05000348/LER-2004-002, Unit 1 Regarding B Train LOSP During Surveillance Testing

From kanterella
Jump to navigation Jump to search
Unit 1 Regarding B Train LOSP During Surveillance Testing
ML050040213
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/29/2004
From: Stinson L
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-04-2523 LER 2004-002-00
Download: ML050040213 (5)


LER-2004-002, Unit 1 Regarding B Train LOSP During Surveillance Testing
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3482004002R00 - NRC Website

text

L M. Stinson (Mike)

Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5181 Fax 205.992.0341 December 29, 2004 SOUTHERN A COMPANY Eniergy to Serve YourlWorld' NL-04-2523 Docket No.: 50-348 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Unit I Licensee Event Report 2004-002-00 B Train LOSP During Surveillance Testing Ladies and Gentlemen:

Joseph M. Farley Nuclear Plant - Unit I Licensee Event Report (LER) No. 2004-002-00 is being submitted in accordance with 10 CFR 50.73(a)(2)(iv)(A).

This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely, L. M. Stinson LMS/WAS/sdl Enclosure: Licensee Event Report 2004-002-00 cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, General Manager - Plant Farley RTYPE: CFA04.054; LC# 14195 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. S. E. Peters, NRR Project Manager - Farley Mr. C. A. Patterson, Senior Resident Inspector - Farley I,-

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 06130/2007

6-2004) the NRC may r

fr ec b

)

not conduct or sponsor, and a person Is not required to respond to, the digits/characters for each block) information collection.

3. PAGE Joseph M. Farley Nuclear Plant - Unit 1 05000 348 1 OF 4
4. TITLE B Train LOSP During Surveillance Testing
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED SEUN1A E

FACILITY NAME DOCKET NUMBER MOTH DAY EAR YEAR l MSEEQUE NLRN. MONTH DAY YEAR N

05000 FACILITY NAME DOCKET NUMBER 11 05 2004 2004 - 002 -

00 12 29 2004 05000

9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR§: (Check all that apply)

O 20.2201(b)

El 20.2203(a)(3)(i)

El 50.73(a)(2)(i)(C)

El 50.73(a)(2)(vii) 6 El 20.2201(d) al 20.2203(a)(3)(ii)

El 50.73(a)(2)(ii)(A)

El 50.73(a)(2)(viii)(A) o3 20.2203(a)(1)

El 20.2203(a)(4) 0l 50.73(a)(2)(ii)(B) al 50.73(a)(2)(viii)(B) 20.2203(a)(2)(i)

El 50.36(c)(1)(i)(A)

Ea 50.73(a)(2)(iii)

El 50.73(a)(2)(ix)(A)

10. POWER LEVEL El 20.2203(a)(2)(ii)

El 50.36(c)(1)(ii)(A)

El 50.73(a)(2)(iv)(A)

El 50.73(a)(2)(x)

El 20.2203(a)(2)(iii)

El 50.36(c)(2)

El 50.73(a)(2)(v)(A)

El 73.71(a)(4)

El 20.2203(a)(2)(iv)

El 50.46(a)(3)(ii)

El 50.73(a)(2)(v)(B)

Dl 73.71 (a)(5) 0 El 20.2203(a)(2)(v) 0l 50.73(a)(2)(i)(A)

Dl 50.73(a)(2)(v)(C)

El OTHER El 20.2203(a)(2)(vi) 0l 50.73(a)(2)(i)(B)

El 50.73(a)(2)(v)(D)

Specify in Abstract below or In (If more space is required, use additional copies of (If more space is required, use additional copies of NRC Form 366A) (17)

Additional Information

As an enhancement already planned prior to this event, the daily surveillance schedule will be incorporated into the integrated work planning schedule by May 1, 2005.

The lB MDAFW pump is not being reported as a failure in this LER since it had not been returned to service following maintenance activities.

The following LER has been submitted in the past two years concerning unplanned ESF actuations other than reactor trips:

LER 2003-003-00 Unit 1, Unplanned Auxiliary Feedwater Actuation upon Trip of Steam Generator Feed Pump.

NRC FORM 366 (7-2001)