| Title | Failure to Verify the Adequacy of the Voltage Supplied to Transformer #64 Load Tap Changer |
| Description | The team identified a finding of very-low safety significance (Green) and an associated NCV of 10 CFR Part 50, Appendix B, Criterion III, Design Control, for the failure to verify the adequacy of the voltage supplied to the transformer #64 load tap changer. Specifically, the licensee did not perform calculations to verify that the load tap changer controls and actuator would have adequate voltage to be able to reset the degraded voltage relays following a design basis accident (DBA). The licensee captured this issue in their CAP as CARD 16-26702 and performed an operability evaluation that reasonably determined the voltage would marginally be acceptable to operate the load tap changer controls and actuator. The performance deficiency was determined to be more-than-minor because it was associated with the Mitigating Systems cornerstone attribute of design control and affected the cornerstone objective of ensuring the availability, reliability, and capability of mitigating systems to respond to initiating events to prevent undesirable consequences. The finding screened as of very-low safety significance (Green) because it did not result in the loss of operability or functionality of mitigating systems. Specifically, the licensee performed an operability evaluation that reasonably showed voltage would be marginally acceptable to operate the load tap changer controls and actuator when required during a DBA. The team determined that the associated finding had a cross-cutting aspect in the area of Problem Identification and Resolution because the licensee did not conduct a self-critical and objective assessment of its programs and practices. Specifically, the licensee reviewed the applicability of a similar violation issued to a different licensee during the 2015 Component Design Bases Inspection Self-Assessment and concluded that it did not apply to Fermi. |
| Site: | Fermi |
|---|---|
| Report | IR 05000341/2016007 Section 1R21 |
| Date counted | Sep 30, 2016 (2016Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.21 |
| Inspectors (proximate) | B Jose G Gardner G Nicely J Benjamin M Jeffers N Feliz-Adorno N Valos R Baker R Fernandes V Petrella |
| Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
| CCA | P.6, Self-Assessment |
| INPO aspect | CL.2 |
| ' | |