05000348/FIN-2010002-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Re-Evaluate Significant Changes in Assumption to Prompt Operability Determination of Unit 2 TDAFW Pump |
Description | The inspectors identified a Green NCV of 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings for the failure to implement procedure NMP-AD-012, Operability Determinations and Functionality Assessments. Specifically, the licensee failed to revise the existing prompt determination of operability (PDO) as required by NMP-AD-012 for the Unit 2 Turbine Driven Auxiliary Feedwater (TDAFW) pump when significant non-conservative changes in water content of oil samples challenged assumptions used to establish pump operability. This issue was entered into the licensees CAP as CR 2010101426. The finding is more than minor because it is associated with the reactor safety mitigating systems cornerstone attribute of equipment performance and adversely affected the associated cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Additionally, this finding was analogous to MC0612, Appendix E example 3.j in that a reasonable doubt about the continued operability of the pump existed prior to further evaluation. This finding was assessed using the Phase 1 screening worksheets of Appendix 4 of MC 0609, SDP and determined to be of very low safety significance because the finding did not result in the loss of safety function of a single train or screen as risk significant due to external events. This finding was assigned a cross-cutting aspect in the Resources component of the Human Performance area in that complete, accurate and up-to-date design documentation, procedures, work packages, and correct labeling of components were not provided (H.2(c)). Specifically, the oil sampling program procedures and methods lacked the detail and rigor necessary to verify assumptions in the PDO and called into question the continued operability of the TDAFW pump |
Site: | Farley |
---|---|
Report | IR 05000348/2010002 Section 1R15 |
Date counted | Mar 31, 2010 (2010Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | S Rose R Berryman C Even S Sandal L Pressley E Crowe S Shaeffer J Nadel |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |