| Q | CCA | Title |
---|
05000341/FIN-2015008-02 | 2015Q1 | | Temporary Change Notice Administrative Conduct Manual MGA04 Deficiency |
05000341/FIN-2015008-04 | 2015Q1 | H.14 | Failure to Test the Electrical Characteristics for Control Power Transformers to Verify the Degraded Voltage Calculations Results |
05000341/FIN-2015001-01 | 2015Q1 | H.2 | Failure to Correct a Nonconforming Condition Adversely Affecting Plant Safety with the Reactor Building Steam Tunnel Floor Drain |
05000341/FIN-2015001-02 | 2015Q1 | H.1 | Failure to Perform Functionality Assessments for Degraded and Nonconforming Plant Conditions |
05000341/FIN-2015001-04 | 2015Q1 | H.8 | Operation Above the Licensed Thermal Power Limit |
05000341/FIN-2015008-01 | 2015Q1 | | Failure to Translate TS 3.7.4 Requirements Correctly into Plant Procedures |
05000341/FIN-2015008-03 | 2015Q1 | | Inadequate 10 CFR 50.59 Evaluation for the On-Line NobleChemTM Process |
05000341/FIN-2015001-03 | 2015Q1 | | Unplanned Scrams Per 7,000 Critical Hours Performance Indicator Question |
05000341/FIN-2015002-01 | 2015Q2 | | Failure to Maintain Self-Contained Breathing Apparatus Components |
05000341/FIN-2015003-01 | 2015Q3 | | Inadequate Simulator Fidelity Regarding the Ability to Model Thermal-Hydraulic Instabilities |
05000341/FIN-2015301-01 | 2015Q3 | | Inadequate Examination Security on a Simulator Reset |
05000341/FIN-2015003-05 | 2015Q3 | | Failure to Maintain Adequate Procedures to Respond to Thermal-Hydraulic Instabilities |
05000341/FIN-2015003-04 | 2015Q3 | P.5 | Failure to Perform Preventive Maintenance on SafetyRelated Auxiliary Trip Unit Relays for the Spent Fuel Pool Ventilation Exhaust Radiation Monitors |
05000341/FIN-2015003-02 | 2015Q3 | H.6 | Failure to Incorporate Operating Experience Into Preventive Maintenance Activities Associated With RPS Timing Relays |
05000341/FIN-2015003-06 | 2015Q3 | H.13 | Failure to Adequately Assess Plant Impact for Post-Maintenance Testing on RBHVAC |
05000341/FIN-2015003-03 | 2015Q3 | P.1 | Failure to Establish Correct Classification and Preventive Maintenance for Reactor Recirculation Pump Flow Switches |
05000341/FIN-2015406-01 | 2015Q3 | H.12 | Security |
05000341/FIN-2015004-01 | 2015Q4 | H.12 | Failure to Satisfy Technical Specification Requirements During an Unplanned Operation with the Potential to Drain the Reactor Vessel |
05000341/FIN-2015007-01 | 2015Q4 | P.2 | Failure to Comply with ASME B30.16 for Planned Engineered Lifts |
05000341/FIN-2015403-01 | 2015Q4 | | Security |