05000341/FIN-2016001-10
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Satisfy 10 CFR 50.72 and 10 CFR 50.73 Reporting Requirements for Primary Containment Isolation Valve Actuations |
Description | The inspectors identified a Severity Level IV NCV of 10 CFR 50.72(a)(1), Immediate Notification Requirements for Operating Nuclear Power Reactors, and 10 CFR 50.73(a)(1), Licensee Event Report [LER] System. Specifically, the licensee failed to make a required 8-hour non-emergency notification call to the NRC Operations Center and also failed to submit a required within 60 days after discovery of a condition that resulted in the valid actuation of containment isolation signals affecting containment isolation valves in more than one system on September 13, 2015, and September 14, 2015 (two separate occurrences). Subsequently, the licensee made an 8-hour notification call on February 27, 2016 to the NRC Operations Center via the Emergency Notification System to report the events (Event Notice 51391, third update). The licensee entered this issue into its corrective action program to evaluate the cause for its failure to satisfy the reporting requirements and to identify appropriate corrective actions. Consistent with the guidance in IMC 0612, Power Reactor Inspection Reports, Appendix B, Issue Screening, dated September 7, 2012, the inspectors determined the performance deficiency was of minor significance based on No answers to the more-than-minor screening questions. However, in accordance with Section 6.9.d.9 of the NRC Enforcement Policy, this violation was categorized as Severity Level IV because the licensee failed to report as required by 10 CFR 50.72(a)(1)(ii) and 10 CFR 50.73(a)(1). No cross-cutting aspect is associated with this traditional enforcement violation because the associated performance deficiency was determined to be of minor significance and therefore not a finding. |
Site: | Fermi ![]() |
---|---|
Report | IR 05000341/2016001 Section 4OA3 |
Date counted | Mar 31, 2016 (2016Q1) |
Type: | TEV: Severity level IV |
cornerstone | Other |
Identified by: | NRC identified |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | B Dickson B Kemker J Nance P Smagaczb Kemkerg Hansen I Hafeez K Pusateri K Riemer M Beilby T Briley V Myers |
Violation of: | 10 CFR 50.72(a)(1)(ii) 10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation |
INPO aspect | |
' | |
Finding - Fermi - IR 05000341/2016001 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Fermi) @ 2016Q1