Requirements into a Maintenance Procedure for the 1B-B Charging Pump Room Cooler |
05000390/FIN-2016002-01 | 2016Q2 | | Failure to Ensure that a Train of Source Range Detection was Available to Monitor Neutron Population During a Fire Event |
05000390/FIN-2016201-01 | 2016Q2 | | Security |
05000390/FIN-2016002-10 | 2016Q2 | | Untimely 10 CFR 50.73 Notification of an Inoperable Rod Position Indication |
05000390/FIN-2016002-09 | 2016Q2 | | Untimely 10 CFR 50.73 Notification of Failure to Meet Technical Specification Surveillance Requirement 3.5.2.3 for the Emergency Core Cooling System |
05000391/FIN-2016002-08 | 2016Q2 | H.1 | Failure to Follow Maintenance Procedure Results in overspeed trip of the 2C-S Turbine Driven Auxiliary Feedwater Pump |
05000390/FIN-2016002-07 | 2016Q2 | | Untimely 10 CFR 50.73 Notification of Inoperable Containment Penetrations |
05000391/FIN-2016002-05 | 2016Q2 | H.14 | Failure to Perform A TDAFW Surveillance In Accordance With Procedures |
05000391/FIN-2016002-04 | 2016Q2 | H.5 | Failure to Follow Operability Procedure Results in Potential Inoperability of the 2A-A Auxiliary Feedwater Pump |
05000390/FIN-2016002-03 | 2016Q2 | | Untimely 10 CFR 50.73 Notification of an Inoperable Charging Pump |
05000390/FIN-2016003-01 | 2016Q3 | | Falsified Fire Watch Records |
05000391/FIN-2016011-03 | 2016Q3 | H.7 | Failure To Ensure Adequate Unit 2 Emergency Diesel Generator Surveillance Instructions |
05000391/FIN-2016011-04 | 2016Q3 | H.6 | Failure To Adequately Evaluate Available Net Positive Suction Head To The Unit 2 AFW Pumps |
05000390/FIN-2016003-02 | 2016Q3 | H.5 | Inappropriate Procedure used for Work Order Scope Change Results in Loss of 1B-B Shutdown Board. |
05000390/FIN-2016011-02 | 2016Q3 | H.6 | Failure To Adequately Evaluate Available Net Positive Suction Head To The Unit 1 AFW Pumps |
05000390/FIN-2016011-01 | 2016Q3 | H.7 | Failure To Ensure Adequate Unit 1 Emergency Diesel Generator Surveillance Instructions |
05000390/FIN-2016011-05 | 2016Q3 | | Common Service Station Transformers A and B General Design Criteria 17 Analyses |
05000390/FIN-2016403-01 | 2016Q3 | H.8 | Security |