The inspectors identified a
NCV of
10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures and Drawings, for failure to perform an immediate
operability determination (IDO) for 3A
Emergency Diesel Generator (
EDG) upon discovering a degraded condition. Specifically, on December 19, 2017, the licensee failed to perform an IDO after identifying and confirming less than minimum cooling flow, thus leaving the
EDG in an indeterminate state of operability.The performance deficiency is more than minor because it was associated with the equipment performance attribute and affected the associated cornerstone objective to ensure availability, reliability and capability of systems that respond to
initiating events to prevent undesirable consequences. As a corrective action, the licensee performed operations to restore flow within the acceptable range and performed an IDO. The violation was entered into the licensee's
CAP as CR 1370601. The inspectors determined that the finding had a cross-cutting aspect in the human performance area of H.13, Consistent Process, because the performance deficiency was caused by not following a consistent, systematic approach to making a decision concerning operability of the affected
DG.