05000348/FIN-2009405-01 | 2009Q1 | H.8 | Nuclear Security Officer not Capable of Maintaining Continuous Communication |
05000348/FIN-2009002-01 | 2009Q1 | H.7 | Inadequate Maintenance Instructions Results in Inoperability of the TDAFW Pump (Section 1R19) |
05000348/FIN-2009006-01 | 2009Q1 | | Inadequate Verification of SW Capability to Concurrently Provide System Design Basis Cooling Requirements and the AFW Alternate Water Source (Section 1R21.2.1) |
05000348/FIN-2009006-02 | 2009Q1 | | Degraded Emergency Air System Conditions (Section 1R21.2.11) |
05000348/FIN-2009405-02 | 2009Q1 | H.8 | Inadequate Continuing Behavioral Observation Program |
05000348/FIN-2009003-03 | 2009Q2 | | Failure to Include Water Tight Doors in the Scope of the Maintenance Rule |
05000348/FIN-2009003-02 | 2009Q2 | H.9 H.2(b) | Inadequate Test Procedures for Verification of Steam Dump Arming From Reactor Trip (P-4) Signal and P-4 Contact Verification |
05000348/FIN-2009003-01 | 2009Q2 | P.3 | Inadequate Test Procedures for SG Blowdown Isolation Valves |
05000348/FIN-2009502-01 | 2009Q2 | H.2 | Inaccurate Tone Alert Radios Addresses |
05000348/FIN-2009004-04 | 2009Q3 | H.8 | Failure to Implement Procedures Used to Prevent Seismic Interaction with Safety-Related Equipment |
05000348/FIN-2009004-05 | 2009Q3 | P.2 | Degraded Emergency Air System Conditions |
05000348/FIN-2009004-03 | 2009Q3 | | Load Sequencer Operability during EDG Surveillance Tests |
05000348/FIN-2009004-01 | 2009Q3 | | Failure to Implement Performance Monitoring of Service Water Pump Seismic Supports |
05000348/FIN-2009004-02 | 2009Q3 | H.8 | Failure to Implement Surveillance Test Instructions to Prevent Over-Speed of the TDAFW Pump |
05000348/FIN-2009007-01 | 2009Q4 | | Inadequate Procedure for the B train SSPS System Testing |
05000348/FIN-2009005-01 | 2009Q4 | | Failure to Identify A Credible Source of Flooding in the Internal Flooding Evaluation of Record |
05000348/FIN-2009005-02 | 2009Q4 | H.4 H.5 | Failure to Implement Maintenance Inspections of Safety-Related Switchgear |
05000348/FIN-2009005-03 | 2009Q4 | H.8 | 1-2 R Load Center Inoperability |
05000348/FIN-2009005-04 | 2009Q4 | P.3 | Failure to Implement Performance Monitoring of Service Water Pump Seismic Supports |
05000348/FIN-2009005-05 | 2009Q4 | | Load Sequencer Operability during EDG Surveillance Tests |
05000348/FIN-2009403-01 | 2009Q4 | H.1 | Security |