| Q | CCA | Title |
---|
05000341/FIN-2015003-01 | 2015Q3 | | Inadequate Simulator Fidelity Regarding the Ability to Model Thermal-Hydraulic Instabilities |
05000341/FIN-2015301-01 | 2015Q3 | | Inadequate Examination Security on a Simulator Reset |
05000341/FIN-2015003-05 | 2015Q3 | | Failure to Maintain Adequate Procedures to Respond to Thermal-Hydraulic Instabilities |
05000341/FIN-2015003-04 | 2015Q3 | P.5 | Failure to Perform Preventive Maintenance on SafetyRelated Auxiliary Trip Unit Relays for the Spent Fuel Pool Ventilation Exhaust Radiation Monitors |
05000341/FIN-2015003-02 | 2015Q3 | H.6 | Failure to Incorporate Operating Experience Into Preventive Maintenance Activities Associated With RPS Timing Relays |
05000341/FIN-2015003-06 | 2015Q3 | H.13 | Failure to Adequately Assess Plant Impact for Post-Maintenance Testing on RBHVAC |
05000341/FIN-2015003-03 | 2015Q3 | P.1 | Failure to Establish Correct Classification and Preventive Maintenance for Reactor Recirculation Pump Flow Switches |
05000341/FIN-2015406-01 | 2015Q3 | H.12 | Security |
05000341/FIN-2015004-01 | 2015Q4 | H.12 | Failure to Satisfy Technical Specification Requirements During an Unplanned Operation with the Potential to Drain the Reactor Vessel |
05000341/FIN-2015007-01 | 2015Q4 | P.2 | Failure to Comply with ASME B30.16 for Planned Engineered Lifts |
05000341/FIN-2015403-01 | 2015Q4 | | Security |
05000341/FIN-2016001-02 | 2016Q1 | H.14 | Failure to Correctly Interpret and Implement TS Requirements for RPS Trip Functions |
05000341/FIN-2016001-10 | 2016Q1 | | Failure to Satisfy 10 CFR 50.72 and 10 CFR 50.73 Reporting Requirements for Primary Containment Isolation Valve Actuations |
05000341/FIN-2016001-05 | 2016Q1 | | Failure to Satisfy 10 CFR 50.73 Reporting Requirements for a Condition Prohibited by the Plants Technical Specifications |
05000341/FIN-2016001-03 | 2016Q1 | | Failure to Satisfy 10 CFR 50.72 and 10 CFR 50.73 Reporting Requirements for Loss of RPS Trip Safety Functions |
05000341/FIN-2016001-04 | 2016Q1 | P.4 | Failure to Incorporate Operating Experience into Preventive Maintenance Activities Associated with the TBCCW System |
05000341/FIN-2016001-09 | 2016Q1 | H.1 | Inadvertent Reactor Water Low Level Reactor Protection System Actuation Due to Operator Error |
05000341/FIN-2016001-08 | 2016Q1 | | Failure to Follow Apparent Cause Evaluation Procedure |
05000341/FIN-2016001-07 | 2016Q1 | | Inadequate Test Criteria in SGTS Flow/Heater Operability Surveillance Test |
05000341/FIN-2016001-06 | 2016Q1 | | Failure to Translate Design Requirements of the RHRHVAC System into Procedures |
05000341/FIN-2016001-01 | 2016Q1 | | Failure of the Plant-Referenced Simulator to Demonstrate Expected Plant Response for Safety Relief Valves |
05000341/FIN-2016002-06 | 2016Q2 | | Failure to Implement Adequate Preventive Maintenance on Spare Terminals in Safety-Related Motor Control Centers |
05000341/FIN-2016002-05 | 2016Q2 | | Failure to Use Correct Material in a Feedwater Heater Level Control Valve Resulted in a Loss of Feedwater Heater Drains and a Reactor Recirculation System Runback |
05000341/FIN-2016002-04 | 2016Q2 | P.2 | Failure to Control the Work Hours of Covered Workers |
05000341/FIN-2016002-02 | 2016Q2 | | Inadequate Test Procedure Used for Measuring and Determining Average Silt Levels in the Service Water Reservoir |
05000341/FIN-2016201-01 | 2016Q2 | | Security |
05000341/FIN-2016002-03 | 2016Q2 | H.9 | Loss of Power Instrumentation TS 3.3.8.1 Applicability Following Bus 64C Potential Transformer Fuse Failures |
05000341/FIN-2016002-01 | 2016Q2 | H.12 | Failure to Control Combustible Materials |
05000341/FIN-2016406-01 | 2016Q2 | H.13 | Security |