| Q | CCA | Title |
---|
05000298/FIN-2012002-01 | 2012Q1 | P.2 | Failure to Maintain Design Control for Internal Flooding |
05000298/FIN-2012002-02 | 2012Q1 | P.2 | Failure to Scope Required Components in the Stations Maintenance Rule Monitoring Program |
05000298/FIN-2012002-03 | 2012Q1 | H.12 | Failure to Appropriately Manage Risk for Maintenance in the Stations Switchyard |
05000298/FIN-2012002-04 | 2012Q1 | | Failure to Maintain Design Control of Standby Liquid Control System |
05000298/FIN-2012002-05 | 2012Q1 | H.7 | Unevaluated Pre-conditioning for Core Spray Motor-operated Valves prior to Conducting As Found In-service Surveillance Testing |
05000298/FIN-2012002-06 | 2012Q1 | H.14 | Failure to Follow Radiation Work Permit Requirements |
05000298/FIN-2012002-07 | 2012Q1 | | Failure to Furnish Evidence of an Activity Affecting Quality |
05000298/FIN-2012002-08 | 2012Q1 | H.2 | Failure to Follow Station Procedure Results in Inadequate Work Instructions |
05000298/FIN-2012007-02 | 2012Q2 | H.14 | Failure to Provide Adequate Resistance Values for the Preventative Maintenance of the Non-Segregated Phase Bus Duct |
05000298/FIN-2012003-11 | 2012Q2 | H.5 | ALARA Program Failed to Prevent Unintended Doses for Refueling Floor Activities, Outage RE26 |
05000298/FIN-2012003-12 | 2012Q2 | H.14 | Failure to Maintain Design Control of the Essential Ventilation System |
05000298/FIN-2012003-13 | 2012Q2 | H.14 | Fail to Correct a Condition Adverse to Quality for Determining the Number of Multiply Starts for a Single Diesel Generator Starting Air Accumulator |
05000298/FIN-2012003-14 | 2012Q2 | H.14 | Failure to Use Design-Basis Parameter Values in Design-Related Calculations |
05000298/FIN-2012404-01 | 2012Q2 | H.14 | Security |
05000298/FIN-2012007-06 | 2012Q2 | P.2 | Failure to Incorporate all Design and Technical Data Available into the Operability Determinations for the Standby Liquid Control Tank and Test Tank |
05000298/FIN-2012007-05 | 2012Q2 | P.3 | Failure to Have an Adequate Procedure for Erecting Flood Barriers |
05000298/FIN-2012007-04 | 2012Q2 | | Failure to Establish a Preventative MaintenanceProgram for Molded Case Circuit Breakers |
05000298/FIN-2012007-03 | 2012Q2 | | Failure to Address the Design Bases of the Battery Chargers Following Identification of an Undersized Fused Disconnect Switch Connecting the Swing Battery Chargers to the Direct Current (DC) Buses |
05000298/FIN-2012404-02 | 2012Q2 | H.7 | Security |
05000298/FIN-2012007-01 | 2012Q2 | H.2 | Failure to Adequately Analyze Seismic Requirements for Service Water instrument Rack |
05000298/FIN-2012003-10 | 2012Q2 | H.13 | Failure to Perform a Radiation and Contamination Survey |
05000298/FIN-2012003-09 | 2012Q2 | H.14 | Failure to Follow Radiation Work Permit Requirements |
05000298/FIN-2012003-08 | 2012Q2 | P.2 | Non-conservative Service Water Booster Pump A and D Differential Pressure Operability Limits During In-Service Surveillance Testing |
05000298/FIN-2012003-07 | 2012Q2 | H.14 | Failure to Evaluate Changes for Adverse Impacts |
05000298/FIN-2012003-06 | 2012Q2 | H.8 | Design Changes Not Appropriately Approved by the Licensee |
05000298/FIN-2012003-05 | 2012Q2 | | Failure to Furnish Evidence of an Activity Affecting Quality |
05000298/FIN-2012003-04 | 2012Q2 | P.2 | Failure to Maintain Design Control of the Standby Liquid Control System and Sumps Credited in the Internal Flooding Analysis |
05000298/FIN-2012003-03 | 2012Q2 | H.14 | Failure to Recognize the Need for An Evaluation and to Properly Document the Bases for Operability |
05000298/FIN-2012003-02 | 2012Q2 | H.14 | Failure to Ensure Compliance with the Requirements of Station Troubleshooting Procedure |
05000298/FIN-2012003-01 | 2012Q2 | H.7 | Failure to Perform Adequate Postmaintenance Testing |
05000298/FIN-2012004-01 | 2012Q3 | | Failure To Maintain Design Control of the Emergency Diesel Generators Voltage Regulator Cabinets |
05000298/FIN-2012004-10 | 2012Q3 | H.14 | Failure to Follow Surveillance Procedures for Reactor Equipment Cooling |
05000298/FIN-2012004-06 | 2012Q3 | | Failure to Obtain Prior NRC Approval for a Change Regarding the Supplemental Diesel Generator |
05000298/FIN-2012004-02 | 2012Q3 | H.14 | Failure to Demonstrate that Emergency Diesel Generators can Perform Multiple Air Starts from a Single Air Receiver |
05000298/FIN-2012004-03 | 2012Q3 | H.7 | Failure to Maintain Design Control of the Reactor Equipment Cooling System |
05000298/FIN-2012004-04 | 2012Q3 | H.14 | Failure to Control Vendor Changes to a Service Water Booster Pump |
05000298/FIN-2012004-05 | 2012Q3 | H.14 | Failure to Adequately Assess and Manage Risk for Maintenance Activities That Affected the A Zurn Strainer |
05000298/FIN-2012004-07 | 2012Q3 | P.3 | Failure to Provide Procedure Appropriate to the Circumstance of Assembling the Zurn Strainer |
05000298/FIN-2012004-09 | 2012Q3 | P.1 | Failure to Correct Exercise Performance Deficiencies |
05000298/FIN-2012004-08 | 2012Q3 | H.14 | Failure to Consider All Relevant Information and Appropriately Assess Operability When A Degraded Nonconforming Condition Was Identified |
05000298/FIN-2012005-09 | 2012Q4 | H.13 | Failure to Follow Procedure and Initiate Condition Reports When Degraded Nonconforming Conditions Were Identified |
05000298/FIN-2012005-02 | 2012Q4 | P.2 | Failure to Adequately Monitor the Performance of Roof Drains |
05000298/FIN-2012005-08 | 2012Q4 | H.5 | Failure to Perform an Adequate Radiological Survey |
05000298/FIN-2012005-07 | 2012Q4 | H.2 | Failure to Follow Radiation Protection Procedures |
05000298/FIN-2012005-06 | 2012Q4 | H.14 | Failure to Perform Radiation Surveys Before Allowing Work to Commence |
05000298/FIN-2012005-05 | 2012Q4 | P.2 | Failure to Maintain Design Control of the Service Water Booster Pumps |
05000298/FIN-2012005-04 | 2012Q4 | H.14 | Failure to Consider All Relevant Information and Appropriately Assess Operability when a Degraded Nonconforming Condition was Identified |
05000298/FIN-2012005-03 | 2012Q4 | H.14 | Failure to Follow Procedural Requirements During Roof Inspection |
05000298/FIN-2012005-01 | 2012Q4 | P.2 | Inadequate Maintenance Procedure for the Service Water Pump Room |